Been lead the site project team for a period of 1.2 years to complete 132KV OHL
construction project (80KM).
Work experience includes 400 kV, 220kV & 132kV OHL Construction and 132KV GS
construction, 40 MVAR Reactors Bay Construction for 400KV GIS stations, 132kv &
33KV UG Cable laying, Cable Sealing End (CSE) connection with switchgear &
Substation Construction & Maintenance projects.
Having working experience and knowledge of PDO, OETC projects (Oman) & Transco,
FEWA, DEWA, ADCO & Al Hosn Gas client’s (UAE) standards in GCC.
1 of 7
CAREER HISTORY:
2 of 7
Project 2- Adding 132KV/33KV, 125 MVA third and fourth Transformers at Airport
heights grid stations.
Project Value: 25 Million USD (Approx.), OETC, Oman.
Key elements of the Projects:
Installation of new 2x125MVA, 132kV/33KV transformers with necessary switchgear.
Addition of 132kV GIS bays for the existing facility.
Construction new 33kV Switchgear building with necessary control room and
equipment.
132kV cable laying and terminations at CSE & GIS end.
33kV capacitor banks installation.
Construction supervision for construction of new 132/33kV GIS station along with the
bay extensions for existing outdoor as well as GIS grid stations.
Installation of 400KV, 132KV GIS equipment like circuit breakers, Isolator switches with
and without Earth switches, Current transformers and voltage transformers, 125 MVA
transformers, GIS Bus couplers and Bus sections.
Extension of existing 132KV AIS & GIS bays and installation of respective switchgears
along with necessary gantry towers, HV cable laying, CSE, SA, CVT, CT, CB, Isolators
installation.
2500 Sq.mm, 132KV cable laying between external gantry to GIS end and 800 Sq.mm
HV cable laying between GIS end to 125MVA Power transformers.
Attending the witness for site equipment testing prior to the commissioning along with
the client’s Engineer.
Checking the quality of works during and after completion of the project works.
Issuing site Instructions to contractor for the NCR’s found during inspections.
Receiving the RFIs from Contractor and clearing the same upon inspections in
reference to approved drawings and Project specifications.
Lead snagging procedure to check electrical systems after substantial completion of
construction activities. Ensuring that a snag list is prepared based on outstanding
works and submitting to the client.
Reviewing all as-built drawings provided by contractors prior to their submittal to
client for taking TOC/FAC.
Managing the daily activities and performance of the Supervision team. Constant
liaisons with Client and contractor on project related matters.
Support and report to the Project Manager on the monitoring of the site activities,
progress of works, coordination, and resolution of the site issues. Monitor the progress
report and provide assistance to the Project Manager in preparation of schedules for
submitting to client about project completion.
Manage and monitor the relevant project information and documents related to
progress, issues, Non-conformities, correctives actions, reports and plans from the
contractor’s supervision team, provide approval towards the same.
3 of 7
Universal Consulting Engineers, Oman (Oct’2017 to Jan’2018)
4 of 7
issuing by client and taking the appropriate action for the close of issues specified in
the given reports.
Preparation of progress reports (Daily, Weekly & Monthly report) for client/Consultant
as well as for internal review.
Project Cost Monitoring, Preparing project cash flow.
Preparing & Analyzing the BOQ for OHL works.
Preparation of POs/WOs for suppliers, subcontractors for site works.
5 of 7
Transformer, Circuit Breaker – SF6, VCB, ACB, Disconnectors – With & Without Earth
Switch, Lightening Arresters, Power & Control Cables, Bus bar, Switchgear, MV & LV
Panels, Control & Relay Panels, DC Panel, MCC Panel & All Earthing System as per the
approved drawings and technical specifications.
132kV OHL Steel towers erection of all the types, Conductor & OPGW stringing,
Sagging & installation of Accessories.
132KV cable laying and Cable sealing End installation.
132KV OHL Feeder control panel, Protection panel and telecom panel installation and
control cable laying.
Managing the project during construction period and in warranty maintenance time.
Performing the contract closeout and verifying the installed quantities to make it
certified by the client’s engineer for billing purpose.
Maintaining the document register and proper records of checklists issuing to the
subcontractors as well as client consultant.
Coordinating with the Client, consultant for the site inspections and completion of
site activities along with the site works supervision.
Coordinating with third party organization for the splicing and OTDR test of the
OPGW and End to End test for the Conductor.
Coordinating with the clients for the arrangement witness for the site tests and for
other necessary checking as a witness and getting their approvals.
Preparing the Method Statements and Job Specific Risk assessments for the carrying
out works.
Competent person certified from the Client to receive and Clearance of LOA, PTW
safety documents as per the site requirements.
Measuring the Earth values of Towers, Equipment and making necessary rectifies.
Responsible for Project Execution / control as per contract specification, designs and
engineering standards.
Estimating required Electrical materials as per approved drawings, and BOQ
Co-ordinate on-site activities to ensure smooth work progress and Co-ordinate with
various departments related to Electrical Construction ensures Safe Working
Environment and Snag free Operation.
Maintenance and installation of the outdoor type 132KV CVT’s, CT’s, Lightning
arrestors and other switchyard equipment.
Installation and maintenance of 110V, 48V, 30V DC battery cells, Charger sets.
Checking the condition and working of the 220KV, 132KV, 33KV GIS Equipment and
their pressure gauges as well as control panels.
Performing the Preventive Maintenance and services for the all electrical equipment &
preparing reports.
6 of 7
GVPR Engineers Limited, India (June’2009 to July’2011)