This document outlines the production process for an unnamed part. It includes 15 operations across two machines and lists details like operation name, machine name, manual and auto time per operation, and total time and production capacity per piece. However, all values are currently listed as 0, indicating the production details and metrics have not yet been determined.
This document outlines the production process for an unnamed part. It includes 15 operations across two machines and lists details like operation name, machine name, manual and auto time per operation, and total time and production capacity per piece. However, all values are currently listed as 0, indicating the production details and metrics have not yet been determined.
This document outlines the production process for an unnamed part. It includes 15 operations across two machines and lists details like operation name, machine name, manual and auto time per operation, and total time and production capacity per piece. However, all values are currently listed as 0, indicating the production details and metrics have not yet been determined.
Completion Operation Machine Total Time Production # Manual Time Auto Time Time per Name Name per Piece Capacity Piece 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0
Total: 0 0 Max Output 0
Process Name Part Number Quantity Needed per Day Prepared By
Net Operating Time (sec) Date
Basic Time (sec) Tool Change Time (sec) Summary (sec)
Completion Number of Operation Machine Time per Total Time Production # Manual Time Auto Time Time per Change Time Pieces per Name Name Piece per Piece Capacity Piece Change 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 11 0 12 0 13 0 14 0 15 0