Output in KW
PVG Valve Training
Manufacturing Locations
PVG 120
The family of PVG valves
PVG 32
PVE Ser. 4
PVG 100
Cartridge valves
Market
Quality demand
processes
(cost driven)
PVG 32
(Market driven)
PVG 120
OEM driven
PVG 60 Low
(Technology driven) Delivered
1975 1980 1988 1998 2005 2008 Costs
2003
PVG Valve Training
Application Types
Agriculture
Specialities 10%
20%
Construction
13%
Road Building
1%
Material
Handling
26% Distribution
30%
PVG Valve Training
• Closed Centered
• Open Centered
• Open Loop
• Closed Loop
• Proportional
• Hysteresis
• Repeatability
• Compensated
• Frequency Response
• Load Independent Flow
PVG Valve Training
PVG Features
• Developed by Danfoss
• Upgradeable / Modular / Serviceable / Compact Design
• Globally Represented and Recognized
• Over 100 Million Possible Option Combinations
• Increased Productivity / Low Spool Flow Forces
• Energy Efficient
• Multiple Functionality and Performance Options
• Integrated Safety
• High Reliability
• High Quality
• Over 3 million Sections Sold Since 1988.
PVG Valve Training
PVG Proportional Valves
Modules stack together to form a valve
assembly
Interchangeable Operators
High
Pressure
Low
Pressure a
Load pressure
independent
Input ? lbs.
Signal
100%
PVG Valve Training
PVG 32 Modular Concept
PVMD/F/H/R
PVS
App. 30 variants
PVBS
App. 600 variants
PVE
App. 110 variants PVM
App. 22 variants
PVP
App. 135 variants
PVB
App. 75 variants
PVG Valve Training
•www.sauer-danfoss.com - Literature
PVG Valve Training
Technical Characteristics PVG 32
Pressure:
P-port: 350 Bar
A/B port: 380 Bar
T port: 25/40 Bar
Flow:
P-port 150 l/min (230 l/min – CC, Mid-Inlet)
A/B Port 130 l/min
T P
PVG 32
PVG 32 function
M
LS A
B A
LS
T T
LS B P LS A
B A
LS
T T B
P
4 section PVG 32 Schematic with LS pump
A B A B A B A B
LS
T P LS LS LS LS
A B A B
PVG Valve Training
Pressure:
P-port: 350 Bar
A/B port: 380 Bar
T port: 25/40 Bar
Flow:
P-port 240 /300 l/min
A/B Port 180 l/min
Return Flow 320 l/min
PVG Valve Training
PVG 100
PVG Valve Training
3 section PVG 100 Schematic with LS pump
Pressure:
P-port: 400 Bar
A/B port: 420 Bar
T port: 25/40 Bar
Flow:
P-port 240 / 300 l/min
A/B Port 180 / 240 l/min
PVG Valve Training
X-X PVG 120
p ma
T T
P
X
X
LS
P A
A B
T T
P
LS
A B
P B
T T
P
PVG Valve Training
PVGI - PVG 32/PVG120 combination
Special spec sheet.
PVG 32
PVGI
PVG120
PVG 32
PVE Module
Information
Module
Information
Assembly
Information
Assembly Identification
Assigned Assembly
/Group Number
Relief Pressure
Build Center Code Setting (bar)
Bar code + Date Code
/ Build and Test Date
47
Module Identification
157B5110
157B6200 All PVB and PVP
4901B022550
4901B032550 modules identified with
Part Number and Date
Code engraved on module
“A” port side.
Module Identification
PVE Module
Voltage Rating
12VDC
157B4911 Part Number
491E3664
Date Code
PVBS Identification
Relief grooves
PVLP Identification
PVG No.
Specification
Customer Application
p= 3500 psi
Motor a 157B 3171 1 157B 6500 157B 7101 13 157B 4116 c
b 157B LSa psi LSb psi 157B b
Cylinder a 157B 3171 2 157B 6633 157B 7022 13 157B 4016 c
b 157B 2210 LSa 2700 psi LSb 1800 psi 157B 2140 b
a 157B 3 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 4 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 5 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 6 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 7 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 8 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 9 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 10 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
For Sauer Danfoss Use Only 11 157B 2020
12 157B 8002
Filled in by Date
T P T P
Pp Pp
M M
M M
LS LS
LS LS
P P
T T
Open Center vs. Closed Center Inlet
To be change to 3D
PVG Open vs Closed center
Fixed displacement pump Variable displacement pump
relief valve pressure compensated
Q Q
Loss
Leakage compensation
PVG 32 PVG 32
open center Loss closed center
Leakage compensation
Assembled in “standard”
inlet location.
P/N in blank 0. T
LS
If specify optional PVLP P
the assembly.
LS LS
the assembly.
LS LS
the assembly.
LS LS
•Mixed up (P&T)
•T line is not connected
•T line is disconnected during
operation
Technical Data:
•Max. Tank pressure = 50 bar
•Max. pump pressure 210 bar
•Max pump flow 120 l/min
OSP
T P
OC PVP 32 EF Flow
CF
P
PVSP Concept 2
OSP
T P
CC PVPV EF Flow
CF
P
PVSP Concept 3
T P
EF Flow CF Flow
CC PVPV
CF flow for Joystick Steering etc.
CF
P
PVSP priority module for steering or
neighbour spool
P CF Compensator spool
Dynamic orifice
or plugged for static
version
PP orifice
LS - orifice
Priority spool
PVSP priority module with Brake release
P CF
T PVG LS gallery
Pbr (3x)
Low pressure start valve
T
Brake charge valve
PVG Valve Training
D
PVSR
LS
T P T
PVG Valve Training
PVBM
PVG Valve Training
PVSK
PVG Valve Training
PVBZ
PVG Valve Training
PVB
PVB, Basic Module
PVBS
Basic Spool-Assembly
Spool assembly consists of catcher, stops (2), spring, spool and plug.
ID number of “spool assembly” is stamped on catcher. Numbers on the spool
end are date code and spool part number. Spools are only sold as spool
assemblies.
Flow Rates for Flow-Control spools in
PVB with pressure-compensator.
PVG 32 pressure-compensated flow
Q A/B
P A l/min P B
E 1 100 1 E
90
8 80 8
1 70
D 1
D
60
8 8
50
C 1 1
40 C
8 8
B 30
B
20
A 10 A
AA AA
0 a PVM
7 6 5 4 3 2 1 1 2 3 4 5 6 7
p PVH
15 13 11 9 7 5 7 9 11 13 15 bar U
S
PVE
0.25 0.3 0.35 0.4 0.45 0.5 0.55 0.6 0.65 0.7 0.75 UDC
6 standard flow sizes. Flow vs. Spool movement in mm, DC signal to proportional PVE.
PVB with LSa/b Relief Valves AND
Spool for use with LSa/b shuttle.
PVB without LSA/B shuttlevalve PVB with LSA/B shuttlevalve
checkvalve
LSA/B shuttlevalve
Mechanical
latch-in float
option B or A
Mechanical
detent spool.
Spool for Electric Float position
T T T
T
P P
LS
Pressure Control (PC) Spools
T T T T
P P
Flow control: PLS = PA/B Pressure control: PLS = PA/B (PP -> LS + T)
Flow Control vs. Pressure Control
Pressure control, LS psi gets larger
Flow control, LS psi=workport psi
as spool moves farther from Neut.
Mainspool Mainspool
P P
LS LS
T T
PC Spool Characteristic
Pressure control
2
T T 2 Low QLS -> T : High P
P
Pp
bar
300
250 2
200
150
1 100
T T 50 1
PVBS
0
0 1 2 3 4 5 6 7 mm
Port Port
200 bar 200 bar
Ø1,2 Ø1,5
PVS Endplate,
aluminun with and
without LX port
< 260 Bar PVSI Endplate, cast
iron with and
without LX port
< 400 Bar
PVG 32 and PVG 120 with one LS pump via the LS/LX
connection feature
•With/without base
•With/without arm
•With/without button
12.5 +1
-
PVM Mechanical Handle
•With/without base
•With/without arm
•With/without button
PVMF, PVMR
Detent and float
option
PVLA, PVLP
PVLP and PVLA, Shock Valve / Anti-Cav
PVE’s
Electric Proportional Valves
Spool Valves 2006
…..The History
The PVG valve was the first
proportional valve on the market for
the Mobile Hydraulics Industry with
electrical closed loop (feed back)
control.
Spool Valves 2006
……..PVG History-Today-Future
BAT
Latest in PVE’s
• PVHC PWM controlled (open loop, no Fault Monitoring)
• PVEP PWM controlled 100-1000 Hz, 2 input signals 10-
80% DC Fault Monitoring and spool position feedback
• 0-10V Vs control signal (2.5V(A)–5V(neutral)–7.5V(B))
PVE applications
Main features:
Feedback philosophy
Joystick
Internal Closed loop control compensations
•Immune to Flow forces •Immune to pilot pressure variation
•Immune to Viscosity •Linear control
•Immune to Temperature variations •No adjustments, no temp. drift
•Immune to Supply voltage variation •Fault monitoring possible
Control Control Control
Transducer
Spool Position feedback with
contact- less, inductive LVDT
transducer.
Spool Valves 2006
PVE technology
Integrated electronics
Closed loop control of the main spool
~60mm/s
Demand signal
Solenoid valves
Feedback transducer
Spool Valves 2006
PVG valve actuation ---
The PVE principle … and function
PVE Series 4
Vs INP.
0.6[0.024] 0.6[0.024]
PVE Series 4
Vs INP.
TRD PWM
…used in:
• PVEO / PVEO-R
• PVEM
• PVEH / PVEH-DI
• PVES
1.0[0.039]
PVE Series 4
Hydraulic performance
+6
+2
0
20% 2% 4%
-2
-4
-6
-8
Fault monitoring description
Transducer If one of the wires to the LVDT sensor, or inside the sensor,
is broken or shorted, the system will switch ínto an error
supervision
state.
85 % 85 % 85 %
75 % 75 %
Spool position
Working > 15% ==> ERROR
Input signal
range
50 % 50 % 50 % 50 % Deadband+
_ 7%
Working
range
Input signal
> 15% ==> ERROR
Spool position
25 % 25 %
15 % 15 % 15 %
Link to PWM control signal.
0% 0% 0% 0%
PVE Series 4
Fault mon. Error signal out Fault mon. Error signal out
Transducer Transducer
logic - 750 ms delay (PVEA) logic - 750 ms delay (PVEA)
500 ms delay (PVEH) 250 ms delay (PVEH)
- Memory - No memory
Constant Green = OK
Modular concept
Electronic modules
ON/OFF
Activation
Standard PVEO PVEO PVEO4
With ramp PVEO-R PVEO-R PVEO-R4
Proportional Q1
Activation
Medium 2004 PVEA4 /
performance
PVEM PVEK / PVEK-DI PVEM4
PVEA-DI4
High
performance
PVEH PVEB / PVEB-DI PVEH4 / PVEH-DI4
Super
performance
PVES PVES4
PVE Series 4
PCB covered
with PUR-gel
Single wires
LVDT coil
PUR
Excellent binding
between PUR and PUR-gel
PUR-gel prevents
micro cracks Minimal contact
areas between Insert molded
housing and PCB contact pins
PVE Series 4
…PVE performance
( ) Objective
PVE Series 4
Performance: PVEA vs. PVEM at high viscosity
8
7 Test conditions
6
• Tellus 32
B-port 5
• Approx. -18ºC
4
(~ 2500 cSt)
3
1 PVEA
0 PVEK series 3
-1 PVEM series 2
-2
-3
-4
A-port
-5
-6
-7
-8
Time (s)
PVE Series 4
DIR_A
DIR_B
x [mm]
-a2 -a1 a1 a2
0
A-port B-port
Direction signals “a1”, “a2” -0,8mm ±0,4mm 0,8mm ±0,4mm
Max. load of “Dir_A”, “Dir_B” 20 - 50mA
Voltage “High” value, load = 20mA Minimum: Vbat+ – 1,5V
Voltage “High” value, load = 50mA Minimum: Vbat+ – 2,0V
Voltage “Low” value Maximum: 0,2V
PVE Series 4
Environmental objective
Improved protection:
• against moisture
• operation at higher and lower
temperature
• EMC protection
PVE Series 4
Min. 25 cycles
Salt water
at 25 deg.C
PVE Series 4
Temperature
Objective:
• To test the PVE series 4 at 110 deg.C
PVE series 2 and 3: 90 deg.C
Prof 1 CIP
(100,0) D
PVE signal
C
PVG CIP
B
(0,100)
A
Joystick movement
PVE Series 4
+
VBAT2
Digital control
R3 R4
8 - 36 V M1 MV1
VI VS
MV2
with PVED
M2
Solenoid
- Input Select Modulator M3
Driver
MV3
SW mode PWM
M4 MV4
Direction DIR_A
Indicator
ERROR D IR_B
LVDT Test Driver
AD PWM Driver
ASIC LVD TP
LVDT LVD TIN
VTR A
Controller LVD TN
CAN
CAN
tranciver GN D
uP: C164CI
AD
DI
DI
DI/A D
DI/A D
DI/A D
DI/ A D
DI/A D
CA
NS
AE- PVED philosophy (short term)
J19
39 •Distributed intelligence
ISO
BU Reduce load on central controllers
S
•Iso 11783 compliant
•Software functionality
eg flowsharing, active damping, hitch
PVB PVED-CL
Hitch system- Based on PVED and PVBZ
LS A/B
Standard hitch slice port
Position
CAN
Force
CAN
PVED-HC
PVED
PVBZ-H
Radar Speed
PVE Series 4
ISO bus
Angle P Angle P
Force Angle Speed
CAN
CAN
CAN CAN CAN PVED-CC Armrest Dashboard Dashboard
CAN PVED-CC controller Controller Controller
PVED-CL
PVED-HC PVED-HC PVED-CC
PVED-CC
Radar Speed
PVE Series 4
Hitch
CAN Gateway
w/ Display
RS232 EHPS
Labtop CAN
Datalogger
SX
Controllers
Specification
Customer Application
p= 3500 psi
Motor a 157B 3171 1 157B 6500 157B 7101 13 157B 4116 c
b 157B LSa psi LSb psi 157B b
Cylinder a 157B 3171 2 157B 6633 157B 7022 13 157B 4016 c
b 157B 2210 LSa 2700 psi LSb 1800 psi 157B 2140 b
a 157B 3 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 4 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 5 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 6 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 7 157B 157B 13 157B c
b 157B LSa psi LSb psi 157B b
a 157B 8 157B 157B 13 157B c
PVG32 Lab:
Gracias Спасибо
Russian
谢谢
Chineese
Grazie
Merci
Tak
감사합니다
Korean
Dziekufe ありがとうございました
Japaneese
Polish
Danke schön
THANK YOU
Dakujem
Slovakien