You are on page 1of 2
i Name, Signature, & Date Contractor! GMCPMI Wi ive RESIDENCES i ‘GRIDLINES Ref. No. P20030- GMCPMPRFIO025-21 REQUEST FOR INFORMATION ProjectName —_| Gem Residences Location fC ae ne 9 Brov. Ucona Pasia City | Contract ‘Specifications Package _| Reference Drawing Contractor | All Trades bebe FCD Requested by tyke Jane D. Cescey Received by Name, Signature, & Date ‘GMCPMV Designer CMIPM: Gridlines MGS Construction and Project Management In. Designer/Consultant: ASYA Design / RBS Consulting Engineers Clarification/Request: detail of pre-cast wall with grooves Description: 1. Detail or blow-up detail of pre-cast wall with grooves @ residential units beside louver of ACCU ledge? Yes Remarks With Cost implication? ‘With Time implication? ojo ojo] s| Response/Attachment: Date Responded By Designer: Name and Signature: Date by which information is required: Date Received by PMG “Date Received by Contractor if you consider that a change in the Contract Amount or Contract Time is required, notify the Project Management Group within 48 hours from your receipt of the above response and prior to your proceeding with ‘affected work. Submit a Change Order Proposal to the Project Management Group within seven (7) days from ‘your notification, Distribution: a pm F-OPS-007-1 EFF: 02/10/21 o cM OWNER 1 CONTRACTOR Page 1 of 2 QO OTHERS: a» Tov 4 GE RESIDENCES Seer | kati il Tease VENTILATION €AP Tat, TEE Tewrene boas. g (Weriry coven) on ERY zg z a RUBEP- |-+. § GROOVE LINES Mi . STOUERIG PART Window schedule F-OPS.007-1 EFF: 02/10/21 —_

You might also like