You are on page 1of 2

AHP VACUUM PUMP HOUSE FOR UNIT 1

1. ALL DIMENSIONS ARE IN MILLIMETERS.


Please refer comments "09" "10" "11" "12" "13" "14" "15" PIPE/CABLE RACK
2. FOR ADDITIONAL INFORMATION AND DIMENSIONS, SEE REFERENCE DRAWINGS LISTED BELOW.
marked on power block 3. ALL DUCT DIMENSIONS ARE TO THE INSIDE OF DUCT PLATES.
48°
GA regarding AHP pump 4. ALL FURNACE/BACKPASS OPENINGS ARE IN BOTH SIDES OF FURNACE/BACKPASS,
PN

houses and electrical UNLESS NOTED.

PIPE/CABLE RACK
building. It is again ESP-"A" 5. DIMENSIONS SHOWN ON ALL GENERAL ARRANGEMENT DRAWINGS INDICATE
COLD POSITIONS.
requested to show clear 6. FOLLOWING LEVELS ARE APPLICABLE TO PLANT
available space between RL+199.0 = EL.(-)0.5 = FGL
RL+199.3 = EL.(-)0.2 = TOP IN BOILER/ESP AREA
ESP edge and air receiver RL+199.5 = EL.(±)0.0 = FFL OF STG BUILDING, MILL BUNKER BUILDING, CHIMNEY.
considering piping, air MILL-G MILL-E MILL-F MILL-H 7. ALL EQUIPMENTS / FACILITIES, THEIR LOCATIONS, SIZES & DIMENSIONS ARE INDICATIVE
MILL REJECT BOILER JUNCTION
receiver withdrawal/ SILO BLOW DOWN
SUMP TOWER -10 ESP AND WILL BE FINALIZED IN DETAIL ENGINEERING PROGRESSIVELY.
CONTROL BUILDING
maintenance and FOR UNIT 1 8. SCOPE DEMARCATION FOR INTERNAL PURPOSE ONLY.

maintenance requirement UP
ESP-"B"
UP
ID FAN-A
of ESP hoppers.
"02" MRS MRS MRS MRS

PASSENGER
ELEVATOR

1. BOILER GENERAL ARG'T, SECT. BOILER SIDE ELEV. VIEW "01-01" -------- DP16004-UC08-10ZEN-320002
ECW
PUMP CONDENSATE RECOVERY FD FAN-A
DRAIN TANK 2. BOILER GENERAL ARG'T, MILL SIDE ELEV. VIEW "02-02" -------- DP16004-UC08-10ZEN-320003
G.A.P.H
"A" 3. BOILER GENERAL ARG'T, BOILER FRONT ELEVATION VIEW "09-09" -------- DP16004-UC08-10ZEN-320004
DRAIN PUMP
S.C.R-"A" BOILER WORK
ESP-"C"
4. BOILER GENERAL ARG'T, EL.00 PLAN VIEW "03-03" -------- DP16004-UC08-10ZEN-320005
ECW

BOTTOM ASH HOPPER


H/E
PA FAN-A 5. BOILER GENERAL ARG'T, PLAN VIEW "04-04" -------- DP16004-UC08-10ZEN-320006
AIR REC. TANK
FOR GAS A/H-A
6. BOILER GENERAL ARG'T, PLAN VIEW "05-05"

FURNACE
-------- DP16004-UC08-10ZEN-320007
BOILER "01" OVER FLOW TANK HP PUMP
OVER
FLOW
FOR FGD WORK
UNIT #1 PUMP
GAS A/H 7. BOILER GENERAL ARG'T, PLAN VIEW "06-06" -------- DP16004-UC08-10ZEN-320008
S.C.A.H DRAIN
AIR REC. TANK PUMP & TANK
FOR GAS A/H-B PA FAN-B 8. BOILER GENERAL ARG'T, PLAN VIEW "07-07" -------- DP16004-UC08-10ZEN-320009

SEAL AIR FAN


AIR REC. 9. BOILER GENERAL ARG'T, PLAN VIEW "08-08" -------- DP16004-UC08-10ZEN-320010
FOR MRS ESP-"D"
S.C.R-"B"
G.A.P.H 10. BOILER GENERAL ARG'T, BOILER REAR ELEV. VIEW "10-10" -------- DP16004-UC08-10ZEN-320011
BOILER WORK
"B"
11. BOILER GENERAL ARG'T, BOILER REAR ELEV. VIEW "11-11" -------- DP16004-UC08-10ZEN-320012
FD FAN-B
12. BOILER GENERAL ARG'T, GAS A/H. ELEV. VIEW "12-12", "13-13" -------- DP16004-UC08-10ZEN-320013
DRAIN OIL TANK
& PUMPS
GOODS 13. BOILER GENERAL ARG'T, F.D/P.A FAN REAR ELEV. VIEW "14-14", "15-15" -------- DP16004-UC08-10ZEN-320014
ELEVATOR

ARP. 14. BOILER GENERAL ARG'T, BACKEND SIDE ELEV. VIEW "16-16" -------- DP16004-UC08-10ZEN-320015
MRS MRS MRS MRS ABSORBER
ID FAN-B HOUSE
& GGH STRUCTURE
JUNCTION ESP-"E"
15. BOILER GENERAL ARG'T, BACKEND PLAN ELEV. VIEW "17-17" -------- DP16004-UC08-10ZEN-320016
TOWER -11
16. BOILER GENERAL ARG'T, BACKEND I.D FAN REAR ELEV. VIEW "18-18" -------- DP16004-UC08-10ZEN-320017
MILL REJECT
SILO UP

17. ELEC_CABLE RACEWAY DESIGN_MAIN CABLE ROUTE PLAN DETAIL -------- DP16004-YE00-90UZT-140601
MILL-C MILL-A MILL-B MILL-D UP

ESP BUFFER
HOPPER TOWER

ESP-"F"

POWER PIPE/CABLE RACK

HOUSE EMERGENCY
SLURRY
BUILDING FIRE WATER TANK
BOOSTER PUMP
HOUSE

PIPE/CABLE RACK
CENTRAL CONTROL BUILDING STACK
AHP COMPRESSOR &
VACUUM PUMP ELECTRICAL ROOM

AIR COMPRESSOR &


MILL REJECT COMPRESSOR
BUILDING AHP VACUUM PUMP HOUSE FOR UNIT 2

PROCESS
WATER
PIPE/CABLE RACK TANK

PIPE/CABLE RACK

ESP-"A"
PIPE/CABLE RACK

MILL-G MILL-E MILL-F MILL-H JUNCTION


MILL REJECT BOILER
SILO BLOW DOWN
SUMP
TOWER -12

UP
ESP-"B"
ID FAN-A
ABSORBER
UP

ARP.
"02" MRS MRS MRS MRS
& GGH STRUCTURE HOUSE
PASSENGER
ELEVATOR

ECW
PUMP CONDENSATE RECOVERY FD FAN-A
DRAIN TANK

G.A.P.H
"A" S.C.R-"A" BOILER WORK
DRAIN PUMP
ESP-"C"

ECW
BOTTOM ASH HOPPER

H/E
PA FAN-A
AIR REC. TANK
FOR GAS A/H-A
FURNACE

BOILER "01" OVER FLOW TANK HP PUMP


OVER FOR FGD WORK
UNIT #2 FLOW
PUMP
GAS A/H

S.C.A.H DRAIN
AIR REC. TANK PUMP & TANK
FOR GAS A/H-B PA FAN-B

SEAL AIR FAN


AIR REC.
FOR MRS ESP-"D"
S.C.R-"B"
G.A.P.H
BOILER WORK
"B"
Digitally signed
Signature Not UTTAR PRADESH RAJYA VIDYUT
FD FAN-B by MVerified
S RAMESH
Date: 2018.12.04 UTPADAN NIGAM LIMITED
DRAIN OIL TANK 15:55:33 IST
GOODS
& PUMPS
Reason: CAT II (A UP GOVERNMENT UNDERTAKING)
ELEVATOR Location:
MRS MRS MRS MRS
NTPCEOC
JUNCTION ESP-"E"
ID FAN-B DEVELOPMENT CONSULTANTS
TOWER -13
ESP PRIVATE LIMITED, KOLKATA
CONTROL BUILDING
FOR UNIT 2
MILL REJECT
DOOSAN POWER SYSTEMS
UP

SILO
UP

MILL-C MILL-A MILL-B MILL-D


ESP BUFFER
HOPPER TOWER
INDIA PVT. LTD

ESP-"F"

OBRA'C' 2x660 MW THERMAL POWER


EXTENSION PROJECT
PIPE/CABLE RACK

POWER
HOUSE
BUILDING

KEY PLAN
NTPC COMMENTS RESPONSE SHEET
Project: OBRA C 2 x 660 MW THERMAL POWER EXTENSION PROJECT

Contractor DOOSAN POWER SYSTEMS INDIA, Gurgaon

Owner UTTAR PRADESH RAJYA VIDYUT UTPADAN NIGAM LIMITED, Lucknow

Owner's Consultant DEVELOPMENT CONSULTANTS PRIVATE LIMITED, Kolkata

Review Engineering Consultant NATIONAL THERMAL POWER CORPORATION, Noida

DPSI Correspondence No. DP16004‐UC08‐10ZEN‐320001 Date:


NTPC Doc No. 9878‐UC08‐10ZEN‐320001 Date: 2018‐08‐06

Document / Drawing Number Document / Drawing Title Revision Assigned Approval Category*


BOILER GENERAL ARRANGEMENT
DP16004‐UC08‐10ZEN‐320001 05 I
KEY‐PLAN

No. NTPC Comment DPSI Response NTPC Resolution


Self Revision:
1 No comment
ESP Inlet cross over duct size and layout is revised because it is more 
effective in reducing ash accumulation than previous design.

* NTPC Approval Categories:
1 = Approved
2 = Approved, subject to incorporation of comments /modifications as noted. Resubmit revised drawing / documents after incorporation for final approval.
3 = Not Approved. Resubmit revised drawing/ documents after incorporation of comments for approval
4 = For information and records
4R = Additional information / detail required. Revised drawings to be submitted (in  case of drawings required to be submitted to NTPC for information only).

You might also like