1.

Breasting Dolphin

Design Load = 100 ton


Estimated Penetration Depth = 12m
OD = 0.711
t= 0.012
ID = 0.687
Apile = 0.0264 m2
sall = 0.55 x fy 1320 kg/cm2 = 132,000 kN/m2
fy = 2400 kg/cm2
240,000 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h    
 SC   Wr  Wp 

Hiley
S
S (cm/10 (cm/blows 1/S
No. Hammer Length (m) Eh Wr (kips) Wp (kN) Wp (kips) h (inc) blows) ) S (inc/blows) C n Pu (kips) Pu (kN) Pd (kN) SF=3.0 Pd (ton) SF=3.0 (blows/cm)
0 0 0
1 NH70 36 0.8 15.736 74.470 16.74 47.244 12 1.2 0.47244 0.1 0.5 637 2835 944.90 94.49 0.833333333
2 36 0.8 15.736 74.470 16.74 47.244 9 0.9 0.35433 0.1 0.5 803 3572 1,190.54 119.05 1.111111111
3 36 0.8 15.736 74.470 16.74 47.244 8 0.8 0.31496 0.1 0.5 879 3910 1,303.50 130.35 1.25
4 36 0.8 15.736 74.470 16.74 47.244 7 0.7 0.27559 0.1 0.5 971 4320 1,440.13 144.01 1.428571429
5 36 0.8 15.736 74.470 16.74 47.244 6 0.6 0.23622 0.1 0.5 1085 4826 1,608.77 160.88 1.666666667
6 36 0.8 15.736 74.470 16.74 47.244 5 0.5 0.19685 0.1 0.5 1229 5466 1,822.13 182.21 2
7 36 0.8 15.736 74.470 16.74 47.244 4 0.4 0.15748 0.1 0.5 1417 6302 2,100.74 210.07 2.5
8 36 0.8 15.736 74.470 16.74 47.244 3 0.3 0.11811 0.1 0.5 1673 7440 2,479.94 247.99 3.333333333
9 36 0.8 15.736 74.470 16.74 47.244 2.5 0.25 0.098425 0.1 0.5 1839 8178 2,725.96 272.60 4
10 36 0.8 15.736 74.470 16.74 47.244 1 0.1 0.03937 0.1 0.5 2618 11643 3,881.03 388.10 10
11 36 0.8 15.736 74.470 16.74 47.244 0.5 0.05 0.019685 0.1 0.5 3048 13558 4,519.36 451.94 20
12 36 0.8 15.736 74.470 16.74 47.244 0.25 0.025 0.0098425 0.1 0.5 3321 14773 4,924.32 492.43 40
13 36 0.8 15.736 74.470 16.74 47.244 0.15 0.015 0.0059055 0.1 0.5 3445 15322 5,107.38 510.74 66.66666667
14 36 0.8 15.736 74.470 16.74 47.244 0.1 0.01 0.003937 0.1 0.5 3510 15612 5,204.11 520.41 100
15 36 0.8 15.736 74.470 16.74 47.244 0.05 0.005 0.0019685 0.1 0.5 3578 15914 5,304.57 530.46 200
16 36 0.8 15.736 74.470 16.74 47.244 0.04 0.004 0.0015748 0.1 0.5 3592 15975 5,325.14 532.51 250

2. Control Room Platform

Design Load = 40 ton


Estimated Penetration Depth = 9m
OD = 0.6
t= 0.1
ID = 0.4
Apile = 0.1571 m2

558630471.xls Calc 1
Apile = 0.0264 m2
sall = 0.55 x fy 1320 kg/cm2 = 132,000 kN/m2
fy = 2400 kg/cm2
240,000 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h   
 SC   Wr  Wp 

sall = 0.6 x( f'c ) 29880 kN/m2


fc = 498 kg/cm2
49,800 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h   
 SC   Wr  Wp 
Modified Hiley
S
S (cm/10 (cm/blows 1/S
No. Hammer Length (m) Eh Wr (kips) Wp (kN) Wp (kips) h (inc) blows) ) S (inc/blows) C n Pu (kips) Pu (kN) Pd (kN) SF=3.0 Pd (ton) SF=3.0 (blows/cm)
0 0 0
1 NH70 36 0.8 15.736 135.717 30.51 47.244 12 1.2 0.47244 0.1 0.5 525 2335 778.24 77.82 0.833333333
2 36 0.8 15.736 135.717 30.51 47.244 9 0.9 0.35433 0.1 0.5 661 2942 980.55 98.06 1.111111111
3 36 0.8 15.736 135.717 30.51 47.244 8 0.8 0.31496 0.1 0.5 724 3221 1,073.58 107.36 1.25
4 36 0.8 15.736 135.717 30.51 47.244 7 0.7 0.27559 0.1 0.5 800 3558 1,186.12 118.61 1.428571429
5 36 0.8 15.736 135.717 30.51 47.244 6 0.6 0.23622 0.1 0.5 894 3975 1,325.01 132.50 1.666666667
6 36 0.8 15.736 135.717 30.51 47.244 5 0.5 0.19685 0.1 0.5 1012 4502 1,500.74 150.07 2
7 36 0.8 15.736 135.717 30.51 47.244 4 0.4 0.15748 0.1 0.5 1167 5191 1,730.21 173.02 2.5
8 36 0.8 15.736 135.717 30.51 47.244 3 0.3 0.11811 0.1 0.5 1378 6128 2,042.52 204.25 3.333333333
9 36 0.8 15.736 135.717 30.51 47.244 2.5 0.25 0.098425 0.1 0.5 1514 6735 2,245.15 224.52 4
10 36 0.8 15.736 135.717 30.51 47.244 1.1 0.11 0.043307 0.1 0.5 2097 9326 3,108.67 310.87 9.090909091
11 36 0.8 15.736 135.717 30.51 47.244 0.5 0.05 0.019685 0.1 0.5 2510 11167 3,722.22 372.22 20
12 36 0.8 15.736 135.717 30.51 47.244 0.25 0.025 0.0098425 0.1 0.5 2735 12167 4,055.76 405.58 40
13 36 0.8 15.736 135.717 30.51 47.244 0.15 0.015 0.0059055 0.1 0.5 2837 12620 4,206.53 420.65 66.66666667
14 36 0.8 15.736 135.717 30.51 47.244 0.1 0.01 0.003937 0.1 0.5 2891 12859 4,286.20 428.62 100
15 36 0.8 15.736 135.717 30.51 47.244 0.05 0.005 0.0019685 0.1 0.5 2947 13107 4,368.94 436.89 200
16 36 0.8 15.736 135.717 30.51 47.244 0.04 0.004 0.0015748 0.1 0.5 2958 13158 4,385.88 438.59 250

3. Mooring Dolphin

Design Load = 80 ton


Estimated Penetration Depth = 12m
OD = 0.7112
t= 0.012
ID = 0.6872
Apile = 0.0264 m2

558630471.xls Calc 2
Apile = 0.0264 m2
sall = 0.55 x fy 1320 kg/cm2 = 132,000 kN/m2
fy = 2400 kg/cm2
240,000 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h   
 SC   Wr  Wp 

sall = 0.55 x f'c 1320 kg/cm2 = 132,000 kN/m2


fy = 2400 kg/cm2
240,000 kN/m2

 e  Wr  h   Wr  n Wp 
2

Pu   h    
 SC   Wr  Wp 

Modified Hiley
S
S (cm/10 (cm/blows 1/S
No. Hammer Length (m) Eh Wr (kips) Wp (kN) Wp (kips) h (inc) blows) ) S (inc/blows) C n Pu (kips) Pu (kN) Pd (kN) SF=3.0 Pd (ton) SF=3.0 (blows/cm)
0 0 0
1 NH70 36 0.8 15.736 74.491 16.75 47.244 12 1.2 0.47244 0.1 0.5 637 2834 944.82 94.48 0.833333333
2 36 0.8 15.736 74.491 16.75 47.244 9 0.9 0.35433 0.1 0.5 803 3571 1,190.44 119.04 1.111111111
3 36 0.8 15.736 74.491 16.75 47.244 8 0.8 0.31496 0.1 0.5 879 3910 1,303.38 130.34 1.25
4 36 0.8 15.736 74.491 16.75 47.244 7 0.7 0.27559 0.1 0.5 971 4320 1,440.01 144.00 1.428571429
5 36 0.8 15.736 74.491 16.75 47.244 6 0.6 0.23622 0.1 0.5 1085 4826 1,608.63 160.86 1.666666667
6 36 0.8 15.736 74.491 16.75 47.244 5 0.5 0.19685 0.1 0.5 1229 5466 1,821.97 182.20 2
7 36 0.8 15.736 74.491 16.75 47.244 4 0.4 0.15748 0.1 0.5 1417 6302 2,100.56 210.06 2.5
8 36 0.8 15.736 74.491 16.75 47.244 3 0.3 0.11811 0.1 0.5 1672 7439 2,479.72 247.97 3.333333333
9 36 0.8 15.736 74.491 16.75 47.244 2.5 0.25 0.098425 0.1 0.5 1838 8177 2,725.73 272.57 4
10 36 0.8 15.736 74.491 16.75 47.244 1 0.1 0.03937 0.1 0.5 2617 11642 3,880.69 388.07 10
11 36 0.8 15.736 74.491 16.75 47.244 0.5 0.05 0.019685 0.1 0.5 3048 13557 4,518.96 451.90 20
12 36 0.8 15.736 74.491 16.75 47.244 0.25 0.025 0.0098425 0.1 0.5 3321 14772 4,923.89 492.39 40
13 36 0.8 15.736 74.491 16.75 47.244 0.15 0.015 0.0059055 0.1 0.5 3444 15321 5,106.93 510.69 66.66666667
14 36 0.8 15.736 74.491 16.75 47.244 0.1 0.01 0.003937 0.1 0.5 3510 15611 5,203.65 520.37 100
15 36 0.8 15.736 74.491 16.75 47.244 0.05 0.005 0.0019685 0.1 0.5 3577 15912 5,304.11 530.41 200
16 36 0.8 15.736 74.491 16.75 47.244 0.04 0.004 0.0015748 0.1 0.5 3591 15974 5,324.67 532.47 250

4. Platform

Design Load = 80 ton


Estimated Penetration Depth = 9m
OD = 0.6
t= 0.1
ID = 0.4

558630471.xls Calc 3
Apile = 0.0264 m2
sall = 0.55 x fy 1320 kg/cm2 = 132,000 kN/m2
fy = 2400 kg/cm2
240,000 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h   
 SC   Wr  Wp 

Apile = 0.1571 m2
sall = 0.6 x( f'c ) 29880 kN/m2
fc = 498 kg/cm2
49,800 kN/m2

 e  Wr  h   Wr  n Wp 
2

Pu   h    
 SC   Wr  Wp 
Modified Hiley
S
S (cm/10 (cm/blows 1/S
No. Hammer Length (m) Eh Wr (kips) Wp (kN) Wp (kips) h (inc) blows) ) S (inc/blows) C n Pu (kips) Pu (kN) Pd (kN) SF=3.0 Pd (ton) SF=3.0 (blows/cm)
0 0 0
1 NH70 36 0.8 15.736 135.717 30.51 47.244 12 1.2 0.47244 0.1 0.5 525 2335 778.24 77.82 0.833333333
2 36 0.8 15.736 135.717 30.51 47.244 9 0.9 0.35433 0.1 0.5 661 2942 980.55 98.06 1.111111111
3 36 0.8 15.736 135.717 30.51 47.244 8 0.8 0.31496 0.1 0.5 724 3221 1,073.58 107.36 1.25
4 36 0.8 15.736 135.717 30.51 47.244 7 0.7 0.27559 0.1 0.5 800 3558 1,186.12 118.61 1.428571429
5 36 0.8 15.736 135.717 30.51 47.244 6 0.6 0.23622 0.1 0.5 894 3975 1,325.01 132.50 1.666666667
6 36 0.8 15.736 135.717 30.51 47.244 5 0.5 0.19685 0.1 0.5 1012 4502 1,500.74 150.07 2
7 36 0.8 15.736 135.717 30.51 47.244 4 0.4 0.15748 0.1 0.5 1167 5191 1,730.21 173.02 2.5
8 36 0.8 15.736 135.717 30.51 47.244 3 0.3 0.11811 0.1 0.5 1378 6128 2,042.52 204.25 3.333333333
9 36 0.8 15.736 135.717 30.51 47.244 2.5 0.25 0.098425 0.1 0.5 1514 6735 2,245.15 224.52 4
10 36 0.8 15.736 135.717 30.51 47.244 1 0.1 0.03937 0.1 0.5 2156 9589 3,196.49 319.65 10
11 36 0.8 15.736 135.717 30.51 47.244 0.5 0.05 0.019685 0.1 0.5 2510 11167 3,722.22 372.22 20
12 36 0.8 15.736 135.717 30.51 47.244 0.25 0.025 0.0098425 0.1 0.5 2735 12167 4,055.76 405.58 40
13 36 0.8 15.736 135.717 30.51 47.244 0.15 0.015 0.0059055 0.1 0.5 2837 12620 4,206.53 420.65 66.66666667
14 36 0.8 15.736 135.717 30.51 47.244 0.1 0.01 0.003937 0.1 0.5 2891 12859 4,286.20 428.62 100
15 36 0.8 15.736 135.717 30.51 47.244 0.05 0.005 0.0019685 0.1 0.5 2947 13107 4,368.94 436.89 200
16 36 0.8 15.736 135.717 30.51 47.244 0.04 0.004 0.0015748 0.1 0.5 2958 13158 4,385.88 438.59 250

5. Walkway

Design Load = 40 ton


Estimated Penetration Depth = 9m
OD = 0.6
t= 0.1
ID = 0.4

558630471.xls Calc 4
Apile = 0.0264 m2
sall = 0.55 x fy 1320 kg/cm2 = 132,000 kN/m2
fy = 2400 kg/cm2
240,000 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h   
 SC   Wr  Wp 

Apile = 0.1571 m2
sall = 0.6 x( f'c ) 29880 kN/m2
fc = 498 kg/cm2
49,800 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h    
 SC   Wr  Wp 

Modified Hiley
S
S (cm/10 (cm/blows 1/S
No. Hammer Length (m) Eh Wr (kips) Wp (kN) Wp (kips) h (inc) blows) ) S (inc/blows) C n Pu (kips) Pu (kN) Pd (kN) SF=3.0 Pd (ton) SF=3.0 (blows/cm)
0 0 0
1 NH70 36 0.8 15.736 135.717 30.51 47.244 12 1.2 0.47244 0.1 0.5 525 2335 778.24 77.82 0.833333333
2 36 0.8 15.736 135.717 30.51 47.244 9 0.9 0.35433 0.1 0.5 661 2942 980.55 98.06 1.111111111
3 36 0.8 15.736 135.717 30.51 47.244 8 0.8 0.31496 0.1 0.5 724 3221 1,073.58 107.36 1.25
4 36 0.8 15.736 135.717 30.51 47.244 7 0.7 0.27559 0.1 0.5 800 3558 1,186.12 118.61 1.428571429
5 36 0.8 15.736 135.717 30.51 47.244 6 0.6 0.23622 0.1 0.5 894 3975 1,325.01 132.50 1.666666667
6 36 0.8 15.736 135.717 30.51 47.244 5 0.5 0.19685 0.1 0.5 1012 4502 1,500.74 150.07 2
7 36 0.8 15.736 135.717 30.51 47.244 4 0.4 0.15748 0.1 0.5 1167 5191 1,730.21 173.02 2.5
8 36 0.8 15.736 135.717 30.51 47.244 3 0.3 0.11811 0.1 0.5 1378 6128 2,042.52 204.25 3.333333333
9 36 0.8 15.736 135.717 30.51 47.244 2.5 0.25 0.098425 0.1 0.5 1514 6735 2,245.15 224.52 4
10 36 0.8 15.736 135.717 30.51 47.244 1 0.1 0.03937 0.1 0.5 2156 9589 3,196.49 319.65 10
11 36 0.8 15.736 135.717 30.51 47.244 0.5 0.05 0.019685 0.1 0.5 2510 11167 3,722.22 372.22 20
12 36 0.8 15.736 135.717 30.51 47.244 0.25 0.025 0.0098425 0.1 0.5 2735 12167 4,055.76 405.58 40
13 36 0.8 15.736 135.717 30.51 47.244 0.15 0.015 0.0059055 0.1 0.5 2837 12620 4,206.53 420.65 66.66666667
14 36 0.8 15.736 135.717 30.51 47.244 0.1 0.01 0.003937 0.1 0.5 2891 12859 4,286.20 428.62 100
15 36 0.8 15.736 135.717 30.51 47.244 0.05 0.005 0.0019685 0.1 0.5 2947 13107 4,368.94 436.89 200
16 36 0.8 15.736 135.717 30.51 47.244 0.04 0.004 0.0015748 0.1 0.5 2958 13158 4,385.88 438.59 250

6. Catwalk

Design Load = 40 ton


Estimated Penetration Depth = 9m
OD = 0.6
t= 0.1
ID = 0.4

558630471.xls Calc 5
Apile = 0.0264 m2
sall = 0.55 x fy 1320 kg/cm2 = 132,000 kN/m2
fy = 2400 kg/cm2
240,000 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h   
 SC   Wr  Wp 

Apile = 0.1571 m2
sall = 0.6 x( f'c ) 29880 kN/m2
fc = 498 kg/cm2
49,800 kN/m2

 e h  Wr  h   Wr  n Wp 
2

Pu    W  W 
 SC   r p 

Modified Hiley
S
S (cm/10 (cm/blows 1/S
No. Hammer Length (m) Eh Wr (kips) Wp (kN) Wp (kips) h (inc) blows) ) S (inc/blows) C n Pu (kips) Pu (kN) Pd (kN) SF=3.0 Pd (ton) SF=3.0 (blows/cm)
0 0 0
1 NH70 36 0.8 15.736 135.717 30.51 47.244 12 1.2 0.47244 0.1 0.5 525 2335 778.24 77.82 0.833333333
2 36 0.8 15.736 135.717 30.51 47.244 9 0.9 0.35433 0.1 0.5 661 2942 980.55 98.06 1.111111111
3 36 0.8 15.736 135.717 30.51 47.244 8 0.8 0.31496 0.1 0.5 724 3221 1,073.58 107.36 1.25
4 36 0.8 15.736 135.717 30.51 47.244 7 0.7 0.27559 0.1 0.5 800 3558 1,186.12 118.61 1.428571429
5 36 0.8 15.736 135.717 30.51 47.244 6 0.6 0.23622 0.1 0.5 894 3975 1,325.01 132.50 1.666666667
6 36 0.8 15.736 135.717 30.51 47.244 5 0.5 0.19685 0.1 0.5 1012 4502 1,500.74 150.07 2
7 36 0.8 15.736 135.717 30.51 47.244 4 0.4 0.15748 0.1 0.5 1167 5191 1,730.21 173.02 2.5
8 36 0.8 15.736 135.717 30.51 47.244 3 0.3 0.11811 0.1 0.5 1378 6128 2,042.52 204.25 3.333333333
9 36 0.8 15.736 135.717 30.51 47.244 2.5 0.25 0.098425 0.1 0.5 1514 6735 2,245.15 224.52 4
10 36 0.8 15.736 135.717 30.51 47.244 1 0.1 0.03937 0.1 0.5 2156 9589 3,196.49 319.65 10
11 36 0.8 15.736 135.717 30.51 47.244 0.5 0.05 0.019685 0.1 0.5 2510 11167 3,722.22 372.22 20
12 36 0.8 15.736 135.717 30.51 47.244 0.25 0.025 0.0098425 0.1 0.5 2735 12167 4,055.76 405.58 40
13 36 0.8 15.736 135.717 30.51 47.244 0.15 0.015 0.0059055 0.1 0.5 2837 12620 4,206.53 420.65 66.66666667
14 36 0.8 15.736 135.717 30.51 47.244 0.1 0.01 0.003937 0.1 0.5 2891 12859 4,286.20 428.62 100
15 36 0.8 15.736 135.717 30.51 47.244 0.05 0.005 0.0019685 0.1 0.5 2947 13107 4,368.94 436.89 200
16 36 0.8 15.736 135.717 30.51 47.244 0.04 0.004 0.0015748 0.1 0.5 2958 13158 4,385.88 438.59 250

558630471.xls Calc 6
Stress
Remark
(kN/m2)

0
35,857
45,179
49,465 Ok!
54,651
61,050
69,147
79,720
94,109
103,446 Kriteria Standar Pemancangan
147,278
171,502
186,869
193,816
197,487
201,299
202,080

558630471.xls Calc 7
Stress
Remark
(kN/m2)

0
4,954 Ok!
6,242
6,835
7,551
8,435
9,554
11,015
13,003
14,293 Kriteria Standar Pemancangan
19,790
23,696
25,820
26,780
27,287
27,814
27,921

558630471.xls Calc 8
Stress
Remark
(kN/m2)

0
35,844 Ok!
45,162
49,447
54,630
61,027
69,121
79,690
94,074
103,407 Kriteria Standar Pemancangan
147,223
171,438
186,800
193,744
197,413
201,224
202,004

558630471.xls Calc 9
Stress
Remark
(kN/m2)

0
4,954 Ok!
6,242
6,835
7,551
8,435
9,554
11,015
13,003
14,293 Kriteria Standar Pemancangan
20,349
23,696
25,820
26,780
27,287
27,814
27,921

558630471.xls Calc 10
Stress
Remark
(kN/m2)

0
4,954 OK!
6,242
6,835
7,551
8,435
9,554
11,015
13,003
14,293 Kriteria Standar Pemancangan
20,349
23,696
25,820
26,780
27,287
27,814
27,921

558630471.xls Calc 11
Stress
Remark
(kN/m2)

0
4,954 OK!
6,242
6,835
7,551
8,435
9,554
11,015
13,003
14,293 Kriteria Standar Pemancangan
20,349
23,696
25,820
26,780
27,287
27,814
27,921

558630471.xls Calc 12
1. Trestle - CSP 600

Design Load = 170 ton


Estimated Penetration Depth = 9m
OD = 0.6
t= 0.1
ID = 0.4
Apile = 0.1571 m2
sall = 0.6 x( f'c ) 29880 kN/m2
fc = 498 kg/cm2
49,800 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h    
 SC   Wr  Wp 

Hiley
S
S (cm/10 (cm/blows 1/S
No. Hammer Length (m) Eh Wr (kips) Wp (kN) Wp (kips) h (inc) blows) ) S (inc/blows) C n Pu (kips) Pu (kN) Pd (kN) SF=3.0 Pd (ton) SF=3.0 (blows/cm)
0 0 0
1 NH70 36 0.8 15.736 135.717 30.51 47.244 12 1.2 0.47244 0.1 0.5 525 2335 778.24 77.82 0.833333333
2 36 0.8 15.736 135.717 30.51 47.244 9 0.9 0.35433 0.1 0.5 661 2942 980.55 98.06 1.111111111
3 36 0.8 15.736 135.717 30.51 47.244 8 0.8 0.31496 0.1 0.5 724 3221 1,073.58 107.36 1.25
4 36 0.8 15.736 135.717 30.51 47.244 7 0.7 0.27559 0.1 0.5 800 3558 1,186.12 118.61 1.428571429
5 36 0.8 15.736 135.717 30.51 47.244 6 0.6 0.23622 0.1 0.5 894 3975 1,325.01 132.50 1.666666667
6 36 0.8 15.736 135.717 30.51 47.244 5 0.5 0.19685 0.1 0.5 1012 4502 1,500.74 150.07 2
7 36 0.8 15.736 135.717 30.51 47.244 4 0.4 0.15748 0.1 0.5 1167 5191 1,730.21 173.02 2.5
8 36 0.8 15.736 135.717 30.51 47.244 3 0.3 0.11811 0.1 0.5 1378 6128 2,042.52 204.25 3.333333333
9 36 0.8 15.736 135.717 30.51 47.244 2.5 0.25 0.098425 0.1 0.5 1514 6735 2,245.15 224.52 4
10 36 0.8 15.736 135.717 30.51 47.244 1.1 0.11 0.043307 0.1 0.5 2097 9326 3,108.67 310.87 9.090909091
11 36 0.8 15.736 135.717 30.51 47.244 0.5 0.05 0.019685 0.1 0.5 2510 11167 3,722.22 372.22 20
12 36 0.8 15.736 135.717 30.51 47.244 0.25 0.025 0.0098425 0.1 0.5 2735 12167 4,055.76 405.58 40
13 36 0.8 15.736 135.717 30.51 47.244 0.15 0.015 0.0059055 0.1 0.5 2837 12620 4,206.53 420.65 66.66666667
14 36 0.8 15.736 135.717 30.51 47.244 0.1 0.01 0.003937 0.1 0.5 2891 12859 4,286.20 428.62 100
15 36 0.8 15.736 135.717 30.51 47.244 0.05 0.005 0.0019685 0.1 0.5 2947 13107 4,368.94 436.89 200
16 36 0.8 15.736 135.717 30.51 47.244 0.04 0.004 0.0015748 0.1 0.5 2958 13158 4,385.88 438.59 250

Modified Hiley
S
S (cm/10 (cm/blows 1/S
No. Hammer Length (m) Eh Wr (kips) Wp (kN) Wp (kips) h (inc) blows) ) S (inc/blows) C n Pu (kips) Pu (kN) Pd (kN) SF=3.0 Pd (ton) SF=3.0 (blows/cm)
0 0 0
1 HH16 36 0.8 35.968 135.717 30.51 47.244 12 1.2 0.47244 0.1 0.5 1557 6927 2,309.05 230.91 0.833333333
2 36 0.8 35.968 135.717 30.51 47.244 9 0.9 0.35433 0.1 0.5 1962 8728 2,909.33 290.93 1.111111111
3 36 0.8 35.968 135.717 30.51 47.244 8 0.8 0.31496 0.1 0.5 2148 9556 3,185.35 318.54 1.25

558630471.xls TRSTL-CSP 13
Apile = 0.1571 m2
sall = 0.6 x( f'c ) 29880 kN/m2
fc = 498 kg/cm2
49,800 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h   
 SC   Wr  Wp 

4 36 0.8 35.968 135.717 30.51 47.244 7 0.7 0.27559 0.1 0.5 2374 10558 3,519.25 351.92 1.428571429
5 36 0.8 35.968 135.717 30.51 47.244 6 0.6 0.23622 0.1 0.5 2652 11794 3,931.34 393.13 1.666666667
6 36 0.8 35.968 135.717 30.51 47.244 5 0.5 0.19685 0.1 0.5 3003 13358 4,452.73 445.27 2
7 36 0.8 35.968 135.717 30.51 47.244 4 0.4 0.15748 0.1 0.5 3462 15401 5,133.58 513.36 2.5
8 36 0.8 35.968 135.717 30.51 47.244 3 0.3 0.11811 0.1 0.5 4087 18181 6,060.22 606.02 3.333333333
9 36 0.8 35.968 135.717 30.51 47.244 2 0.2 0.07874 0.1 0.5 4988 22185 7,395.06 739.51 5
10 36 0.8 35.968 135.717 30.51 47.244 1.1 0.11 0.043307 0.1 0.5 6221 27671 9,223.51 922.35 9.090909091
11 36 0.8 35.968 135.717 30.51 47.244 0.5 0.05 0.019685 0.1 0.5 7449 33132 11,043.94 1,104.39 20
12 36 0.8 35.968 135.717 30.51 47.244 0.25 0.025 0.0098425 0.1 0.5 8116 36101 12,033.54 1,203.35 40
13 36 0.8 35.968 135.717 30.51 47.244 0.15 0.015 0.0059055 0.1 0.5 8418 37443 12,480.88 1,248.09 66.66666667
14 36 0.8 35.968 135.717 30.51 47.244 0.1 0.01 0.003937 0.1 0.5 8577 38152 12,717.26 1,271.73 100
15 36 0.8 35.968 135.717 30.51 47.244 0.05 0.005 0.0019685 0.1 0.5 8743 38888 12,962.76 1,296.28 200
16 36 0.8 35.968 135.717 30.51 47.244 0.04 0.004 0.0015748 0.1 0.5 8777 39039 13,013.01 1,301.30 250

2. Trestle - CSP 800

Design Load = 140 ton


Estimated Penetration Depth = 9m
OD = 0.8
t= 0.12
ID = 0.56
Apile = 0.2564 m2
sall = 0.6 x( f'c ) 29880 kN/m2
fc = 498 kg/cm2
49,800 kN/m2

 e  Wr  h   Wr  n Wp 
2
Pu   h   
 SC   Wr  Wp 

558630471.xls TRSTL-CSP 14
Stress
Remark
(kN/m2)

0
4,954
6,242
6,835
7,551
8,435
9,554
11,015
13,003 Ok!
14,293 Kriteria Standar Pemancangan
19,790
23,696
25,820
26,780
27,287
27,814
27,921

Stress
Remark
(kN/m2)

0
14,700 Ok!
18,521
20,279

558630471.xls TRSTL-CSP 15
22,404
25,028
28,347 Berdasarkan Batas Teg. Ijin
32,681
38,581
47,078
58,719
70,308
76,608
79,456
80,961
82,524
82,843

558630471.xls TRSTL-CSP 16
Project : 3rd and 4nd Jetty Maspion
Location : Gresik, East Java
Subject : Final Set Criteria

1. Pendahuluan
Laporan ini menyampaikan hasil pile driving analisis terhadap pemancangan tiang Jetty 3 dan Jetty 4 Siam Maspion Terminal.

2. Analisis yang ditampilkan dalam laporan ini ditujukan untuk :


- memperkirakan daya dukung ultimate aksial tiang pancang :
Baja Beton
- SPP 711 t = 12mm - CSP 600 t = 100mm
- SPP 609 t =12mm - CSP 800 t = 120mm
- SPP 762 t =12mm
- SPP 812 t =12mm
berdasarkan jenis hammer yang akan digunakan serta panjang tiang pancang
- memperkirakan maksimum aksial compression yang terjadi pada tiang

3. Perhitungan Daya Dukung dengan Formula Dinamik


Formula dinamik yang digunakan adalah dengan formula dinamik Hiley.

 e  Wr  h   Wr  n 2 Wp 
Pu   h  W  W 
 S  C  
 r p 

4. Pemilihan Berat Hammer yang Digunakan

Estimated
No. Pile Type Flag Diameter (m) Thickness (m) Length (m) Weight (ton) Minimum Hammer
Weight (ton)

1 CSP 600 Prestressed Concrete 0.600 0.1 15 5.65 3.5


2 CSP 800 Prestressed Concrete 0.400 0.075 18 3.31 2.3
2 CSP 400 Prestressed Concrete 0.500 0.09 20 5.56 3.4
2 CSP 400 Prestressed Concrete 1.000 0.14 26 23.60 12.5
2 CSP 400 Prestressed Concrete 1.200 0.15 32 38.00 19.7
3 SPP508-12 Steel 0.508 0.012 46 6.75 4
4 SPP508-12 Steel 0.508 0.012 36 5.28 3.3
5 SPP762-12 Steel 0.762 0.012 36 7.99 4.6
5 SPP711-14 Steel 0.711 0.014 36 8.66 5
6 SPP812-12 Steel 0.812 0.016 44 13.82 7.6
6 SPP914-14 Steel 0.914 0.016 47 16.65 9
6 SPP914-14 Steel 0.914 0.016 47 16.65 9
6 SPP1016-14 Steel 1.016 0.014 26 8.99 5.1

5. Hasil Analisa

Equipment NH-70 HH-16 H-9


DATA
Pa = Bearing Capacity of Pile = (ton)
eh = Efficiency Factor = 0.8 0.8 0.8
n = Restituen Coef. = 0.5 0.5 0.5
Wr = Weight of Hammer = 7 16 9 (ton)
Wp = Weight of Pile = (ton)

s = Final Set Pile / Blow = (inch)


h = Height of Ram Stroke = (inch)
SF = Safety Factor = 4 4 4

EQUATION :

Pa = en.Wr.h x Wr + (n².Wp) x 1
s+0.1 Wr+Wp SF

JETTY 4
No. Location Ø Pile H H S S Pa Required Remark
(cm) (inch) (inch) (cm) (ton)

1 Trestle 609.60 128 50.394 0.537 1.363 70.000 NH70


609.60 120 47.244 0.724 1.840 70.000 H9

600.00 128 50.394 0.184 0.468 165.000 NH70

800.00 120 47.244 0.876 2.225 135.000 HH16


800.00 120 47.244 0.403 1.023 135.000 H9

2 Jetty 711.20 128 50.394 0.145 0.368 195.000 NH70


711.20 120 47.244 0.531 1.349 195.000 HH16
711.20 120 47.244 0.215 0.546 195.000 H9

762.00 128 50.394 0.083 0.212 225.000 NH70


762.00 120 47.244 0.395 1.003 225.000 HH16
762.00 120 47.244 0.139 0.353 225.000 H9

812.80 128 50.394 0.057 0.146 225.000 NH70


812.80 120 47.244 0.338 0.859 225.000 HH16
812.80 120 47.244 0.106 0.270 225.000 H9
Project : 3rd and 4nd Jetty Maspion
Location : Gresik, East Java
Subject : Final Set Criteria

Catatan :
1. Batas maksimum pemancangan tiang untuk mencegah kerusakan pada tiang (pile refusal) berdasarkan pada API RP2A-WSD 2002
(American Petroleum Institute Recommended Practice 2A – WSD), Bab 12.5.6 yaitu 300 blows per foot (0.3 meter) atau 1000 blows
per meter (1 blow/mm).

2. Direkomendasikan untuk melakukan PDA test untuk masing-masing jenis tiang, berdasarkan harga final set (idealnya terbesar dan terkecil)
dan panjang penetrasi tiang (idealnya terpanjang dan terpendek) untuk memastikan nilai daya dukung aksial ultimit.
Project : 3rd and 4nd Jetty Maspion
Location : Gresik, East Java
Subject : Final Set Criteria

1. Pendahuluan
Laporan ini menyampaikan hasil pile driveability analysis terhadap pemancangan tiang Jetty 4 Siam Maspion Terminal, dengan menggunakan
perlengkapan pemancangan yang baru, yaitu dengan menggunakan Hydaulic Hammer H-9.

2. Analisis yang ditampilkan dalam laporan ini ditujukan untuk :


- memperkirakan daya dukung ultimate aksial tiang pancang :
Baja Beton
- SPP 711 t = 12mm - CSP 600 t = 100mm
- SPP 609 t =12mm - CSP 800 t = 120mm
- SPP 762 t =12mm
- SPP 812 t =12mm
berdasarkan jenis hammer yang akan digunakan serta panjang tiang pancang
- memperkirakan maksimum aksial compression yang terjadi pada tiang

3. Perhitungan Daya Dukung dengan Formula Dinamik


Formula dinamik yang digunakan adalah dengan formula dinamik Hiley.

 e  Wr  h   Wr  n 2 Wp 
Pu   h   
 SC   Wr  Wp
 

4. Pemilihan Berat Hammer yang Digunakan

Estimated
No. Pile Type Flag Diameter (m) Thickness (m) Length (m) Weight (ton) Minimum Hammer
Weight (ton)

1 CSP 600 Prestressed Concrete 0.600 0.1 43 16.21 8.2


1 CSP 500 Prestressed Concrete 0.500 0.09 36 10.02 5.1
2 CSP 800 Prestressed Concrete 0.800 0.12 34 20.92 10.5
2 CSP 400 Prestressed Concrete 0.400 0.075 20 3.68 1.9
2 CSP 300 Prestressed Concrete 0.400 0.09 13 2.73 1.4
3 SPP609-12 Steel 0.609 0.012 36 6.36 3.2
4 SPP711-12 Steel 0.711 0.0127 39 8.53 4.3
5 SPP762-12 Steel 0.762 0.012 36 7.99 4
6 SPP812-12 Steel 0.812 0.012 43 10.18 5.1
6 SPP914-14 Steel 0.914 0.0143 42 13.33 6.7
7 CSP 500 Prestressed Concrete 0.500 0.09 24 6.68 3.4
8 CSP 1000 Prestressed Concrete 1.000 0.14 36 32.68 16.4

5. Hasil Analisa

Equipment H-9
DATA
Pa = Bearing Capacity of Pile = (ton)
eh = Efficiency Factor = 0.8
n = Restituen Coef. = 0.5
Wr = Weight of Hammer = 9 (ton)
Wp = Weight of Pile = (ton)

s = Final Set Pile / Blow = (inch)


h = Height of Ram Stroke = (inch)
SF = Safety Factor = 4

EQUATION :

Pa = en.Wr.h x Wr + (n².Wp) x 1
s+0.1 Wr+Wp SF

JETTY 4
No. Location Ø Pile H* H S S Pa Required Remark
(cm) (inch) (inch) (cm) (ton)

1 Trestle 609.60 120 47.244 0.738 1.800 70.000 H9


800.00 120 47.244 0.200 0.500 135.000 H9

2 Jetty 711.20 120 47.244 0.177 0.400 195.000 H9


812.80 120 47.244 0.127 0.300 225.000 H9
Project : 3rd and 4nd Jetty Maspion
Location : Gresik, East Java
Subject : Final Set Criteria

Catatan :
1. Batas maksimum pemancangan tiang untuk mencegah kerusakan pada tiang (pile refusal) berdasarkan pada API RP2A-WSD 2002
(American Petroleum Institute Recommended Practice 2A – WSD), Bab 12.5.6 yaitu 300 blows per foot (0.3 meter) atau 1000 blows
per meter (1 blow/mm).

2. Direkomendasikan untuk melakukan PDA test untuk masing-masing jenis tiang, berdasarkan harga final set (idealnya terbesar dan terkecil)
dan panjang penetrasi tiang (idealnya terpanjang dan terpendek) untuk memastikan nilai daya dukung aksial ultimit.

Hormat saya,

Stefanus Ditya Pambudi