NVP-290.7 NVP-290.11
Specifications Unit
Effective pile width
290 290 mm
Depth of section 240 240 mm
Thickness 7 11 mm
Density
1450-1550 1450-1550 kg/m3
Tensile strength 40 40 Mpa
Tensile moduls of elesticity 2600 2600 MPa
Moduls In bending 2600 2600 MPa
Section moduls 1229 1951 cm3/m
Moment of interia 15652 24847 cm4/m
Allowable moment(FOS=3) 16,39 26,01 kNm/m
Ultimate moment 49,17 78,04 kNm/m
The technical specification
Method of Sheet Piling
Properties Unit
research P - 300/115/5,5
The width of the cross-section - 300 mm
The height of the cross-section - 115 mm
The wall thickness - 5,5 mm
The transverse area of the cross-section - 2992 mm2
The density ISO 1182 1450 - 1550 kg/m3
The endurance on the extended
ISO 527 40 MPa
material
The module of the elasticity at
ISO 527 2000 MPa
the extension
The module of the elasticity at
ISO 178 2600 MPa
the inflexion
The module of the elasticity at the inflexion
ISO 178 865 MPa
- long-term
The limit of the plasticity at the
ISO 604 55 MPa
compression
The coefficient of the cross-section - 320 cm3/m
The moment of inertia - 1800 cm4/m
Allowable moment - 4,27 kNm/m
The maximum admissible moment - 12,80 kNm/m
Water Jetting
is a method of installation of sheet piling in compactly coherent or strongly compact grounds.
In certain circumstances, the power of vibratory hammers might be insufficient
to obtain of the required depression.
This can be due the obstacles occurring in the ground or the hardpan.
The technique of jetting aims generating pressure directly under the end-foot of sheet piling,
which will loosen and will remove the ground under the sheet piling.
To mollifiable the ground one uses air or water stream from low - or with high-pressure water pumps.
Embedding
is a method used at the construction of the paleal wall of not large depression,
often in stony grounds, when is not possible to use
both techniques of thrusting as and jetting.
Sheet pilings are assembled in the previously dug ditch
which is then filled on both sides of the wall with accordant to the project sub-crust.
We recommend mechanical or chemical hardening of used sub-crust.