You are on page 1of 1

King Fahd University of Petroleum & Minerals

DEPARTMENT OF CIVIL AND ENVIRONMENT ENGINEERING

ASSESSMENT AND REPAIR OF REINFORCED CONCRETE STRUCTURES: PRINCIPLES AND APPLICATIONS


March 10 – 14, 2019 (Rajab 3 – 7, 1440H)
COURSE SCHEDULE

Time
8:15-9:15 am 9:20-10:20 am 10:40-11:40 am 1:00-2:00 pm 2:10-3:10 pm 3:30-4:30 pm
Day
Welcoming Characteristics of Corrosion
Sunday Cement Chemistry Deterioration of Types of Cracks in
Address Blended Cements with Mechanisms of
March 10th, and Cement Types Concrete: A Review
Emphasis on SF
Concrete
Reinforcement
(Course Coordinator
2019 (Al-Amoudi) (Maslehuddin) (Shamsad)
(Al-Amoudi) (Al-Amoudi)
1B 2B

& Chairman) 3B 5B

Inspection Assessment of RC Assessment of


Morning Coffee & Gathering (8:00 – 8:15)

Prayer Break (3:10 – 3:40)


Concrete Strength
9B

Monday Introduction to Corrosion Testing &


Methodology and Structures in Marine Concrete Using
March 11th,
P P
Concrete NDT and Durability Tests Monitoring
Assessment Guidelines Envs.: A Case Study Nuclear Technique
2019 (Qadeer) (Qadeer) (Qadeer)
(Shamsad) (Al-Rabiah) (Naqvi)
6B 7B

8B

Prayer + Lunch Break


Break for Refreshment
Lab Visit to
Assessment of Case Studies on Case Studies on Repair Introduction to
Research
12B 13B

Tuesday
14B

Concrete Using Cathodic Protection Repair using Cathodic using Cathodic Repair Methods and
March 12st,
P P

LASER Technique for Concrete


Protection: Part I Protection: Part II Strategies Institute
2019 (Kalimur-Rahman) (Maslehuddin &
(Gondal)
1B

10B

(Hussain) (Hussain) (Maslehuddin)


Al-Amoudi)
Case Studies on
Case Studies on
16B Assessment of
Wednesday Considerations for Strengthening/Repair Assessment and
Repair of Cracks Assessment and Repair Expansion Joints
March 13th, Corrosion Protection using CFRP
at Jubail Industrial City
Repair from Saudi
for Bridges
(Shamsad)
P P

2019 (Shamsad) (Kalimur-Rahman) ARAMCO


(Al-Mutlaq) (Al-Anazi)
15B

(Abu Aishah)
20B

Case Study on
Specialized Post-
17B

Thursday Damage and Repair


21B Damage of RC
tension Inspection
Durability of RC in the Field Visit
March 14th,
P P
due to Earthquakes Structures due to
and Evaluation
Saudi Building Code To be arranged with Saudi ARAMCO
2019 (Kalimur-Rahman) Fire (Al-Amoudi) and/or the Royal Commission
(Ellis)
19B

(Kalimur-Rahman)
18B

Coordinator: Prof. Omar S. Baghabra Al-Amoudi, Department of Civil & Environ. Engineering, KFUPM Box 5058, Dhahran 31261, Saudi Arabia
Tel: (013) 860-2745/4700; Mobile: 050-575-8489; Fax: (013) 860-2879; e-mail: amoudi@kfupm.edu.sa U

You might also like