CITY
Project Brief
CAPITALMED is a medical tertiary care full-service health and medical city will provide high-
quality personalized medical care for Egypt, Africa, the MENA Region and Europe. It will include
3000+ beds, 450 ICUs, 40 Operating Rooms and 15,000+ multi-disciplinary health care
providers offering nearly 100 specialties assigned to operate the medical city.
CAPITALMED will offer a highly advanced Integrated health and medical services in one place
for all age groups and types of patients guided by the most advanced technology and highest
quality in wide range of Specialties. In addition, CAPITALMED will include academic and
research activities that mix the learning opportunities and the access to high-tech facilities.
CAPITALMED will also incorporate substantial non-medical services to support the staff,
patients, and visitors. The non-medical services include retail, hotel and transportation systems.
- The leading and most advanced medical city in the Middle East & Africa planned to fill an
evident demand-gap and to satisfy the needs of local, regional, and international clients.
- More than 966,435 m2 of Health & Medical Services and +/- 404,000 m2 of landscape and
green areas.
- CAPITALMED includes Badr University Hospital Center, Doctors’ Plaza, Simulation Center,
Virtual Hospital, Precision Medicine Institute, Transplant Institute, Rehab & Wellness Institute,
Trauma & Emergency Institute, 12+ other Health & Medical Institutes covering integrated
specialties, Research & Development (R&D) Institute of Advanced Health & Medicine,
Hospitality Services, and Commercial & Retail Facilities.
- +/- 15,000 job opportunities, in addition to state-of-the-art nursing & medical technician
education and training Institute.
- Collaboration and Integration with BUC School of Medicine and partnerships with National
and International Health and Medical scientific organizations
- The total built-up area is 30% of the total land area (equal more than 173,000 m2),
- 20% of the total land area is allocated for medical buildings (equal more than 115,400 m2),
- 5% of the total land area for residential use (equal more than 28,850 m2),
- 5% of the total land area for commercial use (equal more than 28,850 m2),
- 70% of the total land area is allocated for the landscape, green areas, and internal roads
(equals +/- 404,000 m2).
- Detailed CAPITALMED Phases, Components and Service Mix is elaborated in another
document.
LOCATION:
- Direct access to major national highways network with unrestricted national access.
- 20 minutes from Cairo International Airport, and 10 minutes from the New
Mega International Airport of the New Capital.
Timeline
Phase I Components:
- Shopping Mall & Commercial Area (incl. Retail Stores for medical & health supplies)
Phase II Components:
CAPITALMED TIMELINE:
- Construction is planned to begin by end of Q1-2021 and launch the first phase in Q2-2023.
- The construction of the entire 4 phases of the project will be completed within 7 years.
(Phase 2) to (Phase 4)
(Phase 1)
Y3 to Y6 (Phase 2)
Y3 to Y4 (Phase 1-C)
- CAPITALMED Design:
• Concept Design: Completed and approved
• Master Plan: Completed and approved
• Final (100%) Detailed design: (BOQs, Specs, and Drawings for Construction):
Completed
- Project Management & Value Engineering Consultant: Assigned; Hill International
- International Operator: Contractual Process is Going-on
- Site Preparation & Excavation: Completed Nov 2019
- Design Approval by the “Supreme Council of University Hospitals”: Completed.
- Design Approval by “Civil Protection & Firefighting Authority”: Completed
- Design Approval by “Housing & Building National Research Center”: Completed.
- Environmental & Social Impact Assessment and Traffic Impact Study:
Completed by “INTEGRAL Environmental Solutions – Member of INOGEN
Environmental Alliance”.
- Assigning Inclusive Financial Advisor and Sole Bookrunner: Completed; EFG HERMES.
- Legal Advisors: Assigned: Zulficar & Partners, White & Case, and Arab Law Firm
- Issuing construction License by Badr City Authority: Completed.
- Prequalification of International Construction Companies: Completed
- Pre-qualified Contractors’ Tender: Issued on March 2020
- Contractors’ Tenders evaluation and issuing Short list: Completed.
- Construction Supervision Consultant Contractual Process: Going-on (Short-list issued)
- Construction Phase: is planned to start in April 2021.