Change Impact Analysis Template


This template is based on ACMP Standard for Change Management, it should be adapted to fit your specific situation.

Stakeholder Change Impact Title Description Impact on People

To learn more see ACMP Standard Section 5.1.7 Assess the Change Impact in the ACMP Standard and 5.1.15 Conduct Change Risks Asses
Headings with a green background are directly referenced in the ACMP Standard. Headings with an orange background are additional headin

ACMP Definition
Change Risk - An event or condition that, if it occurs, may have an effect on the change benefits.

Acknowledgement:​
jTask acknowledges the Association for Change Management Professionals® (ACMP®) Standard for Change Management©, hereinafter refe
Some material that has been directly quoted from the ACMP Standard content is clearly designated indicating what paragraph in the ACMP S

Legal information:​
jTask™, the jTask logo, jTask Consulting™ jTask CCMP Training™,and jTask Pulse™ are trademarks of jTask, Inc. ​
The ACMP logo, ACMP® and the Association of Change Management Professionals® are registered trademarks. Certified Change Managem
MemoryPak™ is a trademark of Watson Educational Games.​
All other trademarks, registered trademarks, service marks, and related branding marks (possibly unmarked) used in this course are the legal
Impact on Processes Impact on Tools Impact on Org Structure

1.15 Conduct Change Risks Assessment


background are additional headings that could be added to the template.

ge Management©, hereinafter referred to as “the ACMP Standard”, as being the basis for developing this template. 
ng what paragraph in the ACMP Standard contains the quoted material.​

marks. Certified Change Management Professional™ (CCMP™) is a trademark of ACMP. The Standard for Change Management© is a copyright of the AC

d) used in this course are the legal property of their respective owner


Impact on Roles Impact on Technology Size Scope Timing Complexity

his template. 

rd for Change Management© is a copyright of the ACMP. ​


Owner Current State Future State Value of Change Action Required
Description Description

Impacts are often defined as the consequenc


effects of a risk event on the project objective
These impacts can be both beneficial or harmf
the objectives. The impact of risk events on
different project objectives can be defined in b
qualitative and quantitative manner. These pro
objectives are cost, schedule, quality, scope, h
safety, etc.
Impact Probability Risk Score Mitigation Comments

[1-5] [1-5] = Impact + Probability

n defined as the consequences, or Probability, or likelihood, is the possibility of a


ent on the project objectives. risk event occurring. The likelihood can be
be both beneficial or harmful to expressed in both a qualitative and quantitative
e impact of risk events on manner. When discussing probability in a
bjectives can be defined in both a qualitative manner, terms such as frequent,
antitative manner. These project possible, rare etc. are used. It is also possible to
, schedule, quality, scope, health, describe the probability in a numerical manner.