Professional Documents
Culture Documents
PART 1 - GENERAL
1.1 DESCRIPTION:
A. The Work shall consist of furnishing and installation of all hangers and supports
for mechanical piping, ductwork and equipment as indicated on the drawings
and as specified herein.
1.2 REFERENCES:
MSS SP90 Guide Lines and Terminology for Pipe Hangers and Supports.
1.3 SUBMITTALS:
G. Pipe hangers and supports for fire protection system shall comply with NFPA
requirements.
F. Concrete Inserts: Inserts shall be of malleable iron body and nut with recessed
sides to accommodate reinforcing rods and lateral adjustments. Inserts shall
have 25 mm maximum body with width between reinforcing bars in ribs.
H. Eye Rods: Eye rods shall have welded eyes with left or right hand thread as
required.
I. Tube Straps: Copper-plated steel for copper tubing for pipe sizes up to and
including 25 mm diameter, with securing holes.
J. Beam Clamps: Malleable iron jaw with steel nut and bolt, steel hook rod with nut
and spring washer.
K. C-Clamps: Malleable iron clamps, with hardened steel cup point set screw
retainer lip and lock nut.
----------------------------------------------------------------------------------
Pipe Size Rod Size
----------------------------------------------------------------------------------
50 mm and smaller 10 mm
63 mm to 90 mm 13 mm
100 mm and 127 mm 16 mm
150 mm to 150 mm 19 mm
300 mm 25 mm
----------------------------------------------------------------------------------
-----------------------------------------------------------------------------------
Maximum Allowable
Pipe Size Spacing
-----------------------------------------------------------------------------------
25 mm 2130 mm
32 mm 2440 mm
38 mm 2740 mm
50 mm 3050 mm
62 mm 3350 mm
75 mm 3660 mm
100 mm 4270 mm
125 mm 4880 mm
150 mm 5180 mm
200 mm 5790 mm
250 mm 6710 mm
300 mm 7010 mm
-----------------------------------------------------------------------------------
2. The spacing shown on the schedule is maximum spacing pipe will span.
The hanger supports and structural elements of the building shall be
checked for load support. Spacing may have to be reduced to lighten load
on certain hanger supports.
--------------------------------------------------------------------------------------------------------
Longest Round Strap Trapeze Maximum
Dimension Hangers Hangers Shelf Spacing
Of Duct Angles
--------------------------------------------------------------------------------------------------------
up thru 450 ga.8 wire 25mm x 1.6mm 25x25x3mm 3050 mm
475-750 ga.8 wire 25mm x 1.6mm 25x25x3mm 3050 mm
775-1050 6 mm rod 25mm x 1.6mm 38x38x3mm 3050 mm
1075-1500 10 mm rod 25mm x 1.6mm 38x38x3mm 3050 mm
1525-2100 10 mm rod 38mm x 1.6mm 50x50x3mm 2440 mm
2125-2400 10 mm rod 38mm x 1.6mm 50x50x5mm 2440 mm
over 2425 10 mm rod 38mm x 1.6mm 50x50x6mm 2440 mm
---------------------------------------------------------------------------------------------------------
3.1 INSTALLATION:
A. General:
B. Vertical Piping:
C. Suspended Piping:
3.3 SUPPORT:
H. Branch piping hanger supports may be field drilled into concrete using
self-drilling type expansion shields. Expansion shields shall not be cut or unduly
displace reinforcement.