Time Work
Practice Sheet :- 01

By :- UDIT SAINI
Unacademy Plus CAT Content By UDIT SAINI
1) A can do a piece of work in 20 days and B can do it in 15 days. How long will they take if
both work together?
𝟔 𝟒
(a) 8 days (b) 8 days
𝟕 𝟕
𝟑
(c) 9 days (d) none of these
𝟕

2) Bhanu and Tyagi can complete a piece of work in 32 days and 48 days respectively. If
they work on alternate days, with Tyagi starting the work, in how many days will the
work be completed?

3) A alone can complete the work in 24 days while B alone can do the same in 30 days. A
started the work and B joined him after some time. If the work is completed in 16 days,
after how many days B joined him?

Use code “UDITSN5” to get maximum Discount on Plus/Iconic Subscriptions


Unacademy Plus CAT Content By UDIT SAINI
4) Ram can complete 1/3rd of a work in 10 days, Shyam can complete 2/5 of the same work
in 20 days and Chintu can complete 1/4 of the same work in 5 days. If they work together.
Then how much percent work will complete in 3 days.

5) If A,B and C together can finish a piece of work in 4 Days , A alone in 12 days and B in 18
Days, then C alone can do it in

6) A and B can finish a piece of work in 30 days, B and C in 40 days while C and A in 60
days. A, B, C together can do the work in ______ days.

7) A,B and C can complete a piece of work in 30,40 and 60 days respectively. They work on
a rotation basis with A working on the first day, B on the second day, C on the third day,
then again A on the forth day and so on. In how many days the work will be completed.

Use code “UDITSN5” to get maximum Discount on Plus/Iconic Subscriptions


Unacademy Plus CAT Content By UDIT SAINI
8) P can complete the 40% of the work in 20 days and Q can complete 1/3rd of the same
work in 10 days. In how many days they will take to complete the work, if they work
together?

9) P, Q and R can complete a certain work in 8, 16, and 12 days respectively. If they work for
one day each one a rotation basis, in the other P, Q and R in how many days will the work
be completed?

10) A can build up a structure in 8 days and B can break it in 3 days. A has worked for 4 days
and then B joined to work with A for another 2 days only. In how many days will A alone
build up the remaining part of the structure?

Use code “UDITSN5” to get maximum Discount on Plus/Iconic Subscriptions


Unacademy Plus CAT Content By UDIT SAINI
Answers

1) B
2) 38.5
3) 6 Days
4) 31%
5) 15 Days
2
6) 26 days
3
7) 39.75 days
8) 18.75 Days
9) 11 Days
𝟏
10) 7𝟑 Days

Use code “UDITSN5” to get maximum Discount on Plus/Iconic Subscriptions


Unacademy Plus CAT Content By UDIT SAINI

CAT - 2017, 18 & 19 “ Time & Work ” Previous Year Questions :-

https://youtu.be/QbcKt9CK2jU

CAT Previous Year (2017,2018 & 2019) Workshops

https://youtube.com/playlist?list=PLLtQdEJkug7vLA4qmuCJtB_AJ7HP518xT

Use code “UDITSN5” to get maximum Discount on


Plus/Iconic Subscriptions.

You might also like