You are on page 1of 2

Time and Work

TYPE - 1 11) A and B can do piece of work in 45 and 40 days


1) A can do some job in 10 days and B can do same in 20 respectively. They began work together, but A leaves after
days. If both of them work together, how long will they some days and B finished the remaining work in 23 days.
take to finish that job? After how many days did A leave?
1) 5.55days 2) 6.66days 3) 4.76days 4) 5.88days 5) none 1) 7 days 2) 8 days 3) 9 days 4) 10 days 5) 11 days
of these
12) A can do as much work in 2 days as B can do in 3 days
2) A can do some work in 10 days, B can do same work in and B can do as much work in 4 days as C can do in 5 days.
12 days, C in 15 days. What is the time taken to finish half A piece of work takes 20 days if all work together. How long
of the work if they all work together? would B take to do all the work by himself?
1) 2 days 2) 6 days 3) 12 days 4) 3 days 5) none of these 1) 50 days 2) 44 days 3) 66 days 4) 82 days 5) none of
these
3) I can do some work in 8 days, YOU can do same work in
4 days. What fraction of the work can be completed if we 13) A and B together can complete a piece of work in 20
work together for 2 days? days. B and C together can complete the same work in 30
1) 3/4 2) 1/4 3) 2/3 4) cannot be determined 5) none days A and C together can complete the same work in 40
of these days. What is the ratio of number of days taken by A when
completing the same work alone to the number of days
4) A can do a piece of work in 10 days, A and B together can taken by C when completing the same work alone?
finish the same work in 6 days. how many days will B take 1) 2:5 2) 2:7 3) 3:7 4) 1:5 5) 3:5
if he works alone on same work?
1) 10 2) 12 3) 14 4) 15 5) none of these 14) Amit and Sujit together can complete an assignment in
of data entry in 5 days. Sujit’s speed is 80% of Amit’s speed
5) To complete a piece of work A and B take 8 days, B and and total key depressions in the assignment are 576000.
C 12 days, A, B and C together will take 6 days. A and C will What is Amit’s speed in key depressions per hour if they
take how many days? work for 8 hours a day?
1) 7 2) 7.5 3) 8 4) 8.5 5) none of these 1) 4800 2) 6400 3) 8000 4) 7200 5) none of these

6) A is thrice as good as workman as B and therefore is able TYPE - 2


to finish a job in 60 days less than B. Working together, they
can do it in how many days? 1) 9 women can complete the piece of work in 19 days.
1) 20 2) 25 3) 22.5 4) 30 5) none of these How many days will 18 women take to complete the same
piece of work?
7) A can do 1/4 of the job in 3 days. B can do 1/6 of the 1) 12 2) 8.5 3) 6.5 4) 9.5 5) none of these
same job in 4 days. If they work together Rs 180 is to be
paid to them in total, how much A should get? 2) 8 men take 12 days to finish a piece of work by working
1) Rs 64 2) Rs 60 3) Rs 100 4) Rs 120 5) none of these 6 hours a day. How many days will 6 men take to finish the
same piece of work, working 4 hours a day?
8) A can build a wall in 10 days and B can build it in 5 days, 1) 20 2) 16 3) 24 4) 12 5) none of these
while C can completely destroy the wall in 20 days. If they
start working at the same time, in how many days will the 3) 56 men can do a job in 14 days. How many additional
work be completed? men are required to do the same job in 8 days?
1) 5 days 2) 2 days 3) 3 days 4) 4 days 5) none of these 1) 42 2) 24 3) 52 4) 35 5) none of these

9) A can do a piece of work in 10 days. B alone can do it in 4) 6 men can complete a piece of work in 48 hours. In how
15 days. If the total wages for the work is Rs 50, how much many hours 24 men complete the same piece of work?
money should A be paid if they work together for entire 1) 18 2) 16 3) 12 4) 24 5) none of these
duration of work?
1) Rs 30 2) Rs 40 3) Rs 50 4) Rs 20 5) none of these 5) A juice shop requires 35kg of sugar for 7 days. How many
kg of sugar will it require for 50 days?
10) A and B together can do a piece of work in 7 days. If A 1) 250 2) 150 3) 350 4) 300 5) none of these
does twice as much work as B in a given time, how long will
A alone take to do the work? 6) If 3 pumps can empty a tank in 2 days by working 8 hours
1) 11 days 2) 9.5 days 3) 6.33 days 4) 10.5 days a day, then how many hours a day must 4 pumps work to
5) none of these empty the tank in one day?
1) 12 hours 2) 15 hours 3) 18 hours 4) 9 hours 5) none
of these

Page 1
Time and Work

7) A canteen requires 651 bananas for a week. Totally, how


many bananas will it require for the months of April, May
and June 2009?
1) 9086 2) 8547 3) 9284 4) 8463 5) none of these

8) If 34 men completed 2/5th of a work in 8 days working


9 hours a day, how many more men should be engaged to
finish the rest of the work in 6 days working 9 hours a day?
1) 38 2) 34 3) 68 4) 62 5) none of these

9) A carbon copier requires 27 bundles of paper for 6 days.


How many bundles of paper will be required for 14 days?
1) 43 2) 36 3) 63 4) 44 5) none of these

10) If 2 men or 6 women or 4 boys can finish the work in 99


days, how many days will one man, one women and one
boy together take to finish the same work?
1) 54 2) 64 3) 44 4) 108 5) none of these

11) 3 men or 8 boys can do a piece of work in 17 days. How


many days will two men and six boys together take to finish
the same work?
1) 9 2) 11 3) 14 4) 12 5) none of these

12) 6 women alone can complete a piece of work in 10


days, where as 10 children alone take 15 days to complete
the same piece of work. How many days will 6 women and
10 children together take to complete the piece of work?
1) 7 2) 8 3) 6 4) 4 5) none of these

13) 2 women and 10 children together take 8 days to


complete a piece of work. How many days will 10 children
alone take to complete the piece of work if 8 women alone
can complete the piece of work in 6 days?
1) 15 2) 12 3) 10 4) 24 5) none of these

14) 12 women alone can complete the piece of work in 5


days, whereas 3 women and 9 children together can
complete same piece of work in 10 days. In how many days
can 36 children complete the same piece of work?
1) 20 2) 2 3) 5 4) 8 5) none of these

TYPE:1
1.B 2.A 3.C 4.D 5.C 6.C 7.D 8.D 9.A 10.D
TYPE:2
1.D 2.C 3.A 4.C 5. 6. 7. 8. 9. 10. 11.C 12.C 13.D 14.C
A A D B C D
11. 12. 13. 14.
D C B D

Page 2