Open Pit Final
Open Pit Final
Año 1
FASE 1 FASE 2
MINERAL 1,694,963 -
LEY% 0.60
LASTRE 86,534,948 62,705,783
Año 2
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
Año 3
FASE 1 FASE 2
MINERAL 12,219,730
LEY% 0.78
LASTRE 114,246,215
Año 4
FASE 1 FASE 2
MINERAL 41,196,439
LEY% 0.85
LASTRE 132,048,946
Año 5
FASE 1 FASE 2
MINERAL 48,022,874 271,514
LEY% 0.68 0.64
LASTRE 59,742,417 41,445,043
Año 6
FASE 1 FASE 2
MINERAL 59,145,333 1,117,819
LEY% 0.68 0.55
LASTRE 47,132,512 90,061,720
Año 7
FASE 1 FASE 2
MINERAL 57,648,339 3,593,877
LEY% 0.80 0.64
LASTRE 11,901,960 112,643,335
Año 8
FASE 1 FASE 2
MINERAL 52,063,757 9,912,042
LEY% 0.90 0.59
LASTRE 1,655,219 113,094,209
Año 9
FASE 1 FASE 2
MINERAL 33,385,247 29,180,867
LEY% 1.03 0.56
LASTRE - 125,271,814
Año 10
FASE 1 FASE 2
MINERAL 55,230,793
LEY% 0.55
LASTRE 82,917,457
Año 11
FASE 1 FASE 2
MINERAL 59,641,026
LEY% 0.62
LASTRE 39,925,223
Año 12
FASE 1 FASE 2
MINERAL 66,314,551
LEY% 0.67
LASTRE 20,434,866
Año 13
FASE 1 FASE 2
MINERAL 49,489,903
LEY% 0.75
LASTRE 5,300,267
Año 14
FASE 1 FASE 2
MINERAL 51,843,961
LEY% 0.82
LASTRE 1,737,082
Año 15
FASE 1 FASE 2
MINERAL 51,570,077
LEY% 0.89
LASTRE 93,266
Año 16
FASE 1 FASE 2
MINERAL 44,204,965
LEY% 0.92
LASTRE -
Año 17
FASE 1 FASE 2
MINERAL 19,952,667
LEY% 0.91
LASTRE -
Año 18
FASE 1 FASE 2
MINERAL 50,464,538
LEY% 0.91
LASTRE
Año 19
FASE 1 FASE 2
MINERAL 38,328,743
LEY% 0.87
LASTRE -
Año 20
FASE 1 FASE 2
MINERAL 3,682,383
LEY% 0.85
LASTRE
Año 21
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
Año 22
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
Año 23
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
Año 24
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
Año 25
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
Año 26
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
Año 27
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
Año 28
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
Año 29
FASE 1 FASE 2
MINERAL
LEY%
LASTRE
FASE 1 FASE 2
TOTAL 305,376,683 453,262,217 534,799,727 695,630,066
FASE 3 FASE 4 FASE 5
Mineral Lastre Mineral Lastre Mineral
Ley Tonelaje Tonelaje Ley Tonelaje Tonelaje Ley
68,692
1,451,055
4,969,731 3,032
8,103,413 196,333
9,779,619 553,607
10,707,785 897,862
12,405,263 1,252,679
14,048,925 1,635,174
0.490 10,009 15,544,401 2,192,707
0.559 56,927 16,842,655 3,144,182 0.532
0.585 75,970 18,942,851 0.407 10,147 4,816,885 0.580
1.079 37,003 21,876,317 0.407 5,073 6,520,377 0.552
2.321 16,105 22,477,192 0.439 20,475 10,242,881 0.458
0.545 127,712 22,566,642 0.421 17,116 11,221,948 0.457
0.603 505,441 22,736,493 0.431 19,362 12,685,194 0.405
0.586 665,370 22,878,319 0.440 14,333 14,873,357 0.632
0.551 509,615 23,176,749 0.519 17,077 15,955,529 0.711
0.507 590,416 22,022,676 0.540 25,274 16,976,442 0.622
0.488 826,771 23,775,623 0.480 33,351 16,649,741 0.623
0.510 956,102 24,422,196 0.687 89,835 16,213,463 0.557
0.509 1,122,995 23,851,279 0.654 146,852 15,758,197 0.584
0.518 1,288,473 23,289,394 0.595 182,163 14,797,445 0.521
0.556 6,529,425 22,648,558 0.529 155,553 13,352,692 0.565
0.552 2,187,991 21,863,791 0.440 172,155 13,315,585 0.567
0.509 2,708,495 19,483,707 0.421 161,966 13,422,794 0.569
0.483 3,589,521 18,216,600 0.420 197,228 6,197,372 0.600
0.478 4,500,621 16,920,765 0.433 531,626 12,853,372 0.616
0.495 5,679,525 15,331,717 0.436 918,771 12,505,411 0.605
0.537 7,390,363 14,333,762 0.441 1,449,335 12,006,679 0.615
0.546 8,370,572 11,903,462 0.452 2,092,348 12,163,266 0.569
0.550 8,749,702 7,976,992 0.463 2,839,699 12,356,696 0.517
0.564 9,541,173 6,815,775 0.471 3,354,236 10,686,000 0.501
0.582 10,345,591 5,651,876 0.488 3,911,994 10,015,302 0.494
0.604 10,719,398 4,914,568 0.518 4,599,170 9,297,746 0.506
0.605 10,744,671 4,519,079 0.537 5,650,978 8,224,270 0.531
0.603 7,287,029 2,812,727 0.556 9,420,061 8,371,817 0.562
0.570 16,210,124 9,415,663 0.600
0.570 17,127,550 7,489,687 0.616
0.586 18,101,252 5,731,967 0.622
0.599 19,127,731 4,462,157 0.624
0.616 19,505,479 3,499,488 0.629
0.638 19,546,914 2,872,745 0.624
0.656 19,610,670 2,276,180 0.618
0.673 19,962,224 1,793,704 0.616
0.693 19,865,749 1,405,664 0.620
0.698 19,584,595 1,092,510 0.631
0.694 19,463,810 653,599 0.642
0.687 19,265,314 234,521 0.648
0.718 25,699,123 69,835 0.653
0.725 18,813,203 15,011 0.690
0.704
0.698
0.692
FASE 3 FASE 4
FASE 3 FASE 4
-
61,534,482 4,538,687
FASE 3 FASE 4
FASE 3 FASE 4
FASE 3 FASE 4
FASE 3 FASE 4
FASE 3 FASE 4
FASE 3 FASE 4
FASE 3 FASE 4
FASE 3 FASE 4
142,905
0.57
51,329,906
FASE 3 FASE 4
686,261
0.66
89,656,644
FASE 3 FASE 4
1,765,401 35,695
0.55 0.43
68,077,744 26,917,031
FASE 3 FASE 4
10,723,764
0.54
117,987,050
FASE 3 FASE 4
8,486,007 93,163
0.51 0.48
59,564,097 71,712,470
FASE 3 FASE 4
10,180,146
0.92 0.50
32,252,482
FASE 3 FASE 4
15,760,935 1,139,105
0.54 0.52
26,237,224 109,707,290
FASE 3 FASE 4
39,355,863
0.58 0.61
25,359,211
FASE 3 FASE 4
11,186,017
0.46 0.54
72,571,425
FASE 3 FASE 4
18,031,701
0.60 0.59
7,331,806
FASE 3 FASE 4
39,792,327
0.55 0.54
45,324,798
FASE 3 FASE 4
35,228,802
0.58 0.56
13,221,654
FASE 3 FASE 4
38,633,210
0.61 0.62
7,961,645
FASE 3 FASE 4
39,157,585
0.65 0.63
5,148,925
FASE 3 FASE 4
39,827,972
0.68 0.62
3,199,368
FASE 3 FASE 4
39,048,404
0.70 0.62
1,746,109
FASE 3 FASE 4
44,964,436
0.70 0.64
304,356
FASE 3 FASE 4
18,813,203
0.73 0.67
15,011
FASE 3 FASE 4
0.70
FASE 3 FASE 4
0.69
125,618
1,171,173
2,264,352
4,181,993
6,140,877
8,214,023
10,730,070
12,316,920
13,682,853
15,227,772
10,057 16,759,388
27,309 17,475,730
18,388 17,150,314
45,038 16,604,913
24,380 17,261,428
4 17,843,821
6,339 18,545,981
40,559 19,008,727
92,052 17,813,435
123,490 15,568,563
116,702 15,452,219
118,542 15,299,114
262,427 15,262,570
490,173 15,630,059
901,352 15,814,919
1,429,524 16,160,891
1,682,588 14,829,615
1,935,080 14,211,074
2,097,615 13,201,451
1,993,706 11,846,347
1,853,899 12,260,350
2,172,063 13,633,480
3,145,522 13,279,444
4,265,570 11,727,878
5,275,844 10,219,116
6,586,513 8,419,596
8,566,901 6,826,328
10,982,153 5,338,334
11,643,949 3,869,628
12,493,452 3,462,512
12,851,848 2,755,365
13,417,686 1,889,138
13,747,115 1,214,010
13,637,784 1,019,636
12,516,254 1,248,508
10,994,678 1,346,031
10,749,960 1,336,144
10,699,713 992,541
10,909,297 513,924
10,857,669 233,878
19,415,105 170,149
35,908,221 138,257
14,079,475 143,324
21,560,981 117,397
289,746,978 497,951,175
Ton.total
FASE 5
1,694,963
0.60 150,935,695
149,240,732
Ton.total
FASE 5
- -
- 124,901,049
58,827,879 124,901,049
Ton.total
FASE 5
12,219,730
0.78 126,465,945
114,246,215
Ton.total
FASE 5
41,196,439
0.85 173,245,386
132,048,946
Ton.total
FASE 5
48,294,389
0.68 149,481,848
101,187,459
Ton.total
FASE 5
60,263,152
0.67 197,457,385
137,194,232
Ton.total
FASE 5
61,242,216
0.79 185,787,510
124,545,294
Ton.total
FASE 5
61,975,799
0.85 176,725,227
114,749,428
Ton.total
FASE 5
62,566,114
0.81 187,837,928
125,271,814
Ton.total
FASE 5
55,373,698
0.55 189,621,061
134,247,362
Ton.total
FASE 5
60,327,287
0.62 189,909,154
129,581,867
Ton.total
FASE 5
68,115,648
0.67 183,545,289
115,429,641
Ton.total
FASE 5
60,213,667
0.71 183,500,985
123,287,317
Ton.total
FASE 5
60,423,130
0.78 193,436,779
133,013,649
Ton.total
FASE 5
125,172 61,875,394
0.89 194,700,688
100,479,545 132,825,294
Ton.total
FASE 5
61,105,005
0.81 197,049,520
135,944,514
Ton.total
FASE 5
379,145 59,687,676
0.69 189,279,632
104,232,745 129,591,957
Ton.total
FASE 5
380,970 62,031,525
0.83 165,164,633
30,561,684 103,133,108
Ton.total
FASE 5
6,438,717 62,799,161
146,777,524
0.77 146,777,524
76,646,557 83,978,364
Ton.total
FASE 5
15,528,376 59,003,085
0.56 180,276,832
75,948,949 121,273,747
Ton.total
FASE 5
31,411,411 66,640,213
0.57 110,665,241
30,803,374 44,025,028
Ton.total
FASE 5
24,137,401 62,770,611
0.61 78,064,395
7,332,140 15,293,784
Ton.total
FASE 5
26,269,534 65,427,119
0.64 75,220,547
4,644,503 9,793,428
Ton.total
FASE 5
27,384,899 67,212,871
0.66 72,645,885
2,233,646 5,433,014
Ton.total
FASE 5
23,510,932 62,559,337
0.67 66,899,984
2,594,539 4,340,648
Ton.total
FASE 5
21,449,673 66,414,109
0.68 69,047,151
69,047,151
2,328,685 2,633,041
Ton.total
FASE 5
41,182,071 59,995,274
0.69 60,928,236
917,951 932,962
Ton.total
FASE 5
35,908,221 35,908,221
0.70 36,046,477
138,257 138,257
Ton.total
FASE 5
35,640,456 35,640,456
0.69 35,901,177
260,720 260,720
FASE 5
289,746,978 497,951,175
Periodo (Años) Mineral (ton) Ley Media(%) Lastre (ton) REM
Pre-Stripping 1 1,694,963 - 149,240,732 88
Pre-Stripping 2 - - 124,901,049 -
3 12,219,730 0.78 114,246,215 9.35
4 41,196,439 0.85 132,048,946 3.21
5 48,294,389 0.68 101,187,459 2.10
6 60,263,152 0.67 137,194,232 2.28
7 61,242,216 0.79 124,545,294 2.03
8 61,975,799 0.85 114,749,428 1.85
9 62,566,114 0.81 125,271,814 2.00
10 55,373,698 0.55 134,247,362 2.42
11 60,327,287 0.62 129,581,867 2.15
12 68,115,648 0.67 115,429,641 1.69
13 60,213,667 0.71 123,287,317 2.05
14 60,423,130 0.78 133,013,649 2.20
15 61,875,394 0.89 132,825,294 2.15
16 61,105,005 0.81 135,944,514 2.22
17 59,687,676 0.69 129,591,957 2.17
18 62,031,525 0.83 103,133,108 1.66
19 62,799,161 0.77 83,978,364 1.34
20 59,003,085 0.56 121,273,747 2.06
21 66,640,213 0.57 44,025,028 0.66
22 62,770,611 0.61 15,293,784 0.24
23 65,427,119 0.64 9,793,428 0.15
24 67,212,871 0.66 5,433,014 0.08
25 62,559,337 0.67 4,340,648 0.07
26 66,414,109 0.68 2,633,041 0.04
27 59,995,274 0.69 932,962 0.02
28 35,908,221 0.70 138,257 0.00
29 35,640,456 0.69 260,720 0.01
Total 1,542,976,289 0.71 2,548,542,874 1.78
149,481,848
197,457,385 0.80
185,787,510
0.70
176,725,227
187,837,928
0.60
189,621,061 TONELAJE
189,909,154
0.50
183,545,289
183,500,985 0.40
193,436,779
194,700,688 0.30
197,049,520
189,279,632 0.20
165,164,633
146,777,524 0.10
180,276,832
110,665,241 -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
78,064,395
75,220,547
72,645,885
66,899,984
69,047,151
60,928,236 Mineral (ton) Lastre (ton)
36,046,477
35,901,177
4,091,519,163 Ton.Mineral vs Ley M
80000000
FASE 5 Ton. Total
150,935,695 70000000
58,827,879 124,901,049
126,465,945 60000000
173,245,386
149,481,848
TONELAJE MINERAL
50000000
197,457,385
185,787,510 40000000
176,725,227
187,837,928 30000000
20000000
10000000
TONELAJE MINE
40000000
30000000
189,621,061
189,909,154 20000000
183,545,289
183,500,985 10000000
193,436,779
100,604,717 194,700,688 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1
197,049,520
104,611,891 189,279,632 Periodo (Años) Mineral (ton)
30,942,654 165,164,633
83,085,274 146,777,524 REM POR PERIODO
91,477,324 180,276,832
62,214,785 110,665,241 10.00
9.35
31,469,540 78,064,395
9.00
30,914,037 75,220,547
29,618,545 72,645,885 8.00
26,105,471 66,899,984
23,778,358 69,047,151 7.00
42,100,022 60,928,236
6.00
36,046,477 36,046,477
35,901,177 35,901,177
REM
5.00
787,698,153 4,091,519,163
4.00
3.21
3.00
2.28 2.42
2.10 2.03 2.15 2.05 2.20 2.15 2.22 2.17
2.00 1.85 2.00 1.69 1.66
1
1.00
0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
PLAN DE MINADO
250,000,000
200,000,000
150,000,000
ley media%
100,000,000
50,000,000
-
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
0.90
0.80
0.70
0.60
ley media%
0.50
0.40
0.30
0.20
0.10
ley media%
0.50
0.40
0.30
0.20
0.10
-
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
2
2.15 2.05 2.20 2.15 2.22 2.17 2.06
1.69 1.66
1.34
0.66
0.24 0.15 0.08 0.07
0.04 0.02 0.00 0.01
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Calculo de equipos
Perforadora MD6540
Burden (m) 7 Densidad (ton/m3) 2.5
Pasadura (m) 3 Utilizacion (%) 0.7
Espaciamiento (m) 8 Altura Banco (m) 15
Vel. Efectiva (mts/h) 29 Vol de Tronadura 2100
Disponibilidad (%) 0.8
Periodos Pre 1 Pre 2 3 4
Pozos requeridos en Mineral 16 54
Pozos requeridos en Lastre 197 165 151 175
Metros a perfrorar Mineral 291 981
Metros a perfrorar Lastre 3,553 2,974 2,720 3,144
Tiempoe efectivo de perfo. Mineral(h) 10 34
Tiempoe efectivo de perfo. Lastre(h) 123 103 94 108
Numero de Perfos. Mineral 0.75 2.52
Numero de Perfos. Lastre 9.12 7.63 6.98 8.07
Total Perforadoras 9 8 8 11
5 6 7 8 9 10 11 12
2 2 2 2 2 2 2 2
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
1 1 1 1 1 1 1 1
20.0 27.8 30.5 31.0 31.9 33.8 36.1 36.4
14.0 19.4 21.4 21.7 22.3 23.6 25.3 25.5
40.6 53.8 58.5 59.3 60.8 64.0 68.0 68.5
5 6 7 8 9 10 11 12
55 68 69 70 71 63 68 77
114 155 141 130 141 152 146 130
2.97 3.71 3.77 3.81 3.85 3.41 3.71 4.19
6.22 8.44 7.66 7.06 7.70 8.26 7.97 7.10
9 12 11 11 12 12 12 11
5 6 7 8 9 10 11 12
18 24 23 22 23 23 23 23
10 13 12 12 13 13 13 12
9 12 11 11 12 12 12 11
5 5 5 5 5 5 5 5
Equipos de Apoyo
Bulldozer CATD10 Whelldozer KOMATSU WD600 Motoniveladora CAT16M Regadores
30
25
20
15
10
20
15
10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
PERIODO
13 14 15 16 17 18 19 20
8430 8620 9930 9620 9650 9710 9770 9870
7440 8440 9850 9550 9700 9720 9790 9760
13 14 15 16 17 18 19 20
2 2 2 2 2 2 2 2
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
1 1 1 1 1 1 1 1
36.1 36.9 42.6 41.2 41.4 41.6 41.9 42.3
25.3 25.9 29.8 28.9 29.0 29.1 29.3 29.6
68.0 69.4 78.9 76.7 76.9 77.3 77.8 78.5
13 14 15 16 17 18 19 20
68 68 70 69 67 70 71 67
139 150 150 154 146 116 95 137
3.70 3.72 3.81 3.76 3.67 3.82 3.86 3.63
7.58 8.18 8.17 8.36 7.97 6.34 5.16 7.46
11 12 12 12 12 10 9 11
13 14 15 16 17 18 19 20
23 24 24 24 23 20 18 22
12 13 13 13 13 11 10 12
11 12 12 12 12 10 9 11
5 5 5 5 5 5 5 5
Total de camio
160
Total de camio
160
140
120
21 22 23 24 25 26 27 28 29 30 31
100
cANTIDAD
80
60
40
20
0
1 2 3 4 5 6 7 8 9 10 11
12 13 14
21 22 23 24 25 26 27 28
9920 9980 10080 10150 10190 10220 10300 10520
9800 9850 9940 10480 10550 10620 10770 11230
21 22 23 24 25 26 27 28
2 2 2 2 2 2 2 2
0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1
1 1 1 1 1 1 1 1
42.5 42.8 43.2 43.5 43.7 43.8 44.1 45.1
29.8 29.9 30.2 30.5 30.6 30.7 30.9 31.6
78.9 79.3 80.0 80.6 80.8 81.1 81.6 83.2
21 22 23 24 25 26 27 28
75 71 74 76 71 75 68 41
50 17 11 6 5 3 1 0
4.10 3.86 4.02 4.13 3.85 4.08 3.69 2.21
2.71 0.94 0.60 0.33 0.27 0.16 0.06 0.01
7 5 5 4 4 4 4 2
21 22 23 24 25 26 27 28
14 10 9 9 8 8 7 4
8 6 6 5 5 5 5 3
7 5 5 4 4 4 4 2
5 5 5 5 5 5 5 5
Flota de equipos
Total de camiones Total Perforadoras Numero Total de Palas
Flota de equipos
Total de camiones Total Perforadoras Numero Total de Palas
6 7 8 Total Perforadoras
9 10 11
12 13 14
15 16 17
18 19 20
21 22 23 Total de camiones
24 25 26
27 28 29
30 31
29
10640
11480
29
2
0.5
2
1
0.1
1
45.6
31.9
84.1
49.2
34.44
90.2
29
207
193
724
99,001
4
513
0.21
31.46
32
29
47
0
849
6
29
0
2.18
0.02
2
29
40
0
2.19
0.02
2
29
4
3
2
5
o Total de Palas
doras
Stock
1,694,963
Escenario 60Mton. por periodo -1 Pre Stripp 1 Pre Stripp 2 3
Mineral (Mton) 1,694,963 12,219,730
Lastre (Mton) 149,240,732 124,901,049 114,246,215
Total (Mton) 150,935,695 124,901,049 126,465,945
4 5 6 7 8 9
-389,802,118 -340,147,825 -444,279,115 -418,021,899 -397,631,761 -422,635,338
-576,750,152 -699,850,924 -843,684,131 -857,391,028 -867,661,187 -875,925,592
-220,922,697 -214,280,657 -256,806,320 -304,833,423 -333,876,992 -321,365,301
-16,478,576 -19,995,741 -24,105,261 -24,496,887 -24,790,320 -25,026,445
-1,203,953,543 -1,274,275,147 -1,568,874,827 -1,604,743,236 -1,623,960,260 -1,644,952,676
10 11 12 13 14 15
55,373,698 60,327,287 68,115,648 60,213,667 60,423,130 61,875,394
134,247,362 129,581,867 115,429,641 123,287,317 133,013,649 132,825,294
189,621,061 189,909,154 183,545,289 183,500,985 193,436,779 194,700,688
10 11 12 13 14 15
-426,647,386 -427,295,597 -412,976,900 -412,877,215 -435,232,753 -438,076,547
-775,231,773 -844,582,014 -953,619,065 -842,991,342 -845,923,821 -866,255,517
-192,462,067 -235,948,906 -288,634,168 -269,800,187 -296,724,708 -350,320,589
-22,149,479 -24,130,915 -27,246,259 -24,085,467 -24,169,252 -24,750,158
-1,416,490,705 -1,531,957,432 -1,682,476,392 -1,549,754,211 -1,602,050,534 -1,679,402,811
16 17 18 19 20 21
61,105,005 59,687,676 62,031,525 62,799,161 59,003,085 66,640,213
135,944,514 129,591,957 103,133,108 83,978,364 121,273,747 44,025,028
197,049,520 189,279,632 165,164,633 146,777,524 180,276,832 110,665,241
16 17 18 19 20 21
-443,361,419 -425,879,173 -371,620,424 -330,249,430 -405,622,873 -248,996,793
-855,470,073 -835,627,458 -868,441,345 -879,188,251 -826,043,196 -932,962,987
-314,481,576 -260,280,170 -324,878,633 -305,198,371 -210,655,366 -240,829,498
-24,442,002 -23,875,070 -24,812,610 -25,119,664 -23,601,234 -26,656,085
-1,637,755,070 -1,545,661,871 -1,589,753,012 -1,539,755,717 -1,465,922,669 -1,449,445,363
22 23 24 25 26 27
62,770,611 65,427,119 67,212,871 62,559,337 66,414,109 59,995,274
15,293,784 9,793,428 5,433,014 4,340,648 2,633,041 932,962
78,064,395 75,220,547 72,645,885 66,899,984 69,047,151 60,928,236
22 23 24 25 26 27
-175,644,889 -169,246,230 -163,453,242 -150,524,965 -155,356,089 -137,088,531
-878,788,548 -915,979,663 -940,980,198 -875,830,712 -929,797,530 -839,933,837
-243,022,055 -264,537,741 -279,622,580 -264,016,420 -286,855,885 -260,628,139
-25,108,244 -26,170,848 -26,885,149 -25,023,735 -26,565,644 -23,998,110
-1,322,563,737 -1,375,934,482 -1,410,941,169 -1,315,395,832 -1,398,575,148 -1,261,648,617
28 29
35,908,221 35,640,456
138,257 260,720
36,046,477 35,901,177
0.70 0.69
557,452,956 545,538,671
0.82 0.82
457,111,424 447,341,711
28 29
-81,104,574 -80,777,647
-502,715,090 -498,966,389
-159,988,998 -156,569,599
-14,363,288 -14,256,183
-758,171,951 -750,569,817
CAPEX
Requerimientos
Pala Cable CAT 7495 9 8 8
Camion CAT 794 19 16 20
Perforadora MD6540 9 8 8
Bulldozzer CATD10 18 15 16
Whelldozer KomatsuWD 10 9 9
Regador CAT 773 5 5 5
Motoniveladora CAT16M 9 8 8
Equipos Costos
Pala Cable CAT 7495 27,000,000
Camion CAT 794 4,600,000
Perforadora MD6540 5,341,000
Bulldozzer CATD10 1,620,000
Whelldozer Komatsu WD 955,000
Regador CAT 773 1,500,000
Motoniveladora CAT16M 950,000
12,605,870,000
126,058,700
4 5 6 7 8 9 10
Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad
2 1
45 2 9
1
3
1
3
1
11 9 12 11 11 12 12
56 62 107 105 100 109 114
11 9 12 11 11 11 12
21 18 24 23 22 23 23
12 10 13 12 12 13 13
5 5 5 5 5 5 5
11 9 12 11 11 12 12
4 5 6 7 8 9 10
Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad
54,000,000 - 27,000,000 - - - -
- 207,000,000 - - 9,200,000 41,400,000 -
- 5,341,000 - - - - -
- 4,860,000 - - - - -
- 955,000 - - - - -
- - - - - - 4,500,000
- 950,000 - - - - -
54,000,000 219,106,000 27,000,000 - 9,200,000 41,400,000 4,500,000
11 12 13 14 15 16 17 18
Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad
13 19
3
4
3
2
3
12 11 11 12 12 12 12 10
118 116 118 131 150 148 143 125
12 11 11 12 12 12 12 10
23 23 23 24 24 24 23 20
13 12 12 13 13 13 13 11
5 5 5 5 5 5 5 5
12 11 11 12 12 12 12 10
11 12 13 14 15 16 17 18
Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad
- - - - - - - -
- - 59,800,000 87,400,000 - - - -
- - - - 16,023,000 - - -
- - - - - 6,480,000 - -
- - - - - - 2,865,000 -
- - - - 3,000,000 - - -
- 2,850,000 - - - - - -
- 2,850,000 59,800,000 87,400,000 19,023,000 6,480,000 2,865,000 -
19 20 21 22 23 24 25 26
Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad
3
2
2
2
3
3
9 11 7 5 5 4 4 4
112 138 85 60 58 59 55 57
9 11 7 5 5 4 4 4
18 22 14 10 9 9 8 8
10 12 8 6 6 5 5 5
5 5 5 5 5 5 5 5
9 11 7 5 5 4 4 4
19 20 21 22 23 24 25 26
Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad Cantidad
- 81,000,000 - - - - - -
- - - - - - - -
10,682,000 - - - - - - -
- - 3,240,000 - - - - -
- 1,910,000 - - - - - -
- - 4,500,000 - - - - -
2,850,000 - - - - - - -
13,532,000 82,910,000 7,740,000 - - - - -
27 28 29
Cantidad Cantidad Cantidad
4 2 2
51 31 32
4 2 2
7 4 4
5 3 3
5 5 5
4 2 2
27 28 29
Cantidad Cantidad Cantidad
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
StockPile
1,694,963
Escenario 60Mton. por periodo -1 Pre Stripp 1
Mineral (Mton)
Lastre (Mton) 149,240,732
Total (Mton) 149,240,732
Cut (%)
CuF contenido (MLb)
Recuperación 82%
CuF recuperado (MLb)
Precio (U$/Lb) 2.95
Ingresos (MU$)
OPEX PRE 1
Costo Mina 2.25 -335,791,646
Costo Procesamiento (Flotacion) 14
Costo de Venta (US$/Lb) 0.35
G&A (US$/ore) 0.4
Costos de Operación -335,791,646
Depreciacion -63,029,350
PRE 2 3 4 5 6
-281,027,361 -284,548,377 -389,802,118 -340,147,825 -444,279,115
-171,076,224 -576,750,152 -699,850,924 -843,684,131
-60,665,202 -220,922,697 -214,280,657 -256,806,320
-4,887,892 -16,478,576 -19,995,741 -24,105,261
-281,027,361 -521,177,695 -1,203,953,543 -1,274,275,147 -1,568,874,827
7 8 9 10 11
-418,021,899 -397,631,761 -422,635,338 -426,647,386 -427,295,597
-857,391,028 -867,661,187 -875,925,592 -775,231,773 -844,582,014
-304,833,423 -333,876,992 -321,365,301 -192,462,067 -235,948,906
-24,496,887 -24,790,320 -25,026,445 -22,149,479 -24,130,915
-1,604,743,236 -1,623,960,260 -1,644,952,676 -1,416,490,705 -1,531,957,432
12 13 14 15 16
-412,976,900 -412,877,215 -435,232,753 -438,076,547 -443,361,419
-953,619,065 -842,991,342 -845,923,821 -866,255,517 -855,470,073
-288,634,168 -269,800,187 -296,724,708 -350,320,589 -314,481,576
-27,246,259 -24,085,467 -24,169,252 -24,750,158 -24,442,002
-1,682,476,392 -1,549,754,211 -1,602,050,534 -1,679,402,811 -1,637,755,070
17 18 19 20 21
-425,879,173 -371,620,424 -330,249,430 -405,622,873 -248,996,793
-835,627,458 -868,441,345 -879,188,251 -826,043,196 -932,962,987
-260,280,170 -324,878,633 -305,198,371 -210,655,366 -240,829,498
-23,875,070 -24,812,610 -25,119,664 -23,601,234 -26,656,085
-1,545,661,871 -1,589,753,012 -1,539,755,717 -1,465,922,669 -1,449,445,363
22 23 24 25 26
-175,644,889 -169,246,230 -163,453,242 -150,524,965 -155,356,089
-878,788,548 -915,979,663 -940,980,198 -875,830,712 -929,797,530
-243,022,055 -264,537,741 -279,622,580 -264,016,420 -286,855,885
-25,108,244 -26,170,848 -26,885,149 -25,023,735 -26,565,644
-1,322,563,737 -1,375,934,482 -1,410,941,169 -1,315,395,832 -1,398,575,148
27 28 29
-137,088,531 -81,104,574 -80,777,647
-839,933,837 -502,715,090 -498,966,389
-260,628,139 -159,988,998 -156,569,599
-23,998,110 -14,363,288 -14,256,183
-1,261,648,617 -758,171,951 -750,569,817