TIME & WORK
Exclusively prepared for RACE students
Chennai: #1, South Usman Road, T Nagar. | Madurai | Trichy | Salem | Coimbatore | Chandigarh|
Bangalore |Erode |Namakkal |Puducherry |Thanjavur| Trivandrum| Ernakulam| Tirunelveli | Vellore | Tirunelveli
| Tiruvanamalai | Coachin | Tuticorin | Rajapalayam | Kozhikode | Nagercoil |

H.O: 7601808080 / 9043303030 | www.raceinstitute.in


Chennai RACE Coaching Institute Pvt Ltd
Courses Offered : BANK | SSC | RRB | TNPSC |KPSC |

1. P can do a piece of work in 10 days and Q (d) 11/12 (e) 11/13

can do a piece of work in 15 days then how 5. A can do a work in 15 days and B in 20

many days P and Q together to complete the days. If they work on it together for 4 days,

work? then the fraction of the work that is left is?

(a) 4 (b) 5 (c) 6 (a) 1/10 (b) 1/4 (c) 7/15

(d) 7 (e) 3 (d) 8/15 (e) none of these

2. A and B alone can do a piece of wok in 30 6. A can finish a work in 18 days and B can do

and 60 days respectively. In how many days the same work in 15 days. B worked for 10

the work will be completed if they both work days and left the job. In how many days, A

on alternate days starting with B? alone can finish the remaining work?

(a) 40 (b) 25 (c) 30 (a) 8 (b) 5 (c) 6

(d) 45 (e) None of these (d) 51/2 (e) None of these

3. A & B together can do a piece of work in 6 7.A and B can complete a work in 15 days and

days. If A alone finished the work in 12 days, 10 days respectively. They started doing the

then how many days that B takes to finished work together but after 2 days B had to leave

the work? and A alone can finish the remaining work?

(a) 4 days (b) 6 days (c) 10days (a) 10 (b) 15 (c) 12

(d) 12 days (e) None of these (d) 8 (e) None of these

4. A can do a piece of work in 2 days, B can 8. A can do a certain job in 25 days which B

do the same work in 3 days, and C can do the alone can do in 20 days. A started the work

same work in 4 days. In how many days the and was joined by B after 10 days. The

work can completed, if they work together? number of days taken in completing the work

(a) 12/13 (b) 11/13 (c) 12/11 was

RACE Coaching Institute for Banking and Government Jobs


Courses Offered : BANK | SSC | RRB | TNPSC |KPSC | 2
Official Website: www.raceinstitute.in| Official Blog: www.bankersdaily.in
Chennai RACE Coaching Institute Pvt Ltd
Courses Offered : BANK | SSC | RRB | TNPSC |KPSC |

(a) 121/2 (b) 15 (c) 142/9 13. In a dairy farm, 40 cows eat 40 bags of

(d) 162/3 (e) none of these husk in 40 days. In how many days one cow

9. A can do a piece of work in 2 days, while B will eat one bag of husk?

can do same piece of work in 3 days then find (a) 1 (b) 40 (c) 1/40

their efficiency(ratio) ? (d) 80 (e) none of these

(a) 2 : 3 (b) 3 : 2 (c) 1.5 14. If 7 spiders make 7 webs in 7 days, then

(d) 1 : 5 (e) None of these 1 spider will make 1 web in how many days?

10. A is twice efficient as B. A and B together (a) 1 (b) 7 (c) 5

can finish the work in 5 days. Then work will (d) 1/7 (e) none of these

be finished by B alone in how many days? 15. 39 persons can repair the road in 12 days,

(a) 10 (b) 15 (c) 20 working 5 hours a day. In how many days a

(d) 25 (e) None of these 30 persons , working 6 hours a day, complete

11. A Person can make 10 box in 10 minutes, a work ?

then how many boxes can be made by the (a) 15 (b) 13 (c) 20

person in 20 minutes? (d) 24 (e) none of these

(a) 15 (b) 20 (c) 25 16. A baby requires 14 litres of milk for a

(d) 12 (e) 22 week, how many litres of milk the baby will

12. A farmer can plant 20 trees in 20 days, require for 30 days?

then how many days the farmer need to plant (a) 60 (b) 30 (c) 25

100 trees? (d) 90 (e) 100

(a) 150 (b) 120 (c) 100 17. A bottle manufacturing unit manufactures

(d) 250 (e) 125 4 dozen bottles in 2 days. How many dozen of

bottles will the plant manufacture in 5 days?

RACE Coaching Institute for Banking and Government Jobs


Courses Offered : BANK | SSC | RRB | TNPSC |KPSC | 3
Official Website: www.raceinstitute.in| Official Blog: www.bankersdaily.in
Chennai RACE Coaching Institute Pvt Ltd
Courses Offered : BANK | SSC | RRB | TNPSC |KPSC |

(a) 10 (b) 8 (c) 6 it for Rs.3200. With the help of C, they

(d) 20 (e) None of these completed the work in 3 days. How much is

18. Ramu gets Rs. 30 for every day that he to be paid to C?

works. If he earns Rs. 720 in a month of 30 (a) Rs.375 (b) Rs.400

days. Then how many days did he work? (c) Rs.600 (d) Rs.800

(a) 22 (b) 21 (c) 24 (e) None of these

(d) 26 (e) None of these 22. 56 men can do a job in 14 days. How

19.Shahrukh alone can finish a work in 4 days many additional men are required to do the

while Salman alone can finish it in 6 days. If same job in 8 days ?

they both work together to finish it, then out (a) 42 (b) 24 (c) 52

of total wages of 2000, what will be the (d) 25 (e) none of these

Shahrukh’s share? 23. Three men or eight boys can do a piece of

(a) 1200 (b) 800 (c) 600 work in 17 days. How many days will two men

(d) 1400 (e) None of these and six boys together take to finish the same

20. Mayank can do a piece of work in 3 days work?

while Sanjay can do the same work in 4 days. (a) 9 days (b) 11 days (c) 14 days

The wage for the full work is Rs 350. If they (d) 12 days (e) none of these

both work together to complete the work then 24. If 3 men or 9 boys can finish a piece of

find the earnings of Mayank and Sanjay. work in 21 days. In how many days can 5 men

(a) 200,150 (b) 150,200 (c) 200,100 and 6 boys together do the same piece of

(d) 100,200 (e) None of these work?

21. A alone can do a piece of work in 6 days (a) 12 days (b) 8 days

and B alone 8 days. A and B undertook to do (c) 14 days (d) cannot be determined

RACE Coaching Institute for Banking and Government Jobs


Courses Offered : BANK | SSC | RRB | TNPSC |KPSC | 4
Official Website: www.raceinstitute.in| Official Blog: www.bankersdaily.in
Chennai RACE Coaching Institute Pvt Ltd
Courses Offered : BANK | SSC | RRB | TNPSC |KPSC |

(e) none of these 29. Tap A can fill the tank in 10 hours, Tap B

25.10 women can complete a work in 7 days can empty the tank in 15 hours. If the both

and 10 children take 14 days to complete the tap are opened together how long time it will

work. How many days will 5 women and 10 take to full the tank?

children take to complete the work? (a) 20hrs (b) 10hrs (c) 30hrs

(a) 3 (b) 5 (c) 7 (d) 15hrs (e) 25hrs

(d) Data inadequate 30. Tap A and B can fill the tank in 10mins,

(e) None of these 15mins. Tap C can empty the tank in 12mins.

26. If a pipe fills a tank in 6 h, then what part If all the pipes are open simultaneously how

of the tank will the pipe fill in 1 h? much time is need to fill the tank?

(a) 1/3 (b) 1/6 (c) 1/4 (a) 10mins (b) 8mins (c) 12mins

(d) 1/5 (e) None of these (d) 15mins (e) None of these

27. An outlet pipe can empty a cistern in 30

min, then what part of the cistern will it empty Answers:

in 1 min? 1. (c) 2. (a) 3. (d) 4. (a) 5. (d) 6. (c) 7. (a) 8.

(a) 1/20 (b) 1/15 (c) 1/30 (d) 9. (b) 10. (b) 11. (b) 12. (c) 13. (b) 14.

(d) 1/18 (e) None of these (a) 15. (b) 16. (a) 17. (a) 18. (c) 19. (a) 20.

28. Two taps A and B can fill a tank in 10 and (a) 21. (b) 22. (a) 23. (d) 24. (e) 25. (c) 26.

15 hours respectively. If they are opened (b) 27. (c) 28. (e) 29. (c) 30. (c)

together in what time the tank will be filled

actually?

(a) 8hrs (b) 9hrs (c) 10hrs

(d) 12hrs (e) 6hrs

RACE Coaching Institute for Banking and Government Jobs


Courses Offered : BANK | SSC | RRB | TNPSC |KPSC | 5
Official Website: www.raceinstitute.in| Official Blog: www.bankersdaily.in

You might also like