cme minan
Direction Champ
CHECKLIST DE PERMIS DE TRAVAIL
Permis de trave : 9 | compagnie: GTI H,
Dpeturermis: Rous naad — Rigas Chociles Pema: Hshamed Amon
vate couverture du Permis: \G /C3/200\ Autoritédezone: CDS. Cy
ote début des travaux: A9/C9(.2| Aesponsabiedenécuion: CH Hecerngus.
Date dein des travaux: | _— Responsable use: CPT H&E tu
zmnedewavatt Kecagtion / TRY Aloverber
be rravait: DE g na int
SER HOate p Ren SP
sem Description ‘nore beervaions
al on [ZA
Desrpin aia
Iseton complet pre? x
Ta Tipe peri aor?
Premieres
2 | Tours pemasetcrtfet ances nt emesis lepermis?
[> |X
iain de ae
Si Tous dnges soc nis?
RE NE TERT ral
25 parton des Rupe nt appropri?
5 ape Te TEETER?
5 ao a pep GTA an AER
Pee
[ato remap eee TSE
eons?
5 pene ii TS a RET
oa
Fe TIO TTT TRI ETEDirection Champ
ment sins
eae Sem cee ee emai?
Ta a Ts Toca $
at ian raat dm fortnr oTs
‘5 |e oprootn dr pera?
Keay os
enka pes (ee
"ia ani Tice
ES ypede cone dotesphare ends Feige permis?
fay As cere iti
Gar pod ds presence
arsine br dewalt corre des aan
ander ute decane
"Fg dopo a pd de
27 | port prcasesur i perm
Ver commenti
aS PEPE RETA FT
PS ATS
Action di pris atari
rendre por le esonsheexcuon
it terepoanhe enter ogee perms?
a ape Tin a AF
tapers taper ae
op | Ee izpemmgl een wm stage ea TG
ES epee RE aE PORE HN
nator
penne acannon oats ators
rnd encardurgence monde carton Scere)
Inspection éatseepar:ar. FANRENO
\9/03 1.2