You are on page 1of 8

CURRICULAM VITAE

Name: MOINUDDIN KASIM SAHEB

COVID VACCINE: COVID Vaccinated Pfizer 2 doses at Saudi Arabia.

Email: moin240777@gmail.com

Mobile number +966580163441

Saudi Aramco SAP# 8104783

IMO calling: Moinuddin Qasim, +919611777107

Industry type serving: Oil & Gas, Power, Petrochemical, Refineries.

Current location: Saudi Arabia

Driving License. Valid Saudi Arabian Light Driving License up to May 2029.

Job title applied for: ONSHORE FACILITIES INSTALLATION LEAD

Relocation preferences: Available

Career Objective: I am seeking to join an organization in which I can have a real opportunity to
develop & advance my experience to build my professional career.

Resume: A visionary in Project & Construction Management, Piping & Mechanical,


specializing in Oil & Gas, Power, Petrochemicals & Alumina Refineries.
Mechanical Engineering led large time-critical projects from inception through
successful installation & completion. Strategic planner with comprehensive
management, organizational & project execution.

Key Technical Skills: Leadership/Communication Skills, Project Engineering, Construction Management,


Detail Engineering, Documenting & Record keeping, Project Scope Management,
Project Change Management. Team building & Training, Static & Rotary
Equipment Erection, Piping Fabrication & Erection, Welding GTAW, SMAW &
NDE, Hydro Testing, Steel Structure Fabrication & Erection, Quality Engineering,
Site HSE.
EXPERIENCE: Total 18 years of cross functional experience.

1.Construction Manager. Currently working as, a Construction Manager (Installation Project Leader)
SAUDI ARAMCO with MCCL, for Haradh Gas Compression Project, Gas processing &
TECHNICAS REUNIDAS as Dehydration Train package.
EPC contractor. Activities includes but not limited to as following.
April 2021 till date  Two weeks look ahead planning.
 Preparation of Method Statements for Equipment, Piping & Structural
Erection.
 Preparation for Monthly Invoice/billing.
 Static & Rotary equipment installation, Distillation Column 116 Tons,
Pressure Vessels of 72T, Dust Collectors of 31T, Regenerative Air Heaters
48T, Positive Displacement Pumps 24T, Centrifugal pumps 28T, Shell &
Tube heat exchangers 38T, Surge Relief Skid 42T, Chemical Injection Skid
33T.
 Fabrication & erection of steel structures, platforms, pipe supports, steel
pipe rack.
 On-Plot piping spool fabrication & erection with respect to ASME B 31.1,
31.3, standards.
 Carbon Steel of size 32”,24”20”, LTCS, piping, steam tracing.
2.Construction Manager.  Assistance to QC team for Welder Qualification.
Client: Mangalore Refinery &
Petrochemicals Ltd. Worked for Mangalore Refinery & Petrochemicals Ltd (MRPL), India with
April 2019 to March 2020. Raman Engineering & Constructions, for construction of Amine Regeneration
Unit Package.
Activities include
 Construction Management,
 Scope & Change management.
 Two weeks look ahead planning.
 Preparation of Method Statements for Equipment, Piping & Structural
Erection, Hydro testing, Pneumatic testing, Bolt Torqueing.
 Preparation for Monthly Invoice/billing.
 Erection of steel structures, equipment supporting structures
 Static & Rotary equipment erection.
 Equipment erection like Columns of 114T, Air cooled Heat Exchangers of
56T, Dust Collectors 45T, Skids.
 Regenerative Air Heaters 38T, Positive Displacement Pumps 24T,
Centrifugal pumps.
 Shell & Tube Heat Exchangers.
 Piping spool fabrication & erection with respect to ASME 31.3, standards,
Carbon Steel of size 24”,20”, 18”, LTCS, & Stainless steel piping, Rack
piping.
 Underground piping with respect to ASME B 31.4.
 Assistance to QC team for Welder Qualification.
 Non Destructive Testing.
 Holiday Testing.
 Hydro testing, Pneumatic Testing.
 Mechanical Completion, Reinstatement.
3.Project Engineer, PMT
SAUDI ARAMCO  Pre-commissioning & assistance in Commissioning.
Foster Wheeler for FEED
Worked with Al-Hoty, Saudi Aramco, Project Management Team,
Petrofac as EPC contractor. for construction for Sulfur Recovery Package, Fadhili Gas Plant 2.5 Billion
March 2016 to Dec’ 2018. standard cubic feet per day (scfd) capacity, Saudi Aramco’s Master Gas
Achievement: 50 million man-
System. Saudi Arabia, a Greenfield project.
hours safe LTI free.  Construction Management,
 Day to day problem solving, de-bottlenecking.
 Erection of static & rotary equipment,
 De-aerator vessels,
 Dust collectors,
 Gas Condensers,
 Air-cooled heat exchangers
 Fabrication & erection of equipment piping with respect to ASME B 31.3.
 GTAW & SMAW Welding of piping spools.
 Monitoring NDT activities at site for field joints.
 Preparation and conducting Hydro testing.
 Reinstatement post hydro testing.
 Pre-commissioning and assistance in commissioning activities.
4.Project Engineer, PMT
SAUDI ARAMCO Worked for Jazan Refinery Terminal in Kingdoms Jazan region, with a
KBR AMCDE for FEED. 400,000 barrels per day of capacity
JGC for construction of Benzene Company Al-Hoty, Saudi Aramco, Project Management Team,
& Para Xylene Units as EPC
contractor.  Construction Management,
August 2014 to March 2016,  Reviewing & resolving design & construction issues at site along with
contractor.
 Scope & Change management.
 Two weeks look ahead planning.
 Preparation of Method Statements for Equipment, Piping & Structural
Erection, Hydro testing, Pneumatic testing, Bolt Torqueing.
 Preparation for Monthly Invoice/billing.
 Static & Rotary equipment installation.
 Equipment erection like Pressure Vessels of weight 24T, Dust Collectors of
weight 16T, Regenerative Air Heaters 19T, Positive Displacement Pumps
6T, Centrifugal pumps
 Shell & Tube heat Exchangers.
 Piping spool fabrication & erection with respect to ASME 31.3, standards,
Carbon Steel of size 24”,20”, 18”, LTCS, & Stainless steel piping, Rack
piping.
 Assistance to QC team for Welder Qualification.
 Non Destructive Testing for piping welds.
 Hydro testing.
 Mechanical Completion, Reinstatement.
5.Construction Manager.  Pre-commissioning & assistance in Commissioning.
HPCL as client.
September 2013 to July 2014 Worked with HAPBCO Engineering & Construction Pvt. Ltd Expansion of
HPCL Oil Refinery Distillation & Hydro Treating Units, Vishakhapatnam,
India.
Erection of Structural steel platforms, equipment support, pipe support.
Piping and Mechanical scope of work with Piping spool fabrication, installation.
SMAW & GTAW welding.
Installation of static and rotary equipment like Pressure vessels, Heat exchangers,
Pumps & Compressors.
Installation of pipes along pipe racks.
Installation of structural piping supports
Hydro testing.
6.Construction Engineer.
SAUDI ARAMCO SATORP
Refinery. Worked for MMG Group for construction of SAUDI ARAMCO Total JV,
DAELIM as EPC contractor. SATORP Refinery a Greenfield Mega project. Jubail KSA.
April 2011 to June 2012  Erection of steel structures 15000 MT.
 Erection of Rotary & static equipment,
 Air coolers
 Dust collectors
 Heat Exchangers
 Erection alignment of On-plot equipment piping, Erection of Rack piping,
trunk lines 200,000 inch dia of welding of various sizes.
 Erection of Gate valves, Control Valves, Globe valves, Check valves.
 GTAW & SMAW welding.
 Coordinating field NDT activities for field welds.
 Hydro testing & pneumatic testing of erected spools.
 Resolving engineering issues at site with construction team.
 Reinstatement of hydro tested spools and equipment.
 Mechanical Completion.
7.Construction Engineer
SAUDI ARAMCO  Pre-commissioning & assistance in commissioning activities.
YASREF REFINERY
AIR LIQUIDE as EPC Worked for MMG Group for construction of SAUDI ARAMCO, SINOPEC
contractor. JV, YASREF Refinery a Greenfield Mega project, Yanbu KSA.
April 2012 to June 2013.  Construction Management,
 Reviewing & resolving design & construction issues at site along with
contractor.
 Scope & Change management.
 Two weeks look ahead planning.
 Preparation of Method Statements for Equipment, Piping & Structural
Erection, Hydro testing, Pneumatic testing, Bolt Torqueing.
 Preparation for Monthly Invoice/billing.
 Static & Rotary equipment installation.
 Equipment erection like Pressure Vessels of weight 24T, Dust Collectors of
weight 16T, Regenerative Air Heaters 19T, Positive Displacement Pumps
6T, Centrifugal pumps
 Shell & Tube heat Exchangers.
 Piping spool fabrication & erection with respect to ASME 31.3, standards,
Carbon Steel of size 24”,20”, 18”, LTCS, & Stainless steel piping, Rack
piping.
 Assistance to QC team for Welder Qualification.
 Non Destructive Testing for piping welds.
8.Project Engineer cum QC.  Hydro testing.
ANRAK Refinery  Reinstatement.
SNC LAVALIN for FEED
April 2010 to May 2011 Worked for ANRAK Alumina Refinery Vishakhapatnam, India with
HAPBCO Ltd. Construction of 1.5 MTPA Green field ANRAK Alumina
Refinery.
 15 days look ahead planning
 Material receiving.
 Over all piping fabrication & installation.
 Fabrication & installation of Piping spools, Rack piping,
 Erection of Steel structure pipe racks.
 Hydro Testing of spools.
9.Mechanical Engineer.  Reinstatement.
EMAL Smelter  Verifying contractor progress & monthly bills.
EPC by SNC LAVALIN &  Site safety & quality monitoring.
WORLEY PARSONS  Static equipment erection, alignment.
March 2009 May 2010
Worked with Petron Emirates Co. LLC Dubai UAE, for construction of
Emirates Aluminum Company (EMAL) Abu Dhabi, UAE,
 Piping fabrication & erection as per ASME B 31.3.
 SMAW welding.
 NDT of piping spools, Radiographic testing & penetrant test.
10.Mechanical Engineer.
GDPL as EPC & Client.  Hydro-testing of process lines, Cooling water lines, Air lines.
Germanischer Lloyds as TPI  High pressure hydraulic testing of Hydraulic Jack hammer lines.
Agency.  Assistance in pre-commissioning & commissioning activities.
June 2007 to March 2009
Worked with Petron Emirates Co. LLC for construction of Green Dome
Petrochemicals Ltd. Sharjah Free zone UAE.
Construction of Ammonia Chemical plant,
 Erection of static and rotary equipment
 Rotary air compressors, Boiler erection, Fired heater, Tubular Heat
exchangers, Displacement pumps, Vertical Columns, Pressure vessels,
Reactors.
 Piping fabrication & installation ASME B 31.1 Power Piping. (Boiler
Piping), High steam, Medium steam, Low steam lines, Cryogenic lines.
Carbon steel piping, LTCS piping, Duplex steel piping.
 GTAW Welding
 Post Weld Heat Treatment of piping.
 NDT of piping spools
 Hydro testing,
11.Mechanical Engineer.
SEWA Power Plant  Pneumatic testing,
SIDEM as EPC Contractor.  Pressurized cryogenic testing of piping system for process lines.
March 2006 to June 2007  Re-instatement
 MCC and final handing over to Operations department.

Worked with Sharjah Electricity & Water Authority & Petron Emirates Co.
LLC
Construction of Layyah Power plant & Desalination plant Sharjah, UAE
 Fabrication pre-assembly and erection of Heavy Steel structure, Platforms,
12.Mechanical Engineer. Walkways, Pipe supports.
Client ACC Ltd.
 Piping fabrication and installation as per ASME B 31.1 & 31.3.
October 2003 to Feb’ 2006.
 Piping welding and NDT.
 Hydro-testing and Reinstatement.
 Assistance in pre-commissioning & commissioning activities.

Worked under construction of new 25x6 MW Thermal Power plant for ACC
Wadi, Karnataka.
 Activities included Structural steel fabrication and erection.
 Rotary equipment erection.
 Erection of Steam Boilers, Turbine, Waste Gas fans, Economizer,
Job Description. Centrifugal pumps.
 Fabrication & erection of piping spools with respect to ASME B 31.1 &
31.3.
 Hydro testing of spools.
 Reinstatement and MC.

The Responsibilities of this position include but are not limited to the following,
 Manage and oversee Mechanical engineering projects of various sizes and
complexity.
 Analyze customer design proposals and specifications to determine cost
effective solutions.
 Ensure professional quality services in all facets of work.
 Lead a project team to ensure technical accuracy of project deliverables.
 Manage a team to ensure cost effective, safe and timely completion of
projects to meet or exceed client expectations.
 Manage project activities throughout life cycle, including the allocation of
adequate resources, documentation and other factors necessary for success.
 Work with clients to deliver the end project.
 Prepare and review specification and concept reports.
 Foster new business development opportunities.
 Maintain and grow current business and client relationships.
 Provide mentoring to technical staff, assigning duties as required.
 Provide quality and cost control during the design and construction process.
 Maintain project schedules and project cost summaries to track work
progress, budget status, and manpower resource utilization.
 Escalate and identify the need for additional services as per project scope
requirement.
 Assist with Shop drawing reviews as required.
 Optimum use of construction knowledge & experience in Planning, Design,
Procurement & field operations to achieve overall project objectives.
 Review projects designs for constructability & suggest enhancements to
improve the construction process of the project.
 Contribute to the Corporate Lessons Learned Program to ensure that project
field experience is captured for use by future projects.
 Clearing & modifying part of engineering issues jointly with Field
Engineering department. Preparation of Hydro-static Test packages. Punch
list originating.
 Monitoring & inspecting construction operations to ensure compliance with
design documents.
 Maintains liaison with the Design department to schedule and co-ordinate
the release for construction of design documents in support of the
construction schedule.
 Evaluates change requests and interfaces with the contract administrator for
the initiation and development of contract modifications.
 Investigates & resolves engineering and technical related problems.
 Create Test Packages Data Base to control, manage and trace TP status,
also to report TP statistical information.
 Erection of static and rotary equipment’s like pressure vessels, heat
exchangers, scrapper traps, compressors, pumps.
 Conversant with piping specifications, ASME B31.1, B31.3, B31.4, ASME
Section lX, API 1110.
 Preparation of Method Statements as per Scope of Work.
Educational & Professional  Monitoring all work responsibilities and assuring high standards of quality.
qualifications
 B.E Mechanical Engineering, Magadha University, 2003.
 Diploma, Mechanical Engineering ‘98
 PMP- PMI Trained, Project Management Institute, USA.
 ASNT II, RT, UT, PT, MPT.
 AutoCAD.
 Computer proficiency, MS Words, Excel, PP.
 SAUDI ARAMCO Training in Industrial HSE.
 Seminar on Basic life support CPR training at Saudi Aramco HQ Saudi
Personal details: Arabia.

 Date of Birth: 24 July 1977


 Fathers name: Kasim Saheb
 Nationality: Indian
 Religion: Islam
 Languages: English, Hindi, Urdu, Kannada
 Marital status: Married.

 Passport no: U3972670


 Date of issue: 06/07/2020
 Expiry date: 05/07/2030
 Place of issue: Bangalore, India.

Thank you
Moinuddin Kasim Saheb.

You might also like