GENERAL NOTES :

1. ALL WORKS HEREUNDER SHALL CONFORM WITH THE RULES AND REGULATIONS OF THE LATEST EDITION OF THE PHILIPPINE FD Floor Drain VTR Vent Thru Roof
CWL PIPE
PLUMBING CODE. ALL NATIONAL AND MUNICIPAL LAWS PERTINENT TO THE PRACTICE OF SANITARY ENGINEERING AND THE REQUIREMENT OF
DRAIN PIPE - CATCH BASIN LINE WC Water Closet VTW Vent Thru Wall
THE LOCAL UTILITIES COMPANY.
2. ALL WATER AND WASTE PIPE SHALL BE POLYVINYL CHLORIDE PIPES, SCH. 40 SIZES AS INDICATED ON THE PLANS AND SPECIFICATIONS. SOIL LINE
LAV Lavatory PVC Polyvinyl Chloride
3. NOMINAL SIZE OF OUTLET PIPE FROM SEPTIC VAULT TO MAIN STREET SEWER LINE SHALL NOT BE LESS THAN 100mmØ AND SHALL BE
PROVIDED SHOWER HEAD
KS Kitchens Sink SH Shower Head
4. WITH 2% ADEQUATE NOMINAL SLOPE. FAUCET/ HOSE BIBB

5. ALL MATERIALS / EQUIPMENT TO BE INSTALLED SHALL BE NEW AND FREE FROM ANY DEFECT AND APPROVED AS TO LOCATION AND CLEAN OUT W/ PLUG/CAPPED TD Tub Drain SD Shower Drain
PURPOSE. FLOOR DRAIN/SHOWER DRAIN
6. ALL WORKS HEREUNDER SHALL BE UNDER THE DIRECT SUPERVISION OF A DULY LICENSED SANITARY ENGINEER AND / OR MASTER SV Septic Vault F/HB Faucet/ Hose Bibb
M WATER METER
PLUMBER. CHECK VALVE MH Man Hole WM Water Meter
7. TOP OF CATCH BASIN COVER SHALL BE AT GRADE LEVEL. GATE VALVE
8. MINIMUM SLOPE OF SEWER AND DRAIN PIPES SHALL BE 2.00 %.
CB CATCH BASIN HH Hand Hole GV Gate Valve
9. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPES
SHOWER AREA
AND STRUCTURES AS VERIFIED BY THE CONTRACTOR. SV Septic Vault SSP Soil Stacl Pipe
LAVATORY
10. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATE THE WORK WITH THE SEWER LINE EFFLUENT
WATER CLOSET
DISPOSAL POINT AND WATERLINE SERVICE CONNECTING POINT. CO Clean Out SPD Stack Pipe Drain
11. CLEAN OUT (CO) LOCATED IN T&B SHALL NOT BE EXPOSED. MUST BE EMBEDDED IN TILES. KITHCEN SINK

PIPELINE IN ANGLE CB Catch Basin CWLR CWL Riser


(ISOMETRIC LEGEND)

TO SUPPLY REMOVABLE BRASS

WESTERN WATER FINISHED WALL


2Omm GATE VALVE/ STRAINER
100mm THK CONC. SLAB W/ 10mm Ø REINFORCED
WATER METER
COLD WATER SUPPLY (SEE
CLOSET LAVATORY SOLID BRASS BARS @ 0.20m O.C. BOTHWAYS

2000 1000
PLANS FOR CONTINUATION ESCUTCHEON PLATES PLAN
AND PIPE SIZE) REMOVABLE BRASS

1.50
PLAN FROM MAIN WATERLINE
FIN. FLR. LINE
SLOPE
STRAINER
SLOPE
ISOLATING
VALVE
CWS
VENT PIPE (THRU ROOF)
0.90
VARIES

INSIDE SCREW
VARIES

METALLIC
PLAN P-TRAP
ADJUSTABLE BRASS OUTLET
CLEANOUT
50MM Ø
PIPE INLET DRAINAGE
VARIES WATER
SUPPLY FINISHED FLOOR LINE LINE C.F.

1500.00
VARIES FINISH FLOOR LEVEL
CONCRETE WALL PVC PIPE
CMU WALL
WESTERN WATER P-TRAP
VENT PIPE (SEE PLANS
FOR CONT. & PIPE SIZE
CLOSET
LAV. MOUNTING DETAIL manhole manhole 100mmØ
ELEVATION/SECTION SECTION PVC
VARIES

PIPE
COLD WATER SUPPLY (SEE
WATER METER DETAIL
VARIES

PLANS FOR CONTINUATION OUTLET


AND PIPE SIZE) 0.05 0.40 0.05
FFL
STRAINER 0.30
DS DOWNSPOUT (DS)
FIN. FLOOR WATER PROOFING
LEVEL FLASHED INTO
PIPE SLEEVE 1" x 1/8" THK. 1" x 1/8" THK.

0.05
CLAMPING COLLARS FLAT BAR (AS
SLAB FLAT BAR (AS
50 VENT SPACED)
SPACED)
SEPTIC VAULT COVER PLAN
BODY
10 MM. Ø REBARS

0.40
0.50

0.30
SEE PLANS

3300
OUTLET PIPE
0.40 (MIN.)

FOR CONT. 100 50mmØ PVC PTRAP 100 MM. THK. INLET PIPE
SECTION CLEAN OUT
CHB
100 MM. THK.
OUTLET PIPE 0.05 CHB
SHOWER DRAIN DETAIL INLET PIPE PLAN MANHOLE

WATER CLOSET DETAIL

.05
SECTION
3-10 MM. Ø REBARS
ON BOTHWAYS
CATCH BASIN DETAIL
INLET

150mm THICK CHB PL. FIN. VERT. BARS


10mmØ @ 0.80m O.C. HORIZONTAL BARS
EVERY 3 CHB LAYER
14 mm Ø PLAIN ROUND 14 mm Ø PLAIN ROUND

1.00
BAR LIFTING HANDLE, BAR LIFTING HANDLE,
500.00 500.00
500.00 HOOKED & EMBEDED 500.00 HOOKED & EMBEDED

1.20
CONC, COVER W/ 4 - 10 TO THE CONCRETE TO THE CONCRETE
100.00 100.00 mm Ø DSB BARS SP O.C. 100.00 100.00
300.00 300.00 100.00 100.00 100.00 100.00
E. W. 14 mm Ø PLAIN 50.00 400.00 50.00 50.00 400.00 50.00
6 " Ø PERPORATED PIPE ROUND BAR LIFTING CONCRETE COVER CONCRETE COVER
CONNECTING CATHC HANDLE HOOKED & 4.5 mm X 40 mm FLAT REINF. 1/ 4 - 10 mm Ø REINF. 1/ 4 - 10 mm Ø
BASIN EMBEDED TO 6 " Ø PERPORATED PIPE BAR STEEL GRATING DSB BARS SP O.C. E.W. DSB BARS SP O.C. E.W.
CONCRETE CONNECTING CATHC CATCH BASIN COVER 2" Ø PVC DOWNSPOUT
BASIN
SLUDGES
50.00

50.00
100.00

100.00

2" Ø PVC DOWNSPOUT


250.00

250.00

SLUDGES
500.00

400.00

500.00
300.00

500.00

500.00
400.00

300.00

.05
250.00

250.00
100.00

100.00

4 " CHB PLASTERED 4 " CHB PLASTERED


6 " Ø PERPORATED PIPE

0.2
50.00

50.00

FINISH FINISH
6 " Ø PERPORATED PIPE CONNECTING CATHC
CONNECTING CATHC BASIN
BASIN
100mm THICK CONCRETE SLAB
2 " Ø PVC DOWNSPOUT 2 " Ø PVC DOWNSPOUT 3 - 10 mm Ø DSB 3 - 10 mm Ø DSB
WITH 10mmØ REINFORCED BARS
0.2 0.2 0.2

6 " Ø PERPORATED PIPE 6 " Ø PERPORATED PIPE FOOTING BARS. SP @ FOOTING BARS. SP @
CONNECTING CATHC
BASIN
CONNECTING CATHC 300mm O.C. E.W. IN
HOOK BEND
300mm O.C. E.W. IN
HOOK BEND
@ .20m O.C.
250.00 250.00 BASIN 250.00 250.00

500.00 500.00
SEPTIC VAULT SECTION
SEALED CONC. COVER PLAN GRATING COVER PLAN

OTHER DETAILS NTS SEPTIC TANK DETAIL PLAN NTS


OWNER: PROJECT TITLE: PAGE CONTENT: DRAWING PAGE NO:
GENERAL NOTES

REG NO:
PTR:
TIN:
M A S T E R P L U M B E R
VALIDITY:
TANYA CORAZON TORRES
ROBERT TORREST JR.
PROPOSED TWO-STOREY RESIDENCE
PUROK 5, BARANGAY BORABOD, DAET, CAMARINES NORTE
LEGENDS
OTHER DETAILS
SEPTIC TANK DETAIL P1

You might also like