Rainwater Management
The intent of this criterion is to manage rainwater efficiently such that post-construction storm
water run-off does not exceed the pre-construction run-off.
Need to Demonstrate the post-construction storm water run-off generated from the site is being
managed within the GRIHA project boundary as per Table 5.4 based on the peak hourly rainfall
(mm/h).
• Run off coefficient (like for tiled roof it is 0.75 & for concrete 0.70)
• Rainfall in given area (in mm)
• Surface area of roofs (in sq. Mt)
Requirements: -
• soil percolation test report highlighting the percolation rate of soil of the site.
• calculations using GRIHA rainwater management calculator.
• storm water drainage plan (.dwg format) for the site indicating the location of rainwater
storage tank or/and harvesting pit on-site.
• drawings (.dwg format) depicting cross-section and plan of rainwater storage tank or/and
harvesting pit on-site.