Professional Documents
Culture Documents
sewerage plant
Gr 6 Gr 10
13- GPM REFER FIXTURE UNITS LOAD BASED ON TABLE- E 103.3 (3)
No 10
water pool water pool Gr 12
15- FINAL COLD AND HOT WATER PIPE DISTRIBUTION & CONNECTION
FORCED MAIN H.D.P.E Ø6" (U.G) SHALL BE CO-ORDINATED WITH THE FINAL KITCHEN AND LAUNDRY EQUIPMENT .
Gr 7
10 bar Gr 11
16- CWL
H.D.P.E Ø12" (U.G) H.D.P.E Ø6" (U.G)
No 21 No 21 water pumps
No 18 10 bar 10 bar No 11 17- HWL
18- TREATED WATER
U.P.V.C Ø10" (U.G) 19- RETURN TREATED WATER
6 bar 20-FORCED MAIN PIPE
Main gate
LEGEND :
CWL
washing salt
H.D.P.E Ø12" (U.G)
COLD WATER LINE
Gr 17
10 bar CWR COLD WATER RISER
HWL HOT WATER LINE
Gr 13
U.P.V.C Ø10" (U.G) Gr 18
HWR HOT WATER RISER
Magnetic Dry Machine
6 bar
Gr 22
WC WATER CLOSET
U.P.V.C Ø6" (U.G) PS PERINEAL SPRAY
shaking Tables
Gr 23
Ø DIAMETER
No 2 DN. DOWN
U.P.V.C Ø10" (U.G)
Gr 15
6 bar F/A FROM ABOVE
Gr 20
6 bar
Gr 25
Electric Room
H.M.C
No 15
Warehouse Gr 35
2 09/07/2019 ISSUED FOR TENDER M.A B.A
Gr 31
Gr 33 gas station
Gr 29 No 14Gr 37
No 16 No 6 No 19 GENERAL CONSULTANT
Main gate
DESIGN CONSULTANT
Gr 38
enaa
MEP CONSULTANT
ENGINEERING HOUSE Ltd.
Nasr City-Cairo-Egypt
trucks gate trucks gate Tel: (202) 24011.5609 ehl.egy.hr@gmail.com www.ehl-egy.com
Size
A0
Date Designed By
09/7/2019 Revision
Approved By Rev.
no. 1
date.09/7/2019
Scale Drawing No. Project No.
1:600 ME-SL-TW-104 1 / 9 9 0