2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 2.1.10 2.1.11 2.2.1 2.2.2 2.2.3 2.2.4 2.2.5 2.2.6 2.2.7 2.2.8 2.2.9 2.2.10
- PV LOCATION
KEYPLAN
SCALE: NTS
DATE
UNISTRUT CHANNEL
CONDUIT HOT DIP GALVANIZED
CONDUIT CONDUIT STEEL, LENGTH: 200mm
CLAMP ELBOW
CONDUIT
30 30 30 ALL DC CABLES SHOULD NOT TOUCH WeGen ENERGY PHILIPPINES
CONDUIT THE ROOF SURFACE. A UNISTRUT CHANNEL UNIT 2802D/2803A WEST TOWER, PSE CENTER
EXCHANGE RD., ORTIGAS CENTER
IF PV MODULE ORIENTATION DOES NOT ALLOW CLAMP STAND WILL BE INSTALLED EVERY 1.5m - 2m OF PASIG CITY, PHILIPPINES 1605
DIRECT CABLE CONNECTION TO THE NEXT PV THE CONDUIT RUN.
MODULE, AN MC4 EXTENSION CABLE SHALL BE
USED OR WHENEVER APPLICABLE. PROJECT:
11.97kWp PV PROJECT
LEGAZPI - ST. RAPHAEL THE ARCHANGEL
PARISH - CONVENT 1
TITLE: