Telecommunications Infrastructure Design Standards

(Version 10)

IF YOU HAVE ANY QUESTIONS OR COMMENTS ABOUT THIS INSTALLATION GUIDE PLEASE VISIT
THE COMPLETE TELECOMMUNICATIONS INFRASTRUCTc665SIGNTS
Version 10

Initial Release November 26, 2012 TEST INDEX Page 2


Version 10

Initial Release November 26, 2012 TEST INDEX


TEST INDEX Page 3 of 61
Version 10

C. Station Outlet Requirements ................................


................................
................................
.......................
49
D.Faceplate Designations ................................
................................
................................
................................
. 50
E.Work Area Design Considerations ................................
................................
................................
................
51
Administrative Work Areas ................................
................................
................................
..........................
51
Conference54 EMC /Spa91E> BDCOBDC BT1 0 0 4......./ive D o02 689.1 Tm -0.006.58Tc[(................................)] TJET7

Initial Release November 26, 2012 TEST INDEX Page 8 of 61


Version 10

ADDENDUM 3. ..................................................................................................................................................... 61

Initial Release November 26, 2012 TEST INDEX Page 9 of 61


Version 10
Version 10

1.4 Qualifications of Subcontractors


All Information Transports Systems (ITS) Contractor or S

Initial Release November 26, 2012 TEST INDEX Page 11 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page


Version 10

time to validate the test results and insure that all testing is complete prior to placing copper
and fiber into service. All copper horizontal station cable and fiber optic cable testing will
comply with (TIA) ANSI/TIA/EIA-568-B.1 or (ISO) ISO/IEC 11801 Ed.2 Industry Standards, and be
done using a current, certified and calibrated Fluke test instrument. Copper tie-cables and OSP

Initial Release November 26, 2012 TEST INDEX Page 13 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page 14 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page 15 of 61


Version 10

Telecom Room Plan Example

Initial Release November 26, 2012 TEST INDEX Page 16 of 61


Version 10

E. Finishes

Initial Release November 26, 2012 TEST INDEX Page 17 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page 19 of 61


Version 10

Initial Release November 26, 2012


Version 10

4.0 PLUMBING
4.1 Piping Coordination through Telecommunications Rooms (EIA/TIA 569-A 8.2.5.2)
Piping and plumbing unrelated to telecom (other than what is required to support the room such as
chilled water supply/return) shall not be routed

Initial Release November 26, 2012 TEST INDEX Page 21 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page 2nitial Rei-8(e N)4(o)2Ib
Version 10

Initial Release November 26, 2012 TEST INDEX Page 24 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page 26 of 61


Version 10

Telecommunications Room (IDF /TR)

Initial Release November 26, 2012


TEST INDEX Page 29 of 61
Version 10

Initial Release November 26, 2012 TEST INDEX Page 30 of


Version 10

Initial Release November 26, 2012 TEST INDEX Page 31 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page 32 of 61


Version 10

4. A minimum of two four-inch conduits should be dedicated between a


telecommunications room and each (raised floor) computer lab or video facility
it serves.

Note:

Initial Release November 26, 2012 TEST INDEX Page 34 of 61


Version 10

2.

Initial Release November 26, 2012 TEST INDEX Page 35 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page 36 of 61


Version 10

To extend into a building beyond 50 ft., the conduit entering the wall or
concrete floor slab needs to be extended with IMC or RMC conduit. This
allows the entrance point to move from the wall or concrete slab. The
50-

Initial Release November 26, 2012 TEST INDEX Page 37 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page 39 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX


Version 10
Version 10

Initial Release November 26, 2012 TEST INDEX Page 42 of 61


Version 10

devices requires access to the horizontal cabling via a cord plugged into the telecommunicationl
outlet located within the work area.

A telecommunications outlet can support

Initial Release November 26, 2012 TEST INDEX Page 44 of 61


Version 10
Version 10

7.

Initial Release November 26, 2012 TEST INDEX Page 47 of 61


Version 10

Initial Release November 26, 2012 TEST INDEX Page 48 of 61


Version 10

11. Poer Meter Faceplate


For Poer Meter connections required in neer
buildings Contractor will place an Orange Jack in a
single port faceplate (Note: This is the only circuit
that will use a single port at Fresno State). If Poer
Meter is

Initial Release November 26, 2012 TEST INDEX Page 49 of 61


Version 10

If a large number of such outle 10ts are required, the designer should consider the use of cast
-in-
place floor boxes with feeder duct (Walkerduct) ser a-3() )-77(se3(mulsbTJ>>
)-tis )-pl(flo)-3
tsJETBT1 0 0 1 51777 53 bb

Initial Release November 26, 2012 TEST INDEX Page 50 of 61

place
6lace ETBT1/F510.98 Tf1 0 l
Version 10

Initial Release November 26, 2012 TEST INDEX Page 52 of 61


Version 10

Outlet Labeling
Each faceplate shall be labeled with ROOM, FACEPLATE NUMBER, and JACK position.
Example: 361.02A for each cable.

Initial Release November 26, 2012 TEST INDEX Page 53 of 61


Version 10
Version 10

11.0 VENDOR PROVIDED EQUIPMENT


11.1 General Information
All vendor provided equipment will be approved and use the campus standard and must be new, unopened, and
never purchased by another entity. Any equipment that is mounted on backboard s in MDFs, BDFs, or on
backboards, will have a demarc

Initial Release November 26, 2012 TEST INDEX Page 55 of 61


Version 10
Version 10

BDF/IDF Equipment Racks

Initial Release November 26, 2012 TEST INDEX Page 59 of 61

You might also like