600

2. DRAWING TO BE READ IN CONJUNCTION WITH STRUCTURAL AND OTHER


ARCHITECTURAL DRAWING.ANY AMBIGUITY TO BE BROUGHT TO THE
NOTICE OF THE CONSULTANTS.
300 HIGH RCC
PARAPET WALL RCC ROOF SLAB LAID TO SLOPE 1:40 WITH 300 HIGH RCC 3. ALL DIMENSIONS IN MILLIMETER. DRAWING TO BE READ AND NOT SCALE.
WATER PROOFING TREATMENT AS SPECIFIED PARAPET WALL
N.R.L :- NEAREST ROAD LVL

600

600
600 600

5000(min)
2400

900
1000
SECTION:- A-A

SECTION:- B-B
1500 X 2000
PLATFORM

ROLLING SHUTTER
(3000 X 5000)

EP-34
01 02 03 04 05

EP-35 EP-32 EP-33


DG ROOM
6000 X 6000
UP

RAMP
STEPS

UP
1500 X 1200 EP-27

600

LT PANEL
BATTERY ROOM
5000 X 5000 EP-28
LIGHTINING
Transformer
LT PANEL ROOM LDB REV. DATE DESCRIPTION SIGNATURE
17200 X 9230

EP-53 EP-54
LEFT SIDE ELEVATION REVISIONS

ABOVE LINTEL BEAM


SCALE:- 1:100 CLIENT
EP-36 EP-29
2000
OFFICE
OIL & NATURAL GAS CORPORATION,
5000 X 5000
ANKLESHWAR.
750

D1
CABLE HT PANEL EP-30
TRENCH
ROLLING SHUTTER NAME OF WORK
5000 X 4000
(3000 X 5000)
EP-37 600 X 750 CONSTRUCTION OF ELECTRICAL SUBSTATION AND ASSOCIATED ELECTRICAL WORKS AT PTY'S
GANDHAR, ANKLESHWAR ASSET
PLATFORM PLATFORM
1000 X 1000 1200 X 2000
AT LINTEL LVL
05 EP-31
05

NGR
STEPS
03 04
STEPS
03
02
01 02
01
UP 2000 WIDE CONTRACTOR
EP-55 EP-56 UP
PROJECTION MAYUR ELECTRIC WORKS

DRAWN BY DRG. NO. MEW/PTYS-GANDHAR/002

DESIGNED BY PROJECT NO. SHEET NO. REVISION

REVIEWED BY
LAYOUT
SCALE 5020000158 01 OF 01 R0

RIGHT SIDE ELEVATION SCALE:- 1:100 DATE 02-06-2019