Professional Documents
Culture Documents
DIMENSIONS
LxWxH (mm)
WEIGHT
(kg)
7265
EXAM ROOM HEIGHT
FINISHED FLOOR TO SLAB HEIGHT -
FALSE CEILING HEIGHT 2.80 m
9
8 2-154
1065
1065
EXAM ROOM APPLICATIONS
29.26 m²
2-154A The chart shows the applications possible to perform with the present equipment positioning,
DRESSING ROOM however the sales contract may not include all of them.
2 1
Auto Image Pasting at Wall Stand YES
303
1850 Auto Image Pasting at Table NO
Note A Dual Energy Substruction YES
4591
VolumeRAD
4 Vertical at Wall stand NO
2-154C
CONTROL Cross-Table at Wall stand NO
ROOM
Horizontal at Table NO
2720
3.46 m²
2-154B
2168
TECH
AL-MUBARRAZ
11 SAUDI ARABIA
Imad Saleh
5 6 7
3200 GE Healthcare +966 500612562
5443 1650 Imad.saleh@ge.com
OPTIMA XR 646
PRELIMINARY STUDY
2-142 2-141B 2-155
ORTH PHYSICIAN ORTHO COORDINATOR PEDS CAST ROOM
EXAM ROOM
NOTE
In case of using air conditioning systems that have a risk of water leakage it is recommended not to install it above electric equipment or to
take measures to protect the equipment from dropping water.
DELIVERY DISCLAIMER
THE CUSTOMER/CONTRACTOR SHOULD: This drawing is a preliminary drawing. Site conditions and/or equipment configuration may have a significant
impact on room layout and site preparation. Final study must be done before installation of the GE equipment. GE
· Provide an area adjacent to the installation site for delivery and unloading of the GE equipment. cannot accept any responsibility for errors due to lack of information.
· Ensure that the dimensions of all doors, corridors, ceiling heights are sufficient to accommodate the
movement of GE equipment from the delivery area into the definitive installation room. The room dimensions used to create the equipment layout may originate from a previous layout and may not be
· Ensure that access routes for equipment will accommodate the weights of the equipment and any accurate as they may not have been verified on site. GE cannot take any responsibility for errors due to lack of
transportation, lifting and rigging equipment. information.
· Ensure that all necessary arrangements for stopping and unloading on public or private property not
belonging to the customer have been made. It is the responsibility of the customer to prepare the site in accordance with the specifications stated in the final
drawings. These drawings are not to be used for actual construction purposes. The company cannot take
responsibility for any damage resulting therefrom.
DIMENSIONS OF DELIVERY IN TRANSIT The customer must ensure the floor strength is sufficient to support the fixings as required. A qualified structural
engineer must be consulted and all work carried out according to his specifications.
EQUIPMENT DIMENSIONS WEIGHT
LENGTH 2111 mm 83.1 in Suitable radiological protection must be determined by a qualified radiological physicist in conformation with local
270 kg + 596 lbs + regulations. GE does not take responsibility for the specification or provision of radio-protection.
STANDARD WALLSTAND WIDTH 911 mm 35.9 in
fixture fixture
HEIGHT 1860 mm 73.2 in
LENGTH 2400 mm 94.5 in
G2 TABLE WIDTH 940 mm 37 in 440 kg + dolly 970 lbs + dolly
HEIGHT 800 mm 31.5 in THE UNDERSIGNED, HEREBY CERTIFIES THAT I HAVE READ AND APPROVED THE PLANS IN THIS DOCUMENT.
AL MOOSA SPECIALIST HOSPITAL OPTIMA XR 646 RAD-B163865-PRE-00.DWG 1:50 Rev A Date 19/DEC/2019 Details 02/02