Professional Documents
Culture Documents
QUANTITATIVE
APTITUDE
BASIC CIRCLE
DAY - 43
www.verandarace.com www.bankersdaily.in
BASIC CIRCLE BANKING
job assigned or the amount of job actually days (hours) , then that person’s 1 day’s
3. WORK and TIME directly proportional Then the part of work done by the man in
CHAIN RULE :
(d) 1/14 (e) 1/13
M1D1W2 = M2D2W1
2. Josh can paint a building in 17 days. How
Wages are directly proportional to the work In how many days can Sam complete the
money.
(a) 8 (b) 9 (c) 11
(d) 10 (e) 5
4. Arun & Karthik can do a piece of work (d) 13/12 (e) 24/13
alone in 4 and 12 days. In how many days
9. Raj can do a work in 20 days and Ram
can Arun and Karthik complete the work, if
in 15 days. If they work on it together for
they work together?
6 days, then the fraction of the work that is
(a) 3 (b) 5 (c) 4 left is?
5. P can do a piece of work in 10 days and (d) 8/15 (e) none of these
Q can do a piece of work in 15 days, what
10. L can finish a work in 24 days and M
is the efficiency of P?
can do the same work in 30 days. M worked
(a) 2 (b) 5 (c) 6 for 10 days and left the job. In how many
days, L alone can finish the remaining
(d) 4 (e) 3
work?
work in 20 days. Then work will be finished (d) 12 (e) none of these
by Nandhu alone in how many days?
19. In a Poultry farm, 20 hens eat 40 bags
(a) 70 (b) 50 (c) 80 of feed in 40 days. In how many days one
hen will eat one bag of feed?
(d) 30 (e) None of these
(a) 1 (b) 20 (c) 40
14. If 15 boys can stitch a dress in 60 days,
then the number of days taken by 10 boys (d) 80 (e) none of these
will be
20. 19 workers can repair the road in 12
(a) 60 (b) 90 (c) 40 days, working 5 hours a day. In how many
days 38 workers, working 6 hours a day,
(d) 75 (e) 40
complete a work?
15. A Person can arrange 20 boxes in 10
(a) 5 (b) 3 (c) 10
minutes, then how many boxes can be
arranged by the person in 35 minutes? (d) 4 (e) none of these
(a) 40 (b) 50 (c) 35 21. Ranjan gets Rs. 60 for every day that
he works. If he earns Rs. 1260 in a month
(d) 14 (e) 70
of 30 days. Then how many days he did not
17. 12 persons can do a piece of work in 8 they both work together to finish it, then
days, then how many persons are required out of total wages of 3000, what will be the
18. 3 pipes, working 6 hours a day, can fill 23. Madan can do a piece of work in 2 days
a tank in 2 days. How many hours a day while Sanjeev is half efficient as Madan.
must 4 pipes work to fill the tank in 1 day? The wage for the full work is Rs.1500. If
they both work together to complete the
(a) 9 (b) 11 (c) 10
work then find the earnings of Sanjeev and 28. Two taps X and Y can fill a tank in 10
Madan. and 15 hours respectively. If they are
opened together in what time the tank will
(a) 700,800 (b) 1250,250 (c) 500,1000
be filled actually?
25. Three men or eight women can do a (a) 30lits (b) 50lits (c) 30lits
(d) 12 days (e) none of these the leak takes to empty it?
26.10 women can complete a work in 7 (a) 15h (b) 16h (c) 30h
(e) None of these 1. (b) 2. (c) 3. (b) 4. (a) 5. (e) 6. (c) 7. (d)
8. (a) 9. (a) 10. (c) 11. (a) 12. (b) 13. (c)
27. An outlet pipe can empty a cistern in
14. (b) 15. (e) 16. (a) 17. (b) 18. (a) 19.
one hour, then what part of the cistern will
(b) 20. (a) 21. (c) 22. (d) 23. (c) 24. (d)
it empty in 1 min?
25. (d) 26. (c) 27. (c) 28. (e) 29. (b) 30.
(e) 30 days
(a) 12 hours (b) 10 hours
3. Ajay can complete 3/8 of work in 6 days. (a) 40 days (b) 4 days
Then, what part of the work will he finish in
(c) 15 days (d) 10 days
12 days ?
(c) 30 day (d) 46 days man to finish the work, in how many days
will 12 women finish the same work?
(e) None of these
(a) 16 (b) 14
10. 6 men or 8 women can complete a work
in 24 days. In how many days can 3 men (c) 11 (d) 12
and 4 women will complete the work.
(e) None of these
(a) 16 days (b) 20 days
14. First pipe L can fill a tank two times as
(c) 24 days (d) 21 days fast as second pipe M. If L and M together
can fill the tank in 36 mins, the slower pipe
(e) 32 days
alone will be able to fill the tank in
11. Aakash can finish a work in 15 days and
(a) 81 mins (b) 108 mins
Prasath can finish a work in 30 days.
Aakash started working alone and after few (c) 144 mins (d) 192 mins
days Prasath joined him and both
(e) 121 mins
completed the work in 4 days. After how
many days Prasath joined the work 15. A pipe can fill a tank in 14 hours, but
due to a leak in the tank, it is filled in 21
(a) 19 days (b) 18 days
hours. If the tank is full, how much time
(c) 9 days (d) 8 days the leak takes to empty the tank
completely?
(e) 12 days
(a) 14 hour (b) 35 hours
12. P, Q and R can complete a piece of work
in 15, 12, 10 days, respectively. P and Q (c) 21 hours (d) 20 hours
started the work together and left after 4
(e) 42 hours
days. If the remaining work can be done by
R, then in how many days the total work 16. To do a certain work B takes 2 times as
gets completed? long as A and C together. If A, B and C
together can complete the work in 10 days,
(a) 4 days (b) 6 days
how long would B take by him self?
(c) 12 days (d) 8 days
\(a) 24 days (b) 40 days
(e) 7 days
(c) 30 days (d) 94 days
13. 6 men and 12 women complete a
(e) 64 days
certain piece of work in 7 days. If each
woman takes twice the time taken by a
(e) 40 days