You are on page 1of 2

ER – 2018 Edition CPD-POA-F001

Rev. 1/08-10-18

Engineering Report
For
Generator Set
GENERAL INFORMATION
Name of Firm/ Establishment:
Plant Address/Location :
Nature of Business :
Average Hrs/day Days/week
Business Operation :
Maximum Hrs/day Days/week
FUEL BURNING STATIONARY SOURCE INSTALLATIONS
Standby Generator Set
ENGINE SPECIFICATIONS
Brand Name
Model
Engine Serial No.
Maximum Mechanical Horsepower
Type of Fuel
Fuel Consumption Rate , Li/Hr.
No. of Hrs. of Operation/Year
No. of Cylinders
Corresponding Air Pollution Control Device
ALTERNATOR SPECIFICATIONS
Brand Name
Model No.
Capacity , KVA
Phase (Optional)
Voltage (Optional)
Frequency (Optional)
Power Factor/ Cos  (Optional)
CERTIFICATION

This is to certify that all the information given above are true, accurate and complete. Should I / we learn if any
information which would make this Engineering Report inaccurate, I / we should bring said information to the attention of
the Environmental Management Bureau Regional Office.

Preparer
(Mechanical Engineer)
Attested by:

Managing Head/Owner

SUBSCRIBED AND SWORN TO before me this _______day of _____________,


at________________________, Philippines.

Requirements for Generator Set


ER – 2018 Edition CPD-POA-F001
Rev. 1/08-10-18

1. Letter request address to the Regional Director (ENGR. MARIA DORICA NAZ-HIPE)
2. Application Form
3. Engineering Report prepared, signed and sealed by a Mechanical Engineer with
Photocopy of PRC ID and Managing Head/ Owner and duly notarized.
4. Emission Computation
5. Pictures of air pollution source and control installations (specifically nameplate of engine
and alternator)
6. Certificate of Registration Issued by the SEC or DTI
7. Vicinity map identifying the address, location of the plant premises
Geo-Tagged Pictures of the Site and Equipment
Site Development Plan
8. Pollution Control Officer (PCO) appointment/ Copy of Certificate PCO Accreditation
9. Filing Fee : P640.00

Requirements for Generator Set Amendment


1. Letter request address to the Regional Director (ENGR. MARIA DORICA NAZ-HIPE)
2. Application Form
3. Engineering Report prepared, signed and sealed by a Mechanical Engineer with
Photocopy of PRC ID and Managing Head/ Owner and duly notarized.
4. Emission Computation
5. Pictures of air pollution source and control installations (specifically nameplate of engine
and alternator)
6. Vicinity map identifying the address, location of the plant premises
Geo-Tagged Pictures of the Site and Equipment
Site Development Plan
7. Pollution Control Officer (PCO) appointment/ Copy of Certificate PCO Accreditation
8. Filing Fee : P640.00

You might also like