You are on page 1of 16

Mukesh sap jokes..

Q1 you are creating a performance base manintenance plant.

What must you assign to the plan?

Note” there are 2 correct answer this question

a) A cycle unit of measure matching the characteristics assign to the measuring point
b) A start counter reading for scheduling
c) A technical object with a measuring point
d) A task list that has a performance base maintenance strategy assign

Q2 you want to customize the setting for functional location to map your technical assets in the
system

Which of the following do you have to define when creating a structure indicator?

Note “ there are 2 correct answer in this question

a) Edit mask √
b) Functional location category
c) Hierarchy levels √
d) Labelling system

Q3 While creating the measuring point for piece of equipment you unit cannot maintain the unit of
measure of the measuring point

What is the reason?

a) the unit of measure can only be entered during the creating of a measurement document
b) units of measure have not been configure for the measuring point category in customizing
c) the measuring point reference the unit of measure from the capacity header of the work
center assign to the point of equipment
e) the measuring point reference the unit of measure from the characteristics √

Q4 A production planner wants to display all pending maintenance order for a production planning
(PP) work center in the PP planning board

/what must you do to achieve this?

Note “ there are 2 correct answer in this question

A) set the system condition in the technical object master record


B) assign the PP capacity planner group to the maintenance work center.
f) Assign the PP work center to the technical object master record √
g) Set the system condition in the maintenance order header √
Q5 When is the maintenance order debited with actual overhead cost?

a) When the order is technically completed


b) When the order is settled
c) When you trigger the surcharge calculation
d) With each consumption posting

Q6 you want to configure the settings for time-based maintenance plans with the call object type
“maintenance order”

a) maintenance plant and activity type


b) maintenance planner group and activity type
c) planning plant and maintenance planner type
d) maintenance plant and main work center

Q7 Which of the following order type settings are plant independent?

Note “ there are 2 correct answer in this question

a) scheduling parameters √
b) number range √
c) material availbikity check
d) settlement profile

Q8 After parts have transferred to a subcontractor, which of the following defective parts in the SAP
ERP system?

a) A special storage location


b) A special batch number
c) A special condition based valuation type √
d) A special stock type

Q9 your customer wants to generate a cost estimate using the maintenance plan costing
transaction?

Which of the following costs can be determined?

Note “ there are 3 correct answer in this question

a) Cost for a specified period √


b) Cost for specified technical objects √
c) Cost for waiting planned dates
d) Cost for active maintenance dates √
e) Cost for skipped calls

Q10 Which of the following steps is mandatory for the cost update in the cost update in the
maintenance information (PMIS)

a) Assign value categories to cost key figures


b) Define update rules for the datasource
c) Assign update groups to PM order types
d) Select value categories for the costing sheet.

Q11.you want to define the organizational units for your maintenance department

Which of the following objects can you assign to a planning plant?

a) Maintenance work center


h) Maintenance planner group √
b) Location
c) Company code

Q12. What is the purpose of deadline monitoring?

a) To convert maintenance calls into notifications for a predefined period


b) To display a capacity overview for generated maintenance orders
c) To provide an overview of scheduled and manual call dates
d) To convert notifications into orders for a predefined period

Q13. Which of the following organizational units are mandatory to enable the integration of

Enterprise asset management and controlling?

Note: There are 2 correct answers to this question.

a) Business area
b) Profit center
c) Controlling area √
d) Cost centers

Q14. Which of the following business processes are serial numbers a prerequisite?

a) Tracking the warranty of a piece of equipment


b) Installing and dismantling pieces of equipment
c) Performing an internal refurbishment process√
d) Tracking material items as pieces of equipment√

Q15. You want the system to ignore the actual dates of a partially confirmed operation when

The maintenance order is scheduled manually. Which scheduling parameter must you set

Active in customizing?

a) Scheduling type
b) Adjust dates
c) Scheduling with breaks
d) Shift order √

Q16. What must you do to use mass changes for technical objects?

Note: there are 2 correct answer to this question.


a) Assign the relevant authorization object to users√
b) Active mass changes for the relevant categories for the equipment or functional location
c) Activate the relevant business function√
d) Active mass changed for the planning plant

Q17. What does a structure indicator define?

Note: There 2 correct answers to this question

a) The maximum Length of the functional location number


b) The hierarchy levels of the functional location structure√
c) The characters that are allowed for the functional location number√
d) The external number range for functional locations
e) The functional location category

Q18. Your customer wants to make sure that a piece of equipment with the status AVLB has

Passed testing prior installed in a functional location.

How can you achieve this?

Note: There are 2 correct answer to this question.

a) Customize the equipment category as test equipment and use the system status to control
The installation
b) Customize an appropriate status profile and assign it to the equipment catgory
c) Customize an appropriate status profile and assign it to the equipment master
d) Customize a permit category and assign it to the equipment category.

Q19. Which settings can you configure for a notification type in customizing?

Note: There are 3 correct answer to this question.

a) Maintenance activity type


b) Number range√
c) Partner determination profile√
d) Status profile√
e) Settlement rule

Q20. What must you do to use an internal refurbishment process?

Note: there are 2 correct answer to this question.

a) Create a special control key to use in the refurbishment operation. √


b) Create a specific order type for refurbishment. √
c) Create a specific maintenance activity type for refurbishment
d) Create a specific settlement profile for the purpose of refurbishment

Q21. In which maintenance business process can you use value categories?

a) Measurement document creation


b) Order settlement
c) Condition based material valuation
d) Order cost view √
Q22. Which of the following can you assign to the functional location category?

Note: There are 2 correct answers to this question.

a) Measuring point category√


b) Indicator for customer objects in a customer system√
c) Asset class
d) Indicator for configuration control data

Q23. You set status of a maintenance order to technically complete(TECO)

What is the result?

Note: There are 2 correct answer to this question

a) Operations can be added to the maintenance order


b) The settlement rule cannot be changed in the future
c) The order can still receive costs
d) Open reservations are closed

Q24. How can you change the layout of an equipment master record?

Note: There are 2 correct answer to this question.

a) Add additional business views to the equipment category√


b) Assign the view profile to the equipment category√
c) Assign the view profile to the equipment reference category
d) Assign the default catalog profile to the equipment reference category

Q25. How can you enter a time confirmation for a maintenance order?

a) Enter a final time confirmation at header level


b) Create a cross application time sheet√
c) Enter a technical confirmation
d) Set the status of the maintenance order to technically complete(TECO)

Q26. Which indicators can you set in customizing for assigning a task list to a maintenance

Order type?

Note: There are 2 correct answer to these question.

a) Production Resource/tools(PRT)
b) Work center
c) Material
d) Operation

Q27. Which object do you link to value categories while customizing a maintenance order type

a) Cost Center
b) Cost element√
c) Activity type
d) G/L account

Q28. You want to set up your maintenance work centers to monitor their work load.
Which of the following must you assign to the maintenance work center?

a) Maintenance planner group


b) Factory calender√
c) Control key
d) Capacity planner group

Q29. You want to dismantle equipment with simultaneous goods movement.

What are the prerequisites?

Note: There are 3 correct answer to this question.

a) The functional location master record must aloe the installation


b) The material assigned to the serial data tab must use spilt valuation√
c) The equipment category must allow the installation√
d) The category of functional locations must allow the installation
e) A serial number must be assigned to the serial data tab of the equipment master record√

Q30. Your customer wants to assign maintenance notification to maintenance order

Operations.

Which of the following Customizing steps must you perform to achieve this?

a) Set the indicator for notification data on order header data to active for the order type
and notification type combination.
b) Set up a control key that allows the assignment of notifications and use it in the
maintenance order operation
c) Assign the order type in the special notification parameters.
d) Set the indicator for enhanced object list functions to assignment of operations to all
object list entries active √

Q31. Which of the following objects have linear data related fields?

Note: There are 2 correct answers to this question

a) Task list
b) Object network√
c) Measuring point√
d) Material serial number

Q33. Your customer wants to serialize equipment.

Which customizing parameters can you use for serial number profiles?

Note: There are 3 correct answer to this question

a) Assignment to equipment category√


b) Determination of the material type assigned to the equipment category
c) Automatic synchronization to Asset Accounting
d) Automatic creation of serial numbers√
e) Determination of business transactions for which a serial number check is performed√

Q34. In your maintenance plan, the scheduling period is set to zero you want to schedule the
Maintenance plan via deadline monitoring and set the interval for call objects to zero

How does the system behave during scheduling?

a) A new planned date is added when the current waiting call is converted to a call object.
b) A new planned date is scheduled within the call horizon
c) A set of new call objects is generated for all maintenance plan outside the call horizon
d) A new call objects is generated outside the call horizon

Q35. How do you activate sub screens in customizing for equipment master data?

a) Create a view profile and assign thus profile to the equipment category√
b) Create a screen group and assign this group to the equipment category
c) Define the fields selection for equipment master records
d) Activate the classification active indicator when defining additional business view

Q36. You have configured a new labelling system and assigned alternative labels to the

Functional locations. However the old labels are still displayed in the display for the

Functional locations.

What can you do to display the new labels?

a) Make sure the new labels are entered in your logon language
b) Delete the labels in the old labelling system
c) Change the screen layout to include the alternative label field
d) Enter the new labelling system in your user profile√

Q37. What are the scheduling parameters for a strategy plan?

Note: There are 3 correct answer to this question

a) Time key date


b) Start in cycle
c) Offset
d) Strategy
e) Shift factor late completion

Q38. Where do you activate change documents for maintenance plans?

a) In the maintenance task list type customizing settings


b) In the maintenance plan category customizing settings
c) In the maintenance plant customizing settings
d) In the maintenance plan header

Q39. When does the system create a distribution rule for a maintenance order automatically?

Note: There are 2 correct answer to this question

a) After the maintenance order is set to technically complete


b) When the maintenance order is released√
c) When the maintenance order is set to technically complete√
d) Before the maintenance order is relased

Q40. What are prerequisities for using the measurement reading transfer function
a) The measuring points must be assigned to the same characteristic√
b) The characteristic assigned to the measuring points must be assigned to the same class
c) The code group assigned to the measuring points must be identical
d) The measuring points must have the same number of digits

Q41. Even though material has been issued against a maintenance order, the balance of the

Coast in the maintenance order is zero

What could be the reason?

a) The material was issued without reference to the reservation


b) The material was issued in the previous fiscal period
c) The operation to which the material is assigned has not been confirmed
d) The order had been settled

Q42. You want the system to display an error if you attempt to close or set the deletion flag

When the balance of the order is not zero

Which indicator must you set in the settlement profile?

a) The to be settled in full indicator


b) The 100% validation indicator
c) The amount settlement indicator
d) The variances to costing indicator

Q43. What is the result when performing a counter replacement?

a) The counter assigned to the technical object is replaced


b) The total counter reading of the measurement document stays the same
c) The technical object with the assigned defective counter is replaced
d) The total counter reading is reset is zero

Q44. You want to outsource a maintenance order operation for the operation you require the

Outside company to submit time sheets for approval what must you define?

a) A control key with the service parameter set


b) A control key with the confirmation parameter set
c) The parallelized confirmation processes
d) A default value profile for external procurement

Q45. What must you to create to process maintenance orders for external companies using

External work centers?

Note : There are 2 correct answers to this question

a) A cost center for the external company√


b) A catalog for external services?
c) An activity type for each charge rate√
d) A planner group for the external company

Q46. Which of the following is an element of an information structure?


a) Info source
b) Dimension
c) Characteristic
d) Class

Q47. To which objects can you assign personnel numbers?

Note: There are 2 correct answers to this question

a) Partners√
b) Work centers√
c) Task list operations
d) Individual capacities

Q48. You are configuring maintenance plan catgories in customizing

Which of the following settings can you make?

Note: There are 3 correct answer to this question

a) Maintenance activity type


b) External number range
c) Completion data
d) Call object
e) Planner group

Q49. Which objects can you assign to a maintenance order operation as a production

Resource tool(PRT)?

Note: There are 3 correct answers to this question

a) Material√
b) Functional point
c) Measuring point√
d) Equipment √
e) Serial number

Q50. What is a requirement for scheduling maintenance order operations?

a) The value for the duration in the order operation must be greater than 0
b) The performing work center must have a control key with the scheduling operations
Indicator set.
c) The value for the actual work in the order operation must be greater than 0
d) The order operation must have a control key with the scheduling operations indicator set

Q51. Which business functions do you have to set up when customizing the inspection control

Of the availability check for each combination of plant and order type?

a) Availability check during goods issue


Availability check during goods receipt
b) Availability check during order creation √
Availability check during order release
c) Material availability check
Production Resources/Tools (PRT)availability check
d) Material availability check
Capacity availability check

Q52. Which of the following objects can you assign to a maintenance work centermaster

Record?

Note: There are 2 correct answer to this question

a) Planner group
b) Task list usage√
c) Maintenance activity type
d) Capacity category√

Q53. You have created a new maintenance order type m customizing?

Which settings must you make to enable scheduling?

a) Assign scheduling parameters to the order type only


b) Assign a default value profile for general order data
c) Assign a calendar to the order type
d) Assign scheduling parameters to the combination of plant order type √

Q54. Which standard reports do you use to monitor spsre parts planning in ongoing

Maintenance orders?

Note: There are 2 correct answer to this question

a) Controlling reports for order


b) Material availability list
c) Order and operation list
d) Material where used list

Q55. For a multiple counter maintenance plan, where do you whether a maintenance order

Is created when all cycles are due or as soon as one cycle is due?

a) In the cycle set used in the maintenance plan


b) In the selection criteria of the deadline monitor
c) In the scheduling parameters of the maintenance plan
d) In the customizing settings of the maintenance plan category

Q56. For which fields can the system propose default values for the operation during the

Order confirmation?

Note: There are 3 correct answer to this question.

a) Goods movement for non stock items


b) Maintenance order settlement
c) Activities
d) Final confirmation
e) Start date
Q57. Which of the following operations can you perfomn for a maintenance order with the

Status technically complete(TECHO)?

Note: There are 3 correct answer to this question

a) Change settlement rules


b) Add new components
c) Change the responsible work centre
d) Debit the responsible order with additional actual costs
e) Perform businesss completion

Q58. What is the latest point in time you can configure the order settlement rule to be

Mandatory during order processing?

a) Before order settlement


b) Before technical completion
c) Before order release
d) At order creation

Q59. What is a prerequisite to settle a refurbishment order to the material stock?

a) The default account assignment in the settlement profile assigned to the order type
must be set to material.
b) The default account assignment in the settlement profile assigned to the order type
Must be set to the G/L account that is linked to the material.
c) The price control of the material to be refurbished must be set to moving average price
d) The price control of the material to be refurbished must be set to standard price

Q60. Why do you define maintenance assemblies of material type IBAU?

Note: There are 2 correct answer to this question

a) To track material from an inventory management perspective


b) To enable cost reporting in the plant Maintenance information system√
c) To combine similar materials under one node in Bill of material√
d) To enable a refurbishment process with spilt valuation

Q61. When a maintenance plan is used to create an order how can you prevent the order

From being released immediately?

Note: There are 2 correct answer to this question

a) Configure the order type to NOT release immediately√


b) Set the do not release immediately flag for the maintenance item√
c) Set the do not release immediately flag in the maintenance plan header
d) Configure the combination of order type and planning plant to NOT release immediately

Q62. Which of the following must you assign to use a cross plant planning scenario?

a) A planner group to multiple maintenance plants


b) A planner group to multiple planner plants
c) Multiple maintenance plants to a planning plant √
d) Multiple planning plants to a maintenance plant

Q63. To which maintenance object type can assign a user status profile?

a) Task list type


b) Measuring point category
c) Equipment category√
d) Maintenance plan category

Q64. You are customizing calibration orders for test equipment management

Which of the following actions are mandatory?

Note: There are 2 correct answer to this question

a) Assign the inspection type to the order type


b) Define inspection methods
c) Define an inspection point
d) Define follow up actions

Q65. For which objects can you default values in a maintenance order value profile?

Note: There are 2 correct answer to this question.

a) Material
b) Cost element √
c) G/L account
d) Purchasing group√

Q66. Which settlement receivers can you assign to a settlement profile?

Note: There are 2 correct answer to these question.

a) Equipment
b) Cost element
c) Material
d) G/L account

Q67. What can you do with a multiple counter plan?

Note: There are 2 correct answer to this question

a) Propose counter for the reference object based on the cycles entered
b) Use cycles of multiples dimensions
c) Use multiple time based counters
d) Assign a strategy for common dimensions

Q68. What do the initial and subsequent buffers in the preventative maintenance

Strategy determine?

a) The difference between the call date and the plan


b) The shifiting of the next call date based on the technically complete(TECO) date
c) The next maintenance for a maintenance order
Q69. What is the difference between a refurbishment order and a repair maintenance
order?

a) A refurbishment order is always created for one material/serial number combination. A


repair maintenance order can be created for non serialized materials
b) A refurbishment order is settled to different cost centers and a repair maintenance
order is NOT
c) A goods issue can be posted against a refurbishment order but NOT against a repair
maintenance order.
d) A goods receipt is posted against a refurbishment order but NOT against a repair
maintenance order.

Q70. After releasing a maintenance order you check the material availability list

What does a yellow traffic light indicate?

a) Stock material is available for the earliest date


b) Non-stock material is available for the earliest date
c) Non-stock material is available for the planner date
d) Non –stock material is available for the latest date

Q71. You want to define the search sequence for viewable files.

Which workstation application do you have to assign to the viual instructions viewing

Application?

a) AVI
b) JT
c) BMP
d) RH

Q72. What is the difference between the maintenance activity type and cost controlling(CO)

Activity type?

Note: There are 2 correct answer to this question

a) The maintenance activity type is used to calculate overhead costs


CO activity types are used to calculate operational costs
b) The maintenance activity type is defaulted from the maintenance plan
CO activity types are defaulted from the work center√
c) The maintenance activity type is used to post actual costs during order confirmation at
the header levels
CO activity types are used to post actual costs during order confirmation at the
operation level.
d) The maintenance activity types is maintained in the order header
CO activity types are maintained in the order operations.

Q73. Which of the following objects can you assign to an operation in a maintenance task

List?

Note:There are 3 correct answer to this question.


a) Visual instructions
b) Production Resources/tools(PRT)
c) Service packaged
d) Requirements profile
e) Serial numbers

Q74. If two maintenance packaged are due at the same time what parameter define which

Maintenance packaged is performed?

a) Cycle length
b) Hierarchy
c) Initial buffer
d) Offset

Q75. You want to create digital signatures for maintenance order operations.

Which parameters do you have to specify in customizing?

a) Order types and planner group


b) Order types and maintenance plant
c) Order types and planning plant
d) Order types and work center

Q76. To which of the following can you assign a maintenance activity types?

Note: There are 2 correct answer to this question

a) A maintenance order type


b) A technical object
c) A task list
d) A maintenance order operation

Q77. What are prerequisities to assign a task list to a time based maintenance plan?

Note: There are 2 correct answer to this question.

a) The same work center must be assigned to the task list header and the maintenance
Plan item
b) The task list and the maintenance plan item must be assigned to the same planner
group
c) The task list header must be assigned to the same maintenance strategy as the
maintenance plan header
d) The task list header and the maintenance plan item must be assigned to the same
planning plant

Q78. To which objects can you assign a responsible maintenance work center?

Note : There are 2 correct answer to this question.

a) The header of a task list√


b) The header of a bill of material
c) A maintenance item√
d) The maintenance plan header
Q79.where do you define the offset for the maintenance plan strategy?

a) In the maintenance plan category


b) In the maintenance plan scheduling parameters
c) In the maintenance item of the maintenance plan
d) In the maintenance package

Q80. Which steps must you perform to prepare a task list to use a maintenance strategy?

Note: there are 2 correct answer to this question.

a) Set a buffer for each maintenance package in the strategy


b) Assign a maintenance packages to task list operations√
c) Assign a maintenance strategy to the task list operations.
d) Assign a maintenance strategy to the task list header√

You might also like