Introduction.
A Loading Test on a pile is made for the purpose of finding the settlement to be expected at the
working load and at twice the working load. It could also be used to estimate ultimate bearing
capacity of a pile and checking the structural soundness of the pile.
a) Two (2) nos of anchor pile (working pile) of 1200mm will be installed to depth with socket
min.B.Om into sound GRANITE (bedrock). Design of socket length for geotechnical
capacity appended.
b) Reinforcement for tension pile will be 34T32, binder T12 @ 150 clc with 80 nos 15.24mm
(0.6") super strand will be tied to reinforcement of main bar for each tension pile with
embedment length of 5.0m into concrete with addition of 6.0m above the ground level.
c) The Tension Pile will be away from the Load Test pile by 3.00m and positioned in a
straight line.
d) Upon completion of boring to required length, reinforcement cage tied with 80 nos of
strand will be lowered into bored hole. Pour concrete G35 as specified.
e) Two supports will be used as seat to launch I-beam. I-beam will act as a transfer element
of load applied by jack (reading by load cell) to the tension pile. Strands on each tension
pile will be locked by barrel and wedges in a stressing block placed on top of I-beam.
f) The settlement of pile will be monitored by 4 nos of LVDT instruments by Spectest and
ruler on jacks by using dumpy level. 2 nos ruler will be provided attached to the frame and
one ruler at temporary bench mark. Scale ruler will be provided at tension pile to monitor
uplift of pile.
g) Reference frame should be supported on two foundation placed sufficiently far from the
pile not less 2m away. The foundation should be placed at sufficient depth below ground to
be unaffected by any movement.
i) Test load will be carry out based on loading procedure appended and on completion of
load test graph showing load and settlement versus time will be produce.
Appendix.
i. Test Diagram
Design condition
unit
Calculation
Summary
Use 2 nos tension pile of 1.20 m diameter ( NON-working pile) with socket length into rock 6.0m
Geomaterial: Rock,
fs ult: 1500.0 kPa ( 10% of rock que, say> 20MPa - medium strong rock)
actual sample que - refer to lab test results.
fs all : 750.0 kPa
fb ult: neglected
fb all: neglected
geotech test
Tension Pile: Reinforcement design
LOCA TlON: PRELIMINARY TEST PILE
Design condition
Calculation
Summary
reinforcement-1200cp
CHECK PILE STRESS:test pile 1200 mm diameter
LOCA nON: INSTRUMENTED PRELIMINARY TEST PILE
Design condition
Calculation
Design condition
Bonded length
ii.Galculation
iii.Calculation
Load diagram
Reaction pile
t- .- .- .]·92!l. - . - . - '1
Calculations ~'-'-'-'-'-'-'~?~~-'-'-'-'-'-I
Pmax 19700.0 kN
Span,L 6.00 m ( 3 X PILE DIAMETER)
Moment, M = Pmax X U4
Moment, M 29550 kNm
Sx, plastic modulus 23566 cm3 ,/' Sx, plastic modulus 188531 cm3
lx, elastic modulus 20570 cm3 Zx, elastic modulus 164556.9 cm3
lx,moment of inertia 998140 cm4 lx.rnoment of inertia 7985122.0 cm4
Depth of section, D 970.5 mm Depth of section, D 970.5 mm
Width of section,S 420.5 mm Width of section,S 1682 mm
Flange thickness, T 61.1 mm Flange thickness,T 61.1 mm
Web thicness,t 21.5 mm Web thicness,t 86 mm
Half of width, b 210.3 mm Half of width, b 841 mm
Depth between fillets, d 799.0 mm Depth between fillets, d 799.0 mm
1.02
Deflection at center
~ = PLA3/48EI
~= 5.42 mm
9'L,span = 902.6 < 1/360 ok
beam check-1200
Company: city piling @ 2009 Techno Consultants
mV ...
t
-I ( f) ::
1.
~
((~o.o:)(~ ) 2 S 7 J1; klU..."
r,t..th'tJ.., s w I'
r:
It..t1IW'\
a»J ~'()"'-'"
11 «s- ,~J. '1 -
h) S p'-I!1'}lrj Q rvl I ~l
,''' ~~, ~W?f
-.~I-.f-o-
t
I I
I BEAM DIMENSIONS.
Section: UB 914 x 419 x 388 kg/m with 25 mm plate at top/bottom flange and stiffeners plate welded to web.
Plate
Thickness of plate Tp 25 mm
Width of plate Bp 250 mm
Distance of plate, y' 472.75 mm
(plate center to section center)
Area of plate - 1no 62.5 cm2
1a) Settlement at each stage of maintain load shall not exceed 0.25mm
per hour before any load increment or decrement.
1b) Reading taken every 15 minutes for 1st hour and every 1hr interval for consecutive maintained period.
P = FI A
P: pressure on jack
F: Force, applied load.
A: Area of jack ramp area
A= IT' d"2/4
Conversion culculation
TEST: INSTRUMENTED PRELIMINARY TEST PILE
9000
3000
2 NOS.
1-BEAM--~-----I-~
/ r=:"
BARREL &. WEDGE
STRESSING BLOCK
O.6N
14
11j r"'~ x 2 NOS,
914x419x388kg/m
1- BEAM
i
i
SUPPORT.
RULER
CONCRETE MOCK
'., 1 .. '
- SUPPORT. CONCRETE
1200 xl200 x 50mmTHIC
PILE HEAD
MOCK
M.S PLATE
:1
.
q,
E
g
+- REBAR AS PER DWG
b
TEST PILES0 -.
...'
-I~
ANCHOR PILES
-J
ANCHOR PILES
~
(2) dkr. lOOOmm. (21dio. lOOOmm.
,.
,[+- 15.24mm 0
, PC STRAND
TO BOnOM
REBAR T32 (34 NOS)
I-
I
DISBANDED POCSTRAND \. ., <J
m
EMBEDED INT , I
feu - CONCRETE w lS.24mm (0 PC STRAND
L> ,.. " .•
-' 5m + 6.0m (EXPOSED)
'-. '.>
0:: (80 NOS)
I i! r JUtl' ~ i 1
L,l i -iim +~l\
-k-r- ( .
L_ )
i !
fl_ltlW1H (
) .'.... '. '/ \
~=r
\
l~( )' .," ( TT
---,- e , :.~\
i ) ) ,.',
Li :---LO
I ( \
1,; "
DESIGNED PULL-OUT
1.1200.1 FORCE - 985 TONS
1200mm 34T32
1200mm 80 NOS 19700 kN
( 2nos x 22.0 )'" T12-150 clc
REFERENCES