You are on page 1of 7

ELECTRICAL ENGINEER

Name: MAHESH BABU.DIVI

Education: Bachelor of technology in Electrical and


Electronics Engineering (2005-09)
Jawaharlal Nehru technological university, India.
Nationality: Indian
Having Valid GCC Driving License
Contact details +91-8977393495 (India & WhatsApp)
maheshbabudivi1@gmail.com

CAREER SUMMARY:

 A competent professional with 12 years of experience in project engineering &


management that comprises of 10 years’ experience in GCC electrical OHL&GS
transmission and distribution networks in varies roles of client’s resident engineer,
planning engineer cum project coordinator, site engineer & 1.5 years’ experience in
On shore petroleum and Gas project as a Senior field engineer.

 Been lead the site project team for a period of 1.2 years to complete 132KV OHL
construction project (80KM).

 Work experience includes 400 kV, 220kV & 132kV OHL Construction and 132KV GS
construction, 40 MVAR Reactors Bay Construction for 400KV GIS stations, 132kv &
33KV UG Cable laying, Cable Sealing End (CSE) connection with switchgear &
Substation Construction & Maintenance projects.

 Having working experience and knowledge of PDO, OETC projects (Oman) & Transco,
FEWA, DEWA, ADCO & Al Hosn Gas client’s (UAE) standards in GCC.

 Handful experience and knowledge in Tendering, Engineering, Procurement and


Construction of OHL/UG Cable/Grid Stations Transmission & Distribution Networks.
SKILLS:
 Computer skills – MS office
 MS – Project for planning
 Auto CAD
Few snaps from the executed projects

1 of 7
CAREER HISTORY:

Petrofac International Ltd (July’2019 to Feb’21)

Designation: Sr.Field Engineer - Electrical


Project – Marmul Polymer Phase-3, 875 Million USD (Approx.), PDO, Oman

Key elements of the Projects


 Construction of new Al-khalata 132kV/33kV GIS building with 2x75 MVA TX and
respective equipment installation.
 Construction of new DWD 33kV/6.6kV SS building with 2x16MVA TX and respective
equipment installation.
 Construction of 33kV Overhead line for the length of 99.8 KM.
 33kV cable laying activity in the field for well connection of the length approx. 75KM.

Responsibility and achievements


 On field queries resolution pertaining electrical and instrumentation inline with
project specification for speed project delivery support.
 Field project progress reporting the coastal office management team.
 Design documents review for scope changes for onward instructions to CC.
 Field survey for the location of 33kV electrical poles and field transformers locations
in support for the issuance of AFC documents for the project.
 Onsite engineering issues resolution for the smooth construction of project to meet in
time project milestones.
 Materials inspection for the quality issues along with the client team and materials
quality observations, NCR closeout resolutions.
 Materials procurement coordination for the project construction requirements.
 Weekly field engineering reports preparation.
 Coordination with PDO and construction contractor at the field, regarding the AFC
changes as per the site condition.
 Responsible for site RLMU documents register and further coordination with CC.
 Site coordination with client O&M team for the required support.

Monenco consulting Engineers (Jan’2018 to July’2019)

Designation: Resident Electrical Engineer


Project 1- Construction of New 132KV Double circuit Overhead lines from Rustaq-
Wadibani Auf- Nakhal along with a new 132/33 KV GS at Wadi Bani Auf
Project Value: 78 Million USD (Approx.), OETC, Oman.
Key elements of the Projects:
 Construction of new 132kV/33KV GIS with associated control, equipment
 Construction of new 132kV Overhead line for 80KM.
 Addition of 2No’s outdoor 132kV bays for the 132kV Rustaq grid station.
 Addition of 2No’s 132KV GIS bays at 132kV Nakhal grid station.
 132kV HV cable laying and terminations.

2 of 7
Project 2- Adding 132KV/33KV, 125 MVA third and fourth Transformers at Airport
heights grid stations.
Project Value: 25 Million USD (Approx.), OETC, Oman.
Key elements of the Projects:
 Installation of new 2x125MVA, 132kV/33KV transformers with necessary switchgear.
 Addition of 132kV GIS bays for the existing facility.
 Construction new 33kV Switchgear building with necessary control room and
equipment.
 132kV cable laying and terminations at CSE & GIS end.
 33kV capacitor banks installation.

Responsibility and achievements:

 Construction supervision for construction of new 132/33kV GIS station along with the
bay extensions for existing outdoor as well as GIS grid stations.
 Installation of 400KV, 132KV GIS equipment like circuit breakers, Isolator switches with
and without Earth switches, Current transformers and voltage transformers, 125 MVA
transformers, GIS Bus couplers and Bus sections.
 Extension of existing 132KV AIS & GIS bays and installation of respective switchgears
along with necessary gantry towers, HV cable laying, CSE, SA, CVT, CT, CB, Isolators
installation.
 2500 Sq.mm, 132KV cable laying between external gantry to GIS end and 800 Sq.mm
HV cable laying between GIS end to 125MVA Power transformers.
 Attending the witness for site equipment testing prior to the commissioning along with
the client’s Engineer.
 Checking the quality of works during and after completion of the project works.
 Issuing site Instructions to contractor for the NCR’s found during inspections.
 Receiving the RFIs from Contractor and clearing the same upon inspections in
reference to approved drawings and Project specifications.
 Lead snagging procedure to check electrical systems after substantial completion of
construction activities. Ensuring that a snag list is prepared based on outstanding
works and submitting to the client.
 Reviewing all as-built drawings provided by contractors prior to their submittal to
client for taking TOC/FAC.
 Managing the daily activities and performance of the Supervision team. Constant
liaisons with Client and contractor on project related matters.
 Support and report to the Project Manager on the monitoring of the site activities,
progress of works, coordination, and resolution of the site issues. Monitor the progress
report and provide assistance to the Project Manager in preparation of schedules for
submitting to client about project completion.
 Manage and monitor the relevant project information and documents related to
progress, issues, Non-conformities, correctives actions, reports and plans from the
contractor’s supervision team, provide approval towards the same.

3 of 7
Universal Consulting Engineers, Oman (Oct’2017 to Jan’2018)

Designation: Resident Electrical Engineer


Project 1- Construction of 400 KV GIS station along with 40 MVAR & 30 MVAR Reactors
and their Associated Works at IZKI.
Project Value: 15 Million USD (Approx.), OETC, Oman.
Key elements of the Projects:
 400KV, 40MVAR & 30MVAR reactors installation with necessary switchgear.

Responsibility and achievements:


 Construction Supervision for 40 MVAR, 30 MVAR Reactors and 400KV Compact Dead
Tank Circuit Breakers (DS+ES+CB – SF6 Gas Filled) along with Surge Arrestors.
 Installation of Fire Fighting system for GIS station as well as for Transformers,
Reactors.
 Installation of Control, Relay and Communication panels in CRP Room and Bay control
units (BCU).
 This is the first 400KV reactor project in the OMAN.

Gulfjyoti International LLC, Oman (Oct’2015 to Aug’2017)

Designation: Project coordinator & Planning Engineer


Project 1- Construction of 400 kV OHL Construction from IZKI to Misfa Grid stations.
Project Value: 52 Million USD (Approx.), OETC, Oman.
Key elements of the Projects:
 Installation of 400 OHL on steel lattice towers for a length of 96 KM.

Responsibility and achievements:


 Engineering & Design Co-ordination with In-house/Consultant/Manufacturer, 400 KV
towers and other materials, accessories & involving in design reviews.
 Providing the technical support to the Project Engineering and Procurement
department.
 Day wise coordination with the site CM for supervising and monitoring the site
manpower and subcontractors activities.
 Planning and submitting the outage plan for client, managing the execution of planned
schedule.
 Planning & preparing the working programs, work method statements, job risk
assessments and progress reports on daily basis.
 Preparation of Invoices/Bills and getting certified them through client’s Engineer
subsequently submitting to the client for payment.
 Studying the contract documents and drawings to know the requirements of the
project for smooth execution of site works.
 Responsible for the coordination of technical documents reply to the consultant in
respect to the project.
 Attending the client, consultant and internal meetings at main office as well as site
office and recording the minutes of meeting.
 Preparing the variation orders as per the project and client’s requirement.
 Maintaining the records of site Instruction notes, Non-conformance Register (NCR)

4 of 7
issuing by client and taking the appropriate action for the close of issues specified in
the given reports.
 Preparation of progress reports (Daily, Weekly & Monthly report) for client/Consultant
as well as for internal review.
 Project Cost Monitoring, Preparing project cash flow.
 Preparing & Analyzing the BOQ for OHL works.
 Preparation of POs/WOs for suppliers, subcontractors for site works.

National Contracting Company, UAE (July’2013 to Sep’2015)

Designation: Project coordinator & Contracts Engineer


Project 1- 33KV/11 KV GIS construction and 132KV GIS Modification works.
Project Value: 235 Million USD (Approx.), FEWA, UAE.
Key elements of the Projects:
33KV/11KV substations construction with all necessary equipment.
Responsibility and achievements:
 Collecting of Tender Documents (ITB) & Contract Packages in compliance Client’s
Standards.
 Preparation of Contract documents, amendments, variations in accordance with
approved company policy.
 Execution and distribution of contract documents to sub-contractors.
 Preparation of Technical documents comprising the pre-qualifications and presenting
the same to the client in power point presentations.
 Preparing and submitting the pretender clarification letters to client and responding
for the post tender clarifications issued from client.
 Interacting with the suppliers as well as subcontractors for the price negotiations
and technical queries clarifications.
 Establishing and maintaining an Approved Vendors list and a contracts database.
 Performing other similar duties such as providing administrative assistance to other
staff in contract related issues.
 Preparing and submission of technical and commercial bids for OHL & UG cable
tenders belongs to the clients in OMAN (OETC), UAE (ADCO, TRANSCO, DEWA, Al
HOSN GAS, MASDAR, AADC, etc.,), Egypt (EETC), Algeria (SONATRACH) and
Mauritania(SOMELEC).

Civil Contracting Company, Oman (July’2011 to July’2013)

Designation: Project Engineer


Project 1- Construction of 132 kV Grid stations along with OHL.
Project Value: 35 Million USD (Approx.), OETC, Oman.
Key elements of the Projects:
 132kV Overhead line construction on lattice steel towers– 83 KM
 Addition of 132kV bay for the existing switchgear – 8No’s
Responsibility and achievements:
 Material Inspection, Installation and Commissioning of - Power & Instrument

5 of 7
Transformer, Circuit Breaker – SF6, VCB, ACB, Disconnectors – With & Without Earth
Switch, Lightening Arresters, Power & Control Cables, Bus bar, Switchgear, MV & LV
Panels, Control & Relay Panels, DC Panel, MCC Panel & All Earthing System as per the
approved drawings and technical specifications.
 132kV OHL Steel towers erection of all the types, Conductor & OPGW stringing,
Sagging & installation of Accessories.
 132KV cable laying and Cable sealing End installation.
 132KV OHL Feeder control panel, Protection panel and telecom panel installation and
control cable laying.
 Managing the project during construction period and in warranty maintenance time.
 Performing the contract closeout and verifying the installed quantities to make it
certified by the client’s engineer for billing purpose.
 Maintaining the document register and proper records of checklists issuing to the
subcontractors as well as client consultant.
 Coordinating with the Client, consultant for the site inspections and completion of
site activities along with the site works supervision.
 Coordinating with third party organization for the splicing and OTDR test of the
OPGW and End to End test for the Conductor.
 Coordinating with the clients for the arrangement witness for the site tests and for
other necessary checking as a witness and getting their approvals.
 Preparing the Method Statements and Job Specific Risk assessments for the carrying
out works.
 Competent person certified from the Client to receive and Clearance of LOA, PTW
safety documents as per the site requirements.
 Measuring the Earth values of Towers, Equipment and making necessary rectifies.
 Responsible for Project Execution / control as per contract specification, designs and
engineering standards.
 Estimating required Electrical materials as per approved drawings, and BOQ
 Co-ordinate on-site activities to ensure smooth work progress and Co-ordinate with
various departments related to Electrical Construction ensures Safe Working
Environment and Snag free Operation.
 Maintenance and installation of the outdoor type 132KV CVT’s, CT’s, Lightning
arrestors and other switchyard equipment.
 Installation and maintenance of 110V, 48V, 30V DC battery cells, Charger sets.
 Checking the condition and working of the 220KV, 132KV, 33KV GIS Equipment and
their pressure gauges as well as control panels.
 Performing the Preventive Maintenance and services for the all electrical equipment &
preparing reports.

6 of 7
GVPR Engineers Limited, India (June’2009 to July’2011)

Designation: Project Engineer


Project 1- Construction of 33/11KV Substations & UG Cable laying works.
Project Value: 40 Million USD (Approx.), MSEDCL, India.

Key elements of the Projects:


 33kV/11kV substation construction – 1No.
 33KV UG cable laying – 200 KM & OHL construction – 100 KM
Responsibility and achievements:
 Construction of 33/11KV Grid station with 2*10 MVA step-down transformers with
all the required outdoor switchgears, CRP Room (Equipped with Control, Relay,
Telecom Panels, Etc.), LVAC System, Battery Room, etc.
 33KV cable laying and terminations installation.
 Managing the project during construction period and in warranty maintenance
time.
 Performing the contract closeout and verifying the installed quantities to make it
certified by the client’s engineer for billing purpose.
 Coordinating with the clients for the arrangement witness for the site tests and for
other necessary checking as a witness and getting their approvals.
 Measuring the Earth values for the substation and earth mat laying.
 Responsible for Project Execution / control as per contract specification, designs
and engineering standards.
 Estimating required Electrical materials as per approved drawings, and BOQ
 Monitor the daily progress of work to Control the various expenses in Electrical
activities so as to meet the approved Budget.

7 of 7

You might also like