1. P and Q can do a piece of work in 10 days. Q and 6. A can do a piece of work in (2x+4) days and B
R in 18 days and R and P in 25 days. If P, Q, R can do the same work in (3x + 6) days. If they
work together, then in how many days they will complete the work in 14.4 days working together,
complete the work? then find the number of days taken by B to
5 complete the half of work alone.
(1) 10 5/21 days (2) 10 22days
(1) 18 days (2) 13 days
5
(3) 20⅜ days (4) 2022days (3) 12 days (4) 10 days
(5) None of these (5) None of these

7. P, Q and R can complete the work in 12, 20 and


2. A can do a piece of work in 6 hours ; B and C can
30 days respectively. If P and Q started to work
do it in 4 ⅘ hours . A and C can do it in 4 hours
on alternative days with the help of R, then the
. How long will B alone take to do it ?
work will be completed in:
(1) 8 (2) 9 (1) 10 (2) 20
3 3
(3) 9 10days (4) 810days (3) 30 (4) 40
(5) None of these (5) None of these

3. P can do ⅔ of a work in 10 days , Q can do ½ of 8. A and B can complete a work in 12 days while A
is 50% more efficient than B then find how many
the work in 8 days and R can do x of the work in
days the work will be complete if they work on
10 days . If they do the work together in 6 days
alternative days starting with Ram?
then find the value of x ?
3
(1) 24 (2) 34
(1) (3) 44 (4) 54
10
7 (5) None of these
(2)
10
3
(3) 8 9. P and Q can do work in 8 and 12 days
5 respectively. They worked together for 2 days
(4) 8 and then they started to work alternatively. In
(5) None of these how many days the work will be completed?
(1) 7(½) (2) 8(½)
4. A and B together can complete the work in (x-8) (3) 10 (4) 12
days and A alone completes the work in x days. (5) None of these
A takes 10 days less than B to do the same work.
Find the value of x? 10. P alone can complete a work in 16 days and Q alone
(1) 30 days (2) 40 days in 12 days. Starting with P, they work on alternate
(3) 10 days (4) 20 days days. The total work will be completed in :
(5) None of these (1) 13(¾) (2) 14
(3) 17 (4) 19
5. A, B and M alone complete the work in 4x,5x and (5) None of these
20x days respectively. If they together complete
11. P, Q and R can do a piece of work in 11 days, 20
the work in 40 days, in how many days A alone
days and 55 days respectively, working alone.
completes the work?
How soon can the work be done if P is assisted
(1) 45 days (2) 40 days
by Q and R on alternate days ?
(3) 80 days (4) 100 days (1) 8 (2) 9
(5) None of these (3) 10 (4) 11
(5) None of these
Maths by Sumit Sir 4
Time and work for Bank Exam
12. X, Y and Z can do a piece of work in 20, 30 and 18. A does ⅗ th of the work in 5 days while B does
60 days respectively. In how many days can X do half of the remaining work in 6 days and the
the work if he is assisted by Y and Z on every remaining work is completed by C in 4 days. Find
third day? the time taken by B and C together to complete
(1) 12 (2) 13 the same work?
(3) 14 (4) 15 (1) 10 (2) 11
(5) None of these (3) 12 (4) 13
(5) None of these
13. P and Q together can complete a work in 12 days.
P alone can complete it in 20 days. If Q does the
19. A does 50% of the work in 3 hours while B does
work only for half a day daily, then in how many
days P and Q together will complete the work ? 25% of the remaining work in 2 hours and the
(1) 18 (2) 15 remaining work is finished by C in 3 hours. Find
(3) 12 (4) 20 the time taken by them together to complete the
(5) None of these whole work?
(1) 34/19 (2) 48/17
14. 7 men can complete a work in 12 days. They (3) 45/23 (4) 35/16
started the work and after 7 days, two men left. In (5) None of these
how many days will the work be completed by
the remaining men ? 20. X + Y, Y + Z and Z + X can complete a work in
(1) 7 (2) 9 3, 4, and 6 days respectively. Sum of the time
(3) 10 (4) 11 taken by X, Y and Z alone can complete the work
(5) None of these respectively?
(1) 45 days (2) 50.5 days
15. P does half as much work as Q does in 1/6th of
(3) 40 days (4) 36.8 days
the time. If together they take 10 days to complete
(5) None of these
a work, how much time (approx) shall P alone
take to do it?
(1) 14 (2) 13 21. A can do a piece of work in 8 days. B can do the
(3) 18 (4) 19 same in 14 days. In how many days can the work
(5) None of these be completed if A and B work together?
(1) 56/15 (2) 56/11
16. A can complete the work in 20 days and B can do (3) 9/11 (4) 10/11
one-fifth of the same work in 10 days. A started (5) None of these
the work and left after 8 days. Then B took over
to complete the remaining work. The total 22. P can do a work in 15 days and Q in 20 days. If
number of days taken by them to complete the they work on it together for 4 days, then the
work is: fraction of the work that is left is:
(1) 44 (2) 38 (1) 5/11 (2) 1/9
(3) 40 (4) 36
(3) 11/6 (4) 8/15
(5) None of these
(5) None of these
17. A can do the work in 10 days and B can do the
same work in 15 days. If B starts and A joins him 23. A can complete a task in 25 days while B can
after 5 days, then in how many days the work will finish it in 20 days. They work together on the
be completed? task for 5 days and then X leaves. In how many
(1) 9 (2) 10 days will B finish the remaining work?
(3) 11 (4) 12 (1) 11 (2) 17
(5) None of these (3) 19 (4) 20
(5) None of these
Maths by Sumit Sir 5
Time and work for Bank Exam

24. X, Y, and Z can complete a work in 40, 60, and 30. S can do a piece of work in 20 days. T is 25%
80 days respectively. They started working more efficient than S. The number of days taken
together. If X and Y left 11 days and 8 days by T to do the same piece of work is
before the completion of work. In how many days (1) 16 (2) 20
they will complete the work? (3) 18 (4) 29
(1) 17 (2) 26 (5) None of these
(3) 22 (4) 25
(5) None of these 31. A is thrice as efficient as B and is, therefore, able
to finish a piece of work 10 days earlier than B.
25. 24 men can do work in 16 days, while 32 women In how many days A and B will finish it together?
do the same work in 24 days. If 16 men and 16 (1) 15/4
women started the work, then after 12 days how (2) 7
many more men needed to finish the remaining (3) 8
work in 2 days? (4) 9
(1) 18 (2) 24 (5) None of these
(3) 19 (4) 20
(5) None of these 32. A is twice efficient as B who is thrice as efficient
as C .Working together, they can finish the work
26. X can do a piece of work in 30 days. Y can do it in 2 days. B can do the work alone in:
in 20 days, and Z can do it in 24 days. In how (1) 6
many days will they all do it together? (2) 7
(1) 8 (2) 6 (3) 9
(3) 9 (4) 10 (4) 8
(5) None of these (5) None of these

27. A is 30% more efficient than B. How much time 33. 18 men can do a piece of work in 20 days in 8
will they, working together, take to complete a hours per day. If the efficiency of the man is
job which A alone could have done in 23 days? double that of the woman, then in how many
(1) 13 (2) 14 hours per day 40 women can do the same work in
(3) 16 (4) 18 20 days?
(5) None of these (1) 7.2 (2) 8.2
(3) 9.2 (4) 4.5
28. A does half as much work as B in one sixth time. (5) None of these
If together they take 10 days to complete a work,
how much time shall B take to do it alone? 34. A and B can complete the work in 20 days and 30
(1) 40 (2) 50 days respectively and after 5 days C joins them.
(3) 70 (4) 60 C is twice the efficiency of B. In how many days
(5) None of these total work is completed?
7
(1) 89
29. A is 50% as efficient as B. C does half the work 8
done by A and B together. If C alone does the (2) 89
9
work together in 20 days, then A, B and C (3) 9
10
together Will Do The Work In? 8
(4) 79
(1) 20/3 (2) 10/3
(3) 20/7 (4) 24/5 (5) None of these
(5) None of these
Maths by Sumit Sir 6
Time and work for Bank Exam
35. 24 men complete half of the work in 10 days. 40. A alone completes the work in 20 days and the
Efficiency of women is double that of men. In efficiency of A is 200% more than the efficiency
how many days 8 men and 12 women complete of B. If A, B and C together can complete the
the work? work in 10 days and they get the total wages of
(1) 15 (2) 16 Rs.27000, then what is the wages of C?
(3) 17 (4) 15.5 (1) Rs.10000 (2) Rs.8000
(5) None of these (3) Rs.6000 (4) Rs.9000
(5) None of these
36. In a company 5 machines are running
4 41. X alone completes the work in 15 days.
simultaneously at a constant rate ‘r’ to produce 7
Efficiency of Y is 50% more than the efficiency
the total order for wrenches. The remaining
of X. If X and Y together can start the work, after
wrenches needed as per the order are to be
5 days X and Y left the work, then Z alone
produced in 3 hours with all 5 machines running
completes the remaining work in 5 days. If they
at the same rate ‘r’. If the cost of operating each
get the wages for the whole work is Rs.12000,
machine for one hour is Rs 25.00, find the total
then find the Z’s wages share.
cost of machine operation to meet the order.
(1) Rs.2300 (2) Rs.2000
(1) Rs.840 (2) Rs.875
(3) Rs.2200 (4) Rs.2100
(3) Rs.810 (4) Rs.880
(5) None of these
(5) None of these

42. A can complete 60% of the work in 12 days and


37. 25 women earned Rs. 119000 by working 17
A and B together can complete half of the work
days. How many men must work for 17 days to
in 7.5 days. If A, B and C together can complete
receive Rs. 190400 provided the daily wages of a
40% of the work in 3 days and they are gets the
man is twice that of a woman?
total wages is 1600, then what is the wage of B?
(1) 24 men (2) 20 men
(1) Rs.260 (2) Rs.220
(3) 22 men (4) 26 men
(3) Rs 200 (4) Rs.240
(5) None of these
(5) None of these
38. P alone completes the work in 15 days and Q
43. A can complete a piece of work in 24 days , B is
alone completes the work in 30 days and P, Q and
25% less efficient than A. B started the work and
R together can complete the work in 5 days. If
worked for 8 days and left and the remaining part
they earned the total wages Rs.1800, what is the
of the work is completed by A. What is the share
share of R?
of B if the total wages is Rs.2000?
(1) Rs.900 (2) Rs.950
(1) Rs.550 (2) Rs.500
(3) Rs.800 (4) Rs.850
(3) Rs.750 (4) Rs.450
(5) None of these
(5) None of these
39. M alone completes the work in 24 days and N
44. A can do the piece of work in 12 days and the
alone completes the work in 18 days. M and N
ratio of the efficiency of A and B is 3:1. A, B and
gets the wages of Rs.7000. With the help of O
C together can complete half of the work in 3
they finish the work in 9 days. How much money
days. If they get the total wages of 6300, then
will O be paid?
what is the wage of C?
(1) Rs.800 (2) Rs.875
(1) Rs.2100 (2) Rs.1800
(3) Rs.1200 (4) Rs.600
(3) Rs.1900 (4) Rs.1000
(5) None of these
(5) None of these
Maths by Sumit Sir 7
Time and work for Bank Exam
45. A, B and C work together to complete a work 48. 6 Men and 3 women can do a piece of work in 7
worth Rs.7080. The ratio of time taken to days, while 5 men and 3 women can do the work
complete the work by A, B and C is 7: 8: 12. Find in 8 days. if a man gets Rs x per day, what should
the wage for C. be the wage of a woman per day?
(1) Rs.1680 (2) Rs.1780 (1) 4x/5 (2) x/5
(3) Rs.1880 (4) Rs.1980 (3) 2x/5 (4) 3x/5
(5) None of these (5) None of these

46. P, Q and R can complete the work in 20 days, 24 49. A can do a piece of work in 20 days while B alone
days and 30 days respectively. The total wage is can do it in 30 days. They work together for 5
Rs.7500. If they work together to complete the days and the rest of the work is done by C in 2
work, what is P’s wage? days. If they get Rs 1500 for the whole work, B
(1) Rs.2000 (2) Rs.5000 gets Rs x and E gets Rs.2x for doing some other
(3) Rs.3000 (4) Rs.4000 work ,then find the amount earned by E?
(5) None of these (1) Rs. 400 (2) Rs. 700
(3) Rs. 900 (4) Rs. 800
47. P, Q and R can do work in 8, 6 and 12 days (5) None of these
respectively. Doing that work together they get an
amount of Rs 5490. If x is the share of P in that 50. A and her friend B undertook a piece of work for
amount and (x+130) is the amount earned by S Rs 900. A alone could do the work in 12 days and
for doing another work, find the amount earned b in 18 days. With the assistance of c, they
by S? completed the work in 4 days. If x and y is the
(1) Rs. 1960 amount received by A and B respectively then
(2) Rs. 1788 find the value of (x-y)?
(3) Rs. 1800 (1) 200 (2) 100
(4) Rs. 1900 (3) 400 (4) 300
(5) None of these (5) None of these
Maths by Sumit Sir 8
Time and work for Bank Exam
Answer Key
1. (2) 11. (1) 21. (2) 31. (1) 41. (2)
2. (1) 12. (4) 22. (4) 32. (3) 42. (3)
3. (3) 13. (2) 23. (1) 33. (1) 43. (2)
4. (4) 14. (1) 24. (2) 34. (2) 44. (1)
5. (2) 15. (2) 25. (2) 35. (1) 45. (1)
6. (1) 16. (2) 26. (1) 36. (2) 46. (3)
7. (1) 17. (1) 27. (1) 37. (2) 47. (1)
8. (1) 18. (3) 28. (1) 38. (1) 48. (4)
9. (1) 19. (2) 29. (1) 39. (2) 49. (1)
10. (1) 20. (4) 30. (1) 40. (4) 50. (2)
Maths by Sumit Sir 9
Time and work for Bank Exam
Hints & Solutions
1. Solution (2) 1 1 x 1
=> + + =
LCM (10,18,25) = 900 units 15 16 10 6
Let total work to be done be 900 units. x 1 1 1
=> = − −
Work done by ; 10 6 16 15
900 x (40 − 15 − 16)
P+Q in a day = = 90 units— (1) => =
10 10 240
900 9 3
Q+R in a day = = 50 units– (2) => X = =
18
900 24 8
R+P in a day = 25 = 36 units— (3)
Adding (1), (2) and (3) 4. Solution (4)
=> 2(P + Q + R) = 176 Given;
=> P + Q + R = 88 units (using 1) A = B − 10
Time taken by P+Q+R to complete the work = => A + 10 = B
900 5
= 10(22)days Time taken by A and B = (x − 8)
88
1 1 1
=> + =
2. Solution (1) x x + 10 x − 8
2x + 10 1
LCM (6,24/5,4)= 24 units => 2 =
(x + 10x) x − 8
Let total work to be done be 24 units.
=> (2x + 10)(x − 8) = x 2 + 10x
Work done by ;
24 => 2x 2 − 6x − 80 = x 2 + 10x
A in a day = = 4 units— (1)
6 => x 2 − 16x − 80 = 0
24×5
B+C in a day = = 5 units– (2) => x 2 − 20x + 4x − 80 = 0
24
24 => (x − 20)(x + 4) = 0
A+C in a day = 4 = 6 units— (3)
=>x=20, since x cannot take negative values.
Putting (1) in (3);
4+C=6 5. Solution (2)
=> C = 2 units 1 1 1 1
Putting C in (2); + + =
A B M 40
2+B=5 1 1 1 1
=> + + =
> B = 3 units 4x 15x 20x 40
Time taken by B to complete the work =
24
= 10 1
3 => =
20x 40
8 days => x = 20
Time taken by A alone = 4x = 80 days
3. Solution (3)
Time taken by P to complete 100% work = 10 ×
3
6. Solution (1)
2
= 15 days Time taken by A and B to complete the work =
Time taken by Q to complete 100% work = 8 × 14.4 days = 72/5 days
2 = 16 days 1 1 5
=> + =
Time taken by R to complete 100% work = A B 72
10 1 1 5
x
days => + =
2x + 4 3x + 6 72
As per question; 5
1 1 1 1 => (5x + 10)/(6x 2 + 24x + 24) =
+ + = 72
P Q R 6 => 360x + 720 = 30x 2 + 120x + 120
=> 30x 2 − 240x − 600 = 0
Maths by Sumit Sir 10
Time and work for Bank Exam
=> x 2 − 8x − 20 = 0 10. Solution (1)
=> x 2 − 10x + 2x − 20 = 0 LCM(16,12)= 48
=> (x − 10)(x + 2) = 0 The total work to be done is 48 units.
48
=>X=10, as values of x cannot be negative. Work done by P in 1 day = = 3 unit
16
Time taken by B to complete half of the work = 48
Work done by Q in 1 day = = 4 unit
3x + 6/2 = 36/2 = 18 days 12
Work done by P + Q in 2 day = 7 unit
7. Solution (1) Work done by P + Q in 12 day = 7 × 6 = 42 unit
LCM(12,20,30)= 60 Remaining work = 48 − 42 = 6 unit
The total work to be done is 60 units. Work done by P on 13th day = 3 units
Work done by P in 1 day =
60
= 5 unit Remaining work = 6 − 3 = 3 unit
12 3
60 Time taken by Q to do 3 unit of work = day
Work done by Q in 1 day = = 3 unit 4
20 3 3
60 So; total time taken = 13 + 4 = 13(4) days
Work done by R in 1 day = 30
= 2 unit
Work done by P + R in 1 day = 7 unit
11. Solution (1)
Work done by Q+ R in 1 day = 5 units
LCM(11,20,55)= 220
So; work done in 2 days = 12 × 1 = 12 units
The total work to be done is 220 units.
So, in 10 days total work done = 12 × 5 = 220
60 unit Work done by P in 1 day = 11
= 20 units
Hence, time taken 10 days. 220
Work done by Q in 1 day = = 11 units
20
220
8. Solution (1) Work done by R in 1 day = 55
= 4 units
Let work done by A in 1 day be 2 units. Work done by P + Q in 1 day = 31 unit
So work done by B in 1 day = 1.5 × 2 = 3 units Work done by P+ R in 1 day = 24 units
So; when both work together, total work done in; So; work done in 2 days = 31 + 24 = 55 units
12 days = 12(2 + 3) = 60 units Work done in 8 days = 55 × 4 = 220 units
When, A and B work alternate days, Hence time taken = 8 days
Work done in 2 day = 5 units
SO, 12. Solution (4)
work done in 24 days = 12 × 5 = 60 units LCM(20,30,60)= 60
The total work to be done is 60 units.
9. Solution (1) Work done by X in 1 day =
60
= 3 units
LCM(8,12)= 24 20
60
The total work to be done is 24 units. Work done by Y in 1 day = 30 = 2 units
24 60
Work done by P in 1 day = = 3 unit Work done by Z in 1 day = 60 = 1 units
8
24
Work done by Q in 1 day = = 2 unit Work done by X in 2 days = 6 unit
12
Work done by P+Q in 1 day = 5 unit Work done by X +Y+Z in 1 day = 6 units
Work done by P + Q in 2 day = 5 × 2 = 10 unit So, work done in 3 days = 12 units
Remaining work = 24 − 10 = 14 units So; work done in 15 days = 12 × 5 = 60 units
When they start working together, Hence time taken = 15 days
Work done by P and Q in 4 days = 10 units
Work done by P in 5 th day = 3 units 13. Solution (2)
Remaining work = 14 − 10 − 3 = 1 units LCM(12,20)= 60
1 The total work to be done is 60 units.
So, 1 unit of work will be done by Q in 2days
60
1 1 Work done by P+Q in 1 day = = 5 units
So; total time taken = 2 + 4 + 1 +2 = 7(2) 12
60
Work done by P in 1 day = = 3 units
20
Maths by Sumit Sir 11
Time and work for Bank Exam
Work done by Q in 1 day = 5 − 3 = 2 units 17. Solution (1)
Work done by Q in half day = 1 unit LCM(10,15)= 30
Work done by X +Y+Z in 1 day = 6 units The total work to be done is 30 units.
30
So, work done in P+Q in 1 day = 3 + 1 = 4 units Work done by A in 1 day = 10 = 3 units
60 30
Hence time taken to complete the work = 4
= Work done by B in 1 day = = 2 units
15
15 days Work done by B in 5 days = 2 × 5 = 10 units
Let both of them work together for x days.
14. Solution (1) As per question;
Let efficiency of 1 man be 1 unit. 10 + x(3 + 2) = 30
Total work to be done = 7 × 12 = 84 units => 5x = 20
Work done in 5 days by 7 men = 7 × 7 = => x = 4 days
49 units Thus, total time taken = 5 + 4 = 9 days
Remaining work = 84 − 49 = 35 units
After 2 men left, 18. Solution (3)
Time taken by 5 men to do the remaining work= Let the total work to be done is represented by the
35 unit "1."
= 7 days
5
According to the question,
A completes 3/5th of the work in 5 days
15. Solution (2) 3
As per question; => A completes ( ) × 1 = 0.6 units of work in
5
1 1 5 days.
A × = B× Therefore, the remaining work is 1 − 0.6 =
6 2
=> A = 3B => A = 3B 0.4 units.
Let efficiency of B be 1 unit. B completes half of the remaining work, which is;
1
Then efficiency of A = 3 unit (2) × 0.4 = 0.2 units, in 6 days.
So, Therefore, the remaining work for C is 0.4 −
Work done by A and B in 10 days = 10(3 + 0.2 = 0.2 units.
1) = 40 unit
So, time taken by A alone to 40 units of work = C completes this remaining work in 4 days.
40 0.6
days = 13 days (approx) Work done by A in 1 day= = 0.12 units.
3 5
0.2
Work done by B in 1 day = 6 = 0.0333 units.
16. Solution (2) 0.2
Time taken by B to do the work= 10 × 5 = Work done by C in 1 day = 4 = 0.05 units
50 days Work done by B and C in 1 day= 0.0333 +
LCM(20,50)= 100 0.05 = 0.0833 units
Let total work to be done is 100 units. Therefore, B and C together can complete the
100 work in;
Work done by A in 1 day = 20
= 5 units
1
100 0.833
= 12 days (approx)
Work done by B in 1 day = 50
= 2 units
Let B work for x days.
19. Solution (2)
As per question; Let the total work is represented by the value 1.
5 × 8 + 2 × x = 100 According to the problem,
=> 2x = 60 A does 50% of the work in 3 hours, A can do the
=> x = 30 days whole work in 6 hours. Therefore,
Thus, total time taken = 8 + 30 = 38 days A's efficiency can be represented as
1
6
Maths by Sumit Sir 12
Time and work for Bank Exam
work is remaining after A completes 50% of the 56
Time taken by A and B to do the work = =
7+4
work= 1 − 0.5 = 0.5 56
B does 25% of the remaining work in 2 hours, 11
days
which means that B can do 25% of 0.5, or 0.125,
in 2 hours. Therefore, 22. Solution (4)
B's efficiency =
0.125
=
1 LCM (15,20)= 60
2 16 The total work to be done is 60 units.
Remaining work = 0.5 − 0.125 = 0.375 60
Work done by A in 1 day = = 4 units
C completes the remaining work in 3 hours, which 15
60
means that C can do 0.375 of the work in 3 hours. Work done by B in 1 day = 20
= 3 units
Therefore, Work done by A and B in 4 days = 4 × 7 =
0.375 1
C's efficiency = 3
= 8
. 28 units
Combined efficiency; =>
1
+
1
+
1
=
8
+ Remaining work = 60 − 28 = 32 units
6 16 8 48 32 8
3 6 17 Fraction of work left = 60 = 15
48
+ 48
= 48
Therefore, A, B, and C can complete the whole
48
23. Solution (1)
work = LCM (25,20) = 100
17
Let total work to be done is 100 units.
20. Solution (4) 100
Work done by A in 1 day = = 4 units
25
LCM (3,4,6)= 12 100
The total work to be done is 12 units. Work done by B in 1 day = = 5 units
20

Work done by X+Y in 1 day =


12
= 4 units Work done by A and B in 5 days = 5 × 9 =
3
12 45 units
Work done by Y+Z in 1 day = 4
= 3 units Remaining work = 100 − 45 = 55 units
12
Work done by Z+X in 1 day = = 2 units Time taken by B to complete the remaining
6
55
Thus, work = 5
= 11 days
4+3+2
Work done by X+Y+Z in 1 day = 2
=
4.5 unit 24. Solution (2)
Work done by X in 1 day = 4.5 − 3 = 1.5 units LCM(40,60,80)= 240
Time taken by X to complete the work alone = Let total work to be done is 240 units and time
12 taken to complete the work be k days.
1.5
= 8 days 240
Work done by X in 1 day = 40
= 6 units
Work done by Y in 1 day = 4.5 − 2 = 2.5 units
240
Time taken by Y to complete the work alone = Work done by Y in 1 day = 60 = 4 units
12 240
= 4.8 days Work done by Z in 1 day = = 3 units
2.5 80
Work done by Z in 1 day = 4.5 − 4 = 0.5 units As per question;
Time taken by Z to complete the work alone = 6(k − 11) + 4(k − 8) + 3k = 240
12
= 24 days => 13k = 240 + 66 + 32
0.5
Therefore, sum = 24 + 4.8 + 8 = 36.8 days => 13k = 338
=> k = 26 days
21. Solution (2)
LCM (8,14)= 56 25. Solution (2)
The total work to be done is 56 units. 24 men can complete in 16 days = 100% work.
56 So, one man can complete in 16 days = 100/
Work done by A in 1 day = = 7 units
8 24% of work
56
Work done by B in 1 day = 14
= 4 units
Maths by Sumit Sir 13
Time and work for Bank Exam
100 29. Solution (1)
One man can complete in 1 day = =
16×24
Let work done by B in 1 day be 2 units.
0.26% work 2
100 So, work done by A in 1 day = 2 = 1 unit
One women can complete in 1 day = =
24×32 2+1
Work done by C in 1 day = = 1.5 units
0.13% work 2

One women and one men can complete in 1 day = Total work done by c alone in 20 days = 20 ×
0.26 + 0.13 = 0.39% work 1.5 = 30 unit
So, 16 man and 16 women can complete in 12 Time taken by all of them to complete the work
together
days = 0.39 × 12 × 16 = 75% work
30 30 20
Rest Work = 25% = = = days
2 + 1 + 1.5 4.5 3
To complete 25% work in 2 days, no. of men
required = 242 × 0.26 = 48 men 30. Solution (1)
So, extra men = 48 − 24 = 24. Let work done by S in 1 day be 4 units.
So, work done by T in 1 day = 1.25 × 4 =
26. Solution (1) 5 units
LCM(30,20,24)= 120 Total work done by S alone in 20 days = 20 ×
Let total work to be done is 120 units. 4 = 80 units
120 Time taken by T to complete the work together =
Work done by X in 1 day = 30
= 4 units
80
120 = 16 days
Work done by Y in 1 day = = 6 units 5
20
120
Work done by Z in 1 day = = 5 units 31. Solution (1)
24
120 Let work done by B in 1 day be 1 unit.
Time taken by all of them together = 4+6+5
=
Work done by A in 1 day = 3 units
8 days
Let total work to be done be x units.
Time taken by B = x days
27. Solution (1) x
Time taken by A = 3 days
Let work done by B alone in 1 day be 10 units.
Work done by A in 1 day= 1.3 × 10 = 13 units As per question;
x
Total work done by A alone in 23 days = 23 × = x − 10
3
13 units 2x
Time taken by both to complete the work together => = 10
3
23×13 => x = 15
= 10+13
= 13 days
Therefore, time taken by A and B to complete the
whole work
28. Solution (1) 15 15
= = days
According to the question; 1+3 4
1 1
=> A × = B × 32. Solution (3)
6 2
A 3 Let work done by C in 1 day be 1 unit.
=> = So, work done by B in 1 day = 2 unit
B 1
Let efficiency of A be 3 units and efficiency of B Work done by A in 1 day = 2 × 3 = 6 units
in 1 unit. Total work done by all of them in 24 days =
Since, A and B complete the work in 10 days, 2(1 + 2 + 6) = 18 unit
18
Total work done = (3 + 1) × 10 = 40 units Time taken by B to complete the work = =
2
40
Time taken by B alone = 1
= 40 days 9 days
Maths by Sumit Sir 14
Time and work for Bank Exam
33. Solution (1) 37. Solution (2)
Let efficiency of women be 1 unit. Wage of men/women on particular day = total
So, efficiency of men = 2 units wages/(days worked* total men/women)
119000
Total work done by mens = 18 × 20 × 8 × Wage of 1 women in a day = = 280
17×25
2 units Since, men do twice the work in a day.
As per ques; So wage if 1 men in a day = 2 × 280 = Rs 560
Let the number of hours per day worked by Total men needed to complete the work =
190400
women be x hrs. = 20 men
(17×560)
Total work done by women = Total work done by
men 38. Solution (1)
=> x × 40 × 20 × 1 = 18 × 20 × 8 × 2 Let's assume that the total work is 1 unit
=> x = 7.2 hrs Let's say R's daily work rate is r.
1
P's daily work rate = 15
34. Solution (2) 1
Q's daily work rate =
LCM (20,30)= 60 30
1
Let total work be 60 units. Combined daily work rate of P, Q and R = 15
60 So ;
Work done by B in 1 day = 30
= 2 units.
1 1 1
Work done by C in 1 day = 2 × 2 = 4 units + + r =
60 15 30 5
Work done by A in 1 day = = 3 units 1 1 1
20 r = − −
Let C do work for x days. 5 15 30
1
As per question; r =
10
5(2 + 3) + x(9) = 60 So R's daily work rate is 1/10 of the work in a day,
=> 9x = 35 which means R can complete the entire work in 10
35 days.
=> x = days
9 Total wages = Rs 1800.
35 80 8 1
Total time taken = 9 + 5 = 9 = 8(9) days Then, R's share of the wages= (10) × 5 ×
1800 = Rs. 900
35. Solution (1) Therefore,
Let efficiency of men be 1 unit. R's share of the wages is Rs.900.
Then, efficiency of women = 2 units
Total work done to be done by men( i.e. 100% 39. Solution (2)
work)= 1 × 24 × 2 × 10 = 480 units LCM(9,24,18)= 72
Time taken by 8 men and 12 women to complete Let work to be done be 72 units.
Let work done by O in 1 day be x units.
the work
480 480 Work done in a day by;
= [8+12(2)] = = 15 days 72
32 M= 24
= 3 units
72
N= 18
= 4 units
36. Solution (2) 72
As the rate of the work is constant M+N+O = = 8 units
9
3 => M + N + O = 8
7
units of the work have to be done in 3
3
=> 4 + 3 + O = 8
1 unit of work will be done in 3 = 7 hours => O = 1 units
7
Efficiency of M:N:O= 3: 4: 1
Total cost of machine operation = 7 × 25 × 1
5 = Rs. 875 O’s share = 8 × 7000 = Rs 875
Maths by Sumit Sir 15
Time and work for Bank Exam
40. Solution (4) 43. Solution (2)
Let work be done by B in 1 day 1 unit. Let's first find out the efficiency of B relative to A.
Work done by A in 1 day = 3 units. We know that B is 25% less efficient than A,
Total work done by A in 20 day s= 3 × 60 = which means B's efficiency is 75% of A's
40 units efficiency.
Let work by C in 1 day be x units. A can complete the work in 24 days, then A's
60
Work done by A+B+C in 1 day = 10
= 6 units efficiency is 1/24 of the work per day.
=> A + B + C = 6 75 1
B's efficiency is 75% of that, or (100) × (24) =
=> 1 + 3 + x = 6 1
=> x = 2 unit of the work per day.
32
1 1
Efficiency of A:B:C= 3: 1: 2 So; in 8 days, B completed 8 × ( ) = of the
2 32 4
C’s share = × 27000 = Rs 9000 work.
6
The remaining work that A needs to complete is
41. Solution (2) 1 3
1 − = of the work.
4 4
Let work be done by X in 1 day 2 units.
3 Since A's efficiency is 1/24 of the work per day, A
Work done by Y in 1 day = 2
× 2 = 3 units. 3
4
Total work done by X in 15 days= 2 × 15 = can complete 3/4 of the work in ( ) = 18 days.
1
24
30 units
Since B completed 1/4 of the work, his share of
Work done by X+Y in 5 days= 5(2 + 3) =
the wages is
25 units
1
Work left = 30 − 25 = 5 units ( ) × 2000 = Rs. 500.
4
Let work by Z in 1 day be x units.
Therefore, B's share of the wages is Rs. 500.
5
Work done by Z in 1 day = 5
= 1 units
Efficiency of X:Y:Z= 2: 3: 1 44. Solution (1)
1
z”s share = × 12000 = Rs 2000
6
Let work be done by B in 1 day 1 unit.
Work done by A in 1 day = 3 units.
42. Solution (3) Total work done by A in 12 days= 3 × 12 =
LCM(20,15,15/2)= 60 36 units
12
Time taken by A to complete 100% work = = Let work by C in 1 day be x units.
0.6
36
20 days Work done by A+B+C in 8 day = 2
= 18 units
Time taken by A+B to complete 100% work = => 3(A + B + C) = 18
7.5 × 2 = 15 days => 1 + 3 + x = 6
Time taken by A+B+C to complete 100% of => x = 2 unit
3 1
work= 0.4
= days Efficiency of A:B:C= 3: 1: 2
Work done by A in 1 day = 60/20 = 3 units 2
C’s share = 6 × 6300 = Rs 2100
Work done by A+B in 1 day = 60/15 units
=> 3 + B = 4
45. Solution (1)
=> B = 1 units
Time taken by A:B:C = 7: 8: 12
Similarly, work done by C in 1 day = 60/(15/
1 1 1
2) − 1 − 3 = 8 − 1 − 3 = 4 units =>Efficiency of A:B:C= 7 : 8 : 12 = 96: 84: 56 =
Efficiency of A:B:C= 3: 1: 4 24: 21: 14
B’s share = 1/8 ∗ 1600 = Rs 200 14
C’s wage = 59
× 7080 = Rs 1680
Maths by Sumit Sir 16
Time and work for Bank Exam
46. Solution (3) 49. Solution (1)
1 1 1 LCM(20,30)= 60
Efficiency of P:Q:R = : : = 6: 5: 4
20 24 3
6
Let total work be done by 60 units.
So; wage of P = × 7500 = 3000 60
15 Work by A in 1 day = 20
= 3 units
60
Work done by B in 1 day = = 2 units
47. Solution (1) 30
5 1
Ratio of Time taken by P:Q:R = 8: 6: 12 Part of work done by A = 3 × =
60 4
1 1 1 5 1
=>Efficiency of P:Q:R= 8 : 6 : 12 = 6: 8: 4 = Part of work done by B = 2 × 60 = 6
3: 4: 2 (60−15−10)
Part of work done by C = 60
=× 712
3
Share of P, x = × 5490 = 1830 1 1 7
9 Ratio of share of A:B:C= : :
4 6 122
= 6: 2: 7
Share of S, x+130 = 1830 + 130 = 1960 2
B’s share,x = × 1500 = Rs 200
15
48. Solution (4) E’s share = Rs 200 × 2 = Rs 400
Let work done by men and women in a day be m
and w units respectively. 50. Solution (2)
As per question; LCM(12,18) = 36
Let total work be done by 36 units.
(6m + 3w)7 = (5m + 3w)8 36
=> 42m + 21w = 40m + 24w Work by A in 1 day = 12
= 3 units
36
=> 2m = 3w Work done by B in 1 day = = 2 units
18
=> m: w = 3: 2 3
Part of work done by A day = 4 × 36 = 1/3
Let the daily wages of man = 3a
2
daily wages of woman = 2a Part of work done by B = 4 × 36 = 2/9
=> 5a = x (36−12−8) 4
Part of work done by C = =
x 36 9
=> a = Ratio of share of A:B:C=
1 2 4
: : = 3: 2: 4
5 3 9 9
Daily wage of man = 3a 3
A’s share,x = × 900 = Rs 300
x 9
=3 × ( ) 2
B’s share= 9 × 900 = Rs 200
5
3x
= 5 Therefore; x − y = 300 − 200 = 100

PW Web/App - https://smart.link/7wwosivoicgd4

Library- https://smart.link/sdfez8ejd80if
Maths by Sumit Sir 17
Time and work for Bank Exam

PW Web/App - https://smart.link/7wwosivoicgd4

Library- https://smart.link/sdfez8ejd80if

You might also like