Professional Documents
Culture Documents
xlsx
LINK 2 775_email link.xlsm
LINK 3 775dc@tragsengineering.com_11.26.2020_Spare Part List NN-06-0004 , NN-04-0005 ,NN-04-000.msg
LINK 4 775dc@tragsengineering.com_11.28.2020_Main Power List.msg
LINK 5 775dc@tragsengineering.com_11.29.2020_775 Manpower List.msg
LINK 6 775dc@tragsengineering.com_11.29.2020_Mechanical RFIT-08 & Electrical RFIT-04.msg
LINK 7 775dc@tragsengineering.com_11.30.2020_Electrical RFIT-04 & 09.msg
LINK 8 775dc@tragsengineering.com_11.30.2020_SPARE PARTS LIST FOR STAND BY GENERATOR SET.msg
LINK 9 775dc@tragsengineering.com_12.01.2020_, BMSSCADA-13.msg
LINK 10 775dc@tragsengineering.com_12.01.2020_Electrical RFIT-04.msg
LINK 11 775dc@tragsengineering.com_12.01.2020_RE Electrical RFIT-04.msg
LINK 12 775dc@tragsengineering.com_12.01.2020_SPARE PARTS LIST UPS System, Public Address System.msg
LINK 13 775dc@tragsengineering.com_12.02.2020_Operation & Maintenance Manual .msg
LINK 14 775timekeeper@tragsengineering.com_11.26.2020_all.msg
LINK 15 775timekeeper@tragsengineering.com_11.26.2020_Daily Report .msg
LINK 16 775timekeeper@tragsengineering.com_11.26.2020_FW Delay in labor time sheet submission Job 783 D.
LINK 17 775timekeeper@tragsengineering.com_11.29.2020_All.msg
LINK 18 775timekeeper@tragsengineering.com_12.01.2020_RE Delete the entry .msg
LINK 19 abhivriddhi.hegde@dutcotennant.com_12.01.2020_RE Our Order # 20110229.msg
LINK 20 agnel@pacificocean.com.qa_01.25.2021_RE Payment update.msg
LINK 21 alam@tragsengineering.com_01.24.2021_Re 3-Ton Pickup with longer carrier.msg
LINK 22 alim.mohd@outlook.com_01.25.2021_Re Recommendation of Payment No. 27 - TRAGS.msg
LINK 23 antony.puthur91@gmail.com_12.03.2020_ACCESS CONTROL SYSTEM _ SPARE PART REV C.msg
LINK 24 ashok@cubelight.net_01.26.2021_RE Qatar Academy - Cycle track and Shade .msg
LINK 25 ASTAD letter - Working Hours - FIFA Club World Cup - Contractors Consultants (Road Closures).msg
LINK 26 AUD Buiding T&C RFIT- Followup.msg
LINK 27 azeem@gazzaoui.com.qa_12.01.2020_RE Req. Quotation for supply of Plumbing Valves -.msg
LINK 28 b.balaji@scaqatar.com_11.28.2020_RE FW REMINDER Pre As-built submittal required .msg
LINK 29 b.balaji@scaqatar.com_11.30.2020_OCS response sheet.msg
LINK 30 barwacamp@tragsengineering.com_01.25.2021_RE QAE-Final Exit Clearance of emp#25776.msg
LINK 31 biju.daniel@tragsengineering.com_11.30.2020_RE Auto Cad Operators - Re deployment..msg
LINK 32 biju.daniel@tragsengineering.com_11.30.2020_RE Auto Cad Operators - Re deployment._001.msg
LINK 33 biru@tragsengineering.com_11.26.2020_RE QAE- MR 97485 AND MR 97487 .msg
LINK 34 Chandramohan.V@astad.qa_11.30.2020_RE PHE Report Draft Copy.msg
LINK 35 dc782@tragsengineering.com_01.26.2021_MR- 98568 & Budget Sheet for G. I steel Welded Pip.msg
LINK 36 dc782@tragsengineering.com_01.27.2021_MR -98672.msg
LINK 37 dc784@tragsengineering.com_02.13.2021_783 SD LOG.msg
LINK 38 debug.log
LINK 39 Doha Bank Document.msg
LINK 40 e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Performance.msg
LINK 41 e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Performance_001.msg
LINK 42 e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Performance_002.msg
LINK 43 e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Performance_003.msg
LINK 44 e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Performance_004.msg
LINK 45 electrical@darwish-tdg.qa_02.15.2021_RE Our Order # PL 21020068.msg
LINK 46 employeerelations2@tragsengineering.com_01.24.2021_Employee's Departure Details.msg
LINK 47 employeerelations2@tragsengineering.com_01.25.2021_Employee's Departure Details.msg
LINK 48 Employee's Departure Details.msg
LINK 49 FW Allocation - 782 Mosque at Pearl Qatar.msg
LINK 50 FW Allocation - 782 Mosque at Pearl Qatar040221.msg
LINK 51 FW PUE- De-snagging.msg
LINK 52 FW QAE Auditorium Trainings and Snag Works.msg
LINK 53 FW QAE-ASTAD Comments on Discrimination Study Report for LV Panel .msg
LINK 54 FW QATAR ACADEMY EXPANSION (3).msg
LINK 55 FW QATAR ACADEMY EXPANSION (66).msg
LINK 56 Gerardo.Patawaran@astad.qa_11.29.2020_RE Reg O&M Manual Comments - Mechanical.msg
LINK 57 hr@tragsengineering.com_01.27.2021_RE Updated Time Sheet For SUPPLIER DRAFTMAN Md.Sh.msg
LINK 58 hr@tragsengineering.com_11.28.2020_Allocation - 783 Dukhan Facilities.msg
LINK 59 hr@tragsengineering.com_11.30.2020_RE Auto Cad Operators - Re deployment..msg
LINK 60 hr@tragsengineering.com_11.30.2020_RE Auto Cad Operators - Re deployment._001.msg
LINK 61 hr@tragsengineering.com_11.30.2020_RE Autocad - Operator - NAJCO .msg
LINK 62 hr@tragsengineering.com_12.01.2020_Allocation - 782 - Mosque at Pearl Qatar.msg
LINK 63 hr@tragsengineering.com_12.02.2020_Allocation - 782 - Mosque at Pearl Qatar.msg
LINK 64 hr@tragsengineering.com_12.02.2020_RE Allocation - 782 - Mosque at Pearl Qatar.msg
LINK 65 hse@tragsengineering.com_11.29.2020_Weekly Safety Tips.msg
LINK 66 ilham@tragsengineering.com_12.01.2020_Our Order # PL 20110229.msg
LINK 67 Irfan@kafood.com.qa_11.28.2020_RE Our Order # PL 20110184.msg
LINK 68 jayakanthanr@albalagh.com_11.30.2020_FW OCS - PROJECT EQUIPMENT LIST FOR PUE.msg
LINK 69 jharish@tragsengineering.com_01.25.2021_Reg QCDD Inspection.msg
LINK 70 jharish@tragsengineering.com_01.27.2021_RE Accounts Receivable Confirmation - Financial A.msg
LINK 71 jharish@tragsengineering.com_01.27.2021_RE Accounts Receivable Confirmation - Financial A_001.msg
LINK 72 jharish@tragsengineering.com_01.27.2021_RE QAE- SIBS REPORT.msg
LINK 73 jharish@tragsengineering.com_11.26.2020_MT-07-0005A - VOID.msg
LINK 74 jharish@tragsengineering.com_11.26.2020_MT07-0025 - VOID.msg
LINK 75 jharish@tragsengineering.com_11.26.2020_QFND300-DPML-0023.msg
LINK 76 jharish@tragsengineering.com_11.26.2020_RE OCS05-0072.msg
LINK 77 jharish@tragsengineering.com_11.26.2020_RE Spare Parts List Pre-Action System .msg
LINK 78 jharish@tragsengineering.com_11.26.2020_Reg MT & DPML.msg
LINK 79 jharish@tragsengineering.com_11.26.2020_Reg MT .msg
LINK 80 jharish@tragsengineering.com_11.28.2020_HVAC AS Built Drawings for Submission.msg
LINK 81 jharish@tragsengineering.com_11.28.2020_Reg MS1 & 2 Pending Document Schedule.msg
LINK 82 jharish@tragsengineering.com_11.28.2020_Reg As Built Submission.msg
LINK 83 jharish@tragsengineering.com_11.28.2020_Reg HVAC As Built.msg
LINK 84 jharish@tragsengineering.com_11.29.2020_O&M Manual - Chemical Dosing System - QAE.msg
LINK 85 jharish@tragsengineering.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Performance.msg
LINK 86 jharish@tragsengineering.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Performance_001.ms
LINK 87 jharish@tragsengineering.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Performance_002.ms
LINK 88 jharish@tragsengineering.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Performance_003.ms
LINK 89 jharish@tragsengineering.com_11.29.2020_Reg MS1 & 2 Pending Document Schedule .msg
LINK 90 jharish@tragsengineering.com_11.29.2020_Reg O&M Manual Comments - Mechanical.msg
LINK 91 jharish@tragsengineering.com_11.29.2020_Reg O&M Manual Comments on Solar Hot Water System.ms
LINK 92 jharish@tragsengineering.com_11.30.2020_need details.msg
LINK 93 jharish@tragsengineering.com_11.30.2020_QFND300-ALB-SC-05-0001 - VOID.msg
LINK 94 jharish@tragsengineering.com_11.30.2020_RE QAE - FCU PCB Board Issue in 1 No FCU.msg
LINK 95 jharish@tragsengineering.com_11.30.2020_Reg Draft Letter.msg
LINK 96 jharish@tragsengineering.com_11.30.2020_Reg Less Flow SF-AUD-02.msg
LINK 97 jharish@tragsengineering.com_11.30.2020_Reg QAE - Material Submittal Comments.msg
LINK 98 jharish@tragsengineering.com_11.30.2020_Reg QFND300-ALB-PR-05-0001 .msg
LINK 99 jharish@tragsengineering.com_11.30.2020_Reg Report.msg
LINK 100 jharish@tragsengineering.com_12.02.2020_RE OCS for SD-05-0403.msg
LINK 101 jharish@tragsengineering.com_12.02.2020_Reg Movable Scaffolding in Stage Area.msg
LINK 102 jilan.s@blueway-qatar.com_02.15.2021_RE Req. Quotation for supply , T&C of Water tank .msg
LINK 103 joby.s@fjtco.com_11.29.2020_RE Pressurizatio unit Vessel Factory Test Certifi.msg
LINK 104 jonaliza@samadhin.com_01.27.2021_Accounts Receivable Confirmation - Financial Audit.msg
LINK 105 jonaliza@samadhin.com_01.27.2021_Accounts Receivable Confirmation - Financial Audit_001.msg
LINK 106 Labeeb.Gondekar@astad.qa_11.30.2020_RE QAE- CCTV System Schematic Diagram .msg
LINK 107 mathewsales@salcoqatar.com_11.28.2020_Re Req. Quotation for supply of Plumbing Valves -.msg
LINK 108 mayazuddin@tragsengineering.com_01.24.2021_Precast Pannels for 2011-SF-Z3 for Review & Submis.m
LINK 109 mayazuddin@tragsengineering.com_01.25.2021_Precast Pannels for 2011-SF-Z1 for Review & Submis.m
LINK 110 mayazuddin@tragsengineering.com_01.25.2021_PRINT- A0(2-COPIES).msg
LINK 111 mayazuddin@tragsengineering.com_01.31.2021_RE Precast Pannels for 2011-ROOF(Z1-RF-01 & Z3-RF.m
LINK 112 mayazuddin@tragsengineering.com_02.14.2021_Requesting commented sheet for 2250 drainage..msg
LINK 113 mehtab@tragsengineering.com_02.15.2021_RE MR # 98852 Rubber Insulation.msg
LINK 114 misbauddin.mohammed@se.com_01.31.2021_RE AE50IA0024 OUTGOING TRANSMITTAL TO TRAGS R.m
LINK 115 misbauddin.mohammed@se.com_01.31.2021_RE AE50IA0024 OUTGOING TRANSMITTAL TO TRAGS R_
LINK 116 misbauddin.mohammed@se.com_11.26.2020_AE50IA0024 OUTGOING TRANSMITTAL TO TRAGS REF. .
LINK 117 misbauddin.mohammed@se.com_12.01.2020_AE50IA0024 OUTGOING TRANSMITTAL TO TRAGS REF. .
LINK 118 misbauddin.mohammed@se.com_12.01.2020_AE50IA0024 OUTGOING TRANSMITTAL TO TRAGS REF. _
LINK 119 mohammed.m@albalagh.com_12.02.2020_Fw Access Permit for Fire Fault Rectification - G.msg
LINK 120 MR Code # 98908.msg
LINK 121 nihal@tragsengineering.com_01.26.2021_RE QAE- MR 98606.msg
LINK 122 nihal@tragsengineering.com_02.01.2021_PL 21010080.msg
LINK 123 nihal@tragsengineering.com_11.26.2020_FW QAE- MR 97485 AND MR 97487 .msg
LINK 124 nihal@tragsengineering.com_11.26.2020_RE QAE- MR 97485 AND MR 97487 .msg
LINK 125 nihal@tragsengineering.com_11.29.2020_RE Our Order # PL 20110184.msg
LINK 126 nihal@tragsengineering.com_12.02.2020_Our Order # PL 20110215.msg
LINK 127 Our Order # PL 21020006.msg
LINK 128 PDC MEP KEYS.msg
LINK 129 praveen.mohan@albalagh.com_11.29.2020_RE Reg MS1 & 2 Pending Document Schedule.msg
LINK 130 praveen.mohan@albalagh.com_12.01.2020_RE Reg MS1 & 2 Pending Document Schedule.msg
LINK 131 praveen.vm@rhc-qatar.com_11.28.2020_RE Req. Quotation for supply of Fire Valves and .msg
LINK 132 procurement1@tragsengineering.com_02.02.2021_MR Code # 97826.msg
LINK 133 procurement1@tragsengineering.com_11.29.2020_MR Code # 97523.msg
LINK 134 procurement1@tragsengineering.com_12.01.2020_MR Code # 97567.msg
LINK 135 procurement1@tragsengineering.com_12.01.2020_MR Code # 97570.msg
LINK 136 procurement1@tragsengineering.com_12.01.2020_MR Code # 97572.msg
LINK 137 QAE- AL Balagh Letter ref# QFND300-ALB-TRAGS-LR-0323 (Certificate of Completion (Coe) - Auditorium B
LINK 138 QAE- ASTAD Comments Approval on Pre As built and As built drawing submittals.msg
LINK 139 QAE- Daily Progress Report (1).msg
LINK 140 QAE- Daily Progress Report.msg
LINK 141 QAE- Leave application of emp#966 Ashi Vattoli Parambil.msg
LINK 142 QAE- MR 98606.msg
LINK 143 QAE- MR 98726.msg
LINK 144 QAE- MR 98908.msg
LINK 145 QAE- PLC SCADA & BMS LOG.msg
LINK 146 QAE- SIBS REPORT.msg
LINK 147 qae@tragsengineering.com_02.02.2021_QAE- Daily Progress Report.msg
LINK 148 qae@tragsengineering.com_02.08.2021_ QAE- Daily Progress Report.msg
LINK 149 qae@tragsengineering.com_02.08.2021_RE QAE- MR 98606.msg
LINK 150 qae@tragsengineering.com_02.10.2021_ QAE- Daily Progress Report.msg
LINK 151 qae@tragsengineering.com_02.11.2021_ QAE- Daily Progress Report.msg
LINK 152 qae@tragsengineering.com_02.13.2021_QAE- Daily Progress Report.msg
LINK 153 qae@tragsengineering.com_02.14.2021_ Mosque at Pearl Qatar - MR 98968.msg
LINK 154 qae@tragsengineering.com_02.14.2021_ QAE- Daily Progress Report-13-02-2021.msg
LINK 155 qae@tragsengineering.com_02.14.2021_FW KIfyath Ullah (ID No;25386),Electrical CH.msg
LINK 156 qae@tragsengineering.com_02.14.2021_FW KIfyath Ullah (ID No;25386),Electrical CH_001.msg
LINK 157 qae@tragsengineering.com_02.14.2021_FW RFIT AUD DDC-0001 T&C Dated 15th Feb 2021.msg
LINK 158 qae@tragsengineering.com_02.14.2021_QAE- MR 98998.msg
LINK 159 qae@tragsengineering.com_02.14.2021_QAE- RFIT no. QFND300-ALB-RFIT-13-0108..msg
LINK 160 qae@tragsengineering.com_02.14.2021_RE RFIT AUD DDC-0001 T&C Dated 15th Feb 2021.msg
LINK 161 qae@tragsengineering.com_02.15.2021_QAE- Daily Progress Report-14-02-2021.msg
LINK 162 qae@tragsengineering.com_11.30.2020_RE QAE-ASTAD Comments Approval on Material Sub.msg
LINK 163 qae@tragsengineering.com_11.30.2020_RE QAE-ASTAD Comments Approval on Pre As Built.msg
LINK 164 QAE-ASTAD Comments Approval on Pre As Built and As Built drawing submittals .msg
LINK 165 QAE-ASTAD Comments Approval on RFITs .msg
LINK 166 QAE-ASTAD Comments on Discrimination Study Report for LV Panel .msg
LINK 167 qaproject@albalagh.com_01.24.2021_QFND300-ALB-SD-05-0101-B1 Missing sht 4 & OCS.msg
LINK 168 qaproject@albalagh.com_01.24.2021_RE QFND300-ALB-SD-05-0101-B1 Missing sht 4 & OCS.msg
LINK 169 qaproject@albalagh.com_01.25.2021_OCS TRAGS Submittal.msg
LINK 170 qaproject@albalagh.com_01.25.2021_Request for update in EDRMS - AS-BUILT submittal.msg
LINK 171 qaproject@albalagh.com_01.25.2021_Request for update in EDRMS - AS-BUILT submittal_001.msg
LINK 172 qaproject@albalagh.com_01.25.2021_Return RLM submittal.msg
LINK 173 qaproject@albalagh.com_01.27.2021_ASTAD letter - ASTAD-APM-PM- CONTRACTORS-CONSULTA.msg
LINK 174 qaproject@albalagh.com_01.27.2021_Missing submittal QFND300-ALB-SD-05-0107 B2.msg
LINK 175 qaproject@albalagh.com_01.27.2021_OCS TRAGS Submittal.msg
LINK 176 qaproject@albalagh.com_01.27.2021_OCS TRAGS Submittal_001.msg
LINK 177 qaproject@albalagh.com_02.02.2021_OCS TRAGS Submittal.msg
LINK 178 qaproject@albalagh.com_11.26.2020_RFIT-08-0072.msg
LINK 179 qaproject@albalagh.com_11.27.2020_OCS response for clarification.msg
LINK 180 qaproject@albalagh.com_11.28.2020_RE REMINDER Pre As-built submittal required upda.msg
LINK 181 qaproject@albalagh.com_11.28.2020_REMINDER As-built required update QFND300-ALB-SD-.msg
LINK 182 qaproject@albalagh.com_11.28.2020_REMINDER As-built submittal required update QFND3.msg
LINK 183 qaproject@albalagh.com_11.28.2020_REMINDER Pre As-built submittal required update Q.msg
LINK 184 qaproject@albalagh.com_11.29.2020_OCS.msg
LINK 185 qaproject@albalagh.com_11.30.2020_NCR-0059.msg
LINK 186 qaproject@albalagh.com_11.30.2020_OCS TRAGS Submittal.msg
LINK 187 qaproject@albalagh.com_11.30.2020_OCS TRAGS Submittal_001.msg
LINK 188 qaproject@albalagh.com_11.30.2020_Request for update in EDRMS - RSPL submittal.msg
LINK 189 qaproject@albalagh.com_12.01.2020_Incomplete submittal missing CCS.msg
LINK 190 qaproject@albalagh.com_12.01.2020_OCS.msg
LINK 191 qaproject@albalagh.com_12.01.2020_Payment Recommendation No. 24.msg
LINK 192 qaproject@albalagh.com_12.01.2020_RFIT Replied 30-Nov-20 .msg
LINK 193 qaproject@albalagh.com_12.02.2020_DIR & RFIT Replied 02-Dec-20 .msg
LINK 194 qaproject@albalagh.com_12.02.2020_OCS TRAGS Submittal.msg
LINK 195 qaproject@albalagh.com_12.02.2020_RE OCS TRAGS Submittal.msg
LINK 196 qayoom@tragsengineering.com_01.25.2021_Gulf Lights Electrical Engineering WLL LC Invoice .msg
LINK 197 qs@tragsengineering.com_02.14.2021_RE Dukhan Facilities- EX-01-Rev-00 - Additional R.msg
LINK 198 Quote of the week from HR team.msg
LINK 199 rajeshv@albalagh.com_11.28.2020_Al Balagh, Qatar Academy Expansion Project - Storm.msg
LINK 200 Re QAE- Transportation for Over Time workers .msg
LINK 201 RE Accounts Receivable Confirmation - Financial Audit 2020.msg
LINK 202 RE Firestop Insulation Technologies WLL Invoice Nos 20106 20107 for Qatar Academy Expansion.msg
LINK 203 RE Gulf Lights Electrical Engineering WLL LC Invoice No 34319 for Qatar Academy Expasion - Main Works
LINK 204 RE Honeywell Technoloy Solutions Qatar Invoice No I-25122020-805 for Qatar Academy Expansion.msg
LINK 205 RE MN submittal required update QFND300-ALB-MN-13-0004.msg
LINK 206 RE MOM for CCTV-PA-QSoftofferELV system.msg
LINK 207 RE MS1- De-snagging.msg
LINK 208 RE MS1 Warranty Register and Spare Parts Datasheets.msg
LINK 209 RE Our Order # 20110229.msg
LINK 210 RE QAE - Offer.msg
LINK 211 RE QAE-ASTAD Comments Approval on method statement pre as built drawing and remark up drawing
LINK 212 RE Susin Qatar Trading & Contracting WLL Invoice No 0035A 19 for Qatar Academy Expansion.msg
LINK 213 reception@tragsengineering.com_11.29.2020_Signed Budget and MR .msg
LINK 214 reception@tragsengineering.com_11.30.2020_QAE Project - Staff and Workers .msg
LINK 215 reception@tragsengineering.com_11.30.2020_Signed Budget and MR .msg
LINK 216 reception@tragsengineering.com_11.30.2020_Signed Budget and MR _001.msg
LINK 217 reception@tragsengineering.com_12.01.2020_Signed Budget and MR .msg
LINK 218 recruitment2@tragsengineering.com_11.30.2020_Requirement of PCs for AutoCAD Operator.msg
LINK 219 Reg QAE - PDC QCDD Inspection.msg
LINK 220 rikas9389@gmail.com_12.01.2020_Vo's.msg
LINK 221 sachin.shinde@tragsengineering.com_02.03.2021_AUD Buiding T&C RFIT- Followup.msg
LINK 222 sachin.shinde@tragsengineering.com_02.03.2021_AUD Buiding T&C RFIT- Followup_001.msg
LINK 223 sachin.shinde@tragsengineering.com_02.03.2021_FW PUE- De-snagging.msg
LINK 224 sachin.shinde@tragsengineering.com_02.03.2021_RE MS1- De-snagging.msg
LINK 225 sachin.shinde@tragsengineering.com_02.03.2021_RE MS1- De-snagging_001.msg
LINK 226 sales@spectrawll.com_11.26.2020_Offer from Diamond Dukhan Facilities Project C-1.msg
LINK 227 senthilk@tragsengineering.com_01.25.2021_FW QAE AUDITORIUM BUILDING _ QCDD INSPECTION 27 J.
LINK 228 senthilk@tragsengineering.com_01.31.2021_FW FTC Qatar Invoice Nos.SI21-0098,SI21-0113 for .msg
LINK 229 senthilk@tragsengineering.com_02.04.2021_Mechanical draftsman Request for JOB 784 – Urgent.msg
LINK 230 senthilk@tragsengineering.com_11.26.2020_FW Req. Quotation for supply of Plumbing Valves -.msg
LINK 231 senthilk@tragsengineering.com_11.26.2020_Req. Quotation for supply of Plumbing Valves - Pro.msg
LINK 232 senthilk@tragsengineering.com_11.26.2020_Req. Quotation for supply of Plumbing Valves - Pro_001.ms
LINK 233 senthilk@tragsengineering.com_11.26.2020_Req. Quotation for supply of Plumbing Valves - Pro_002.ms
LINK 234 senthilk@tragsengineering.com_11.26.2020_Req. Quotation for supply of Plumbing Valves - Pro_003.ms
LINK 235 senthilk@tragsengineering.com_11.28.2020_RE QAE- MR 97485 AND MR 97487 .msg
LINK 236 senthilk@tragsengineering.com_11.28.2020_RE Req. Quotation for supply of Fire Valves and .msg
LINK 237 senthilk@tragsengineering.com_11.28.2020_Req. Quotation for supply of Fire Valves and Acce.msg
LINK 238 senthilk@tragsengineering.com_11.30.2020_RE QAE- MR 97485 AND MR 97487 .msg
LINK 239 senthilk@tragsengineering.com_11.30.2020_Req. Quotation for supply of Floor Drain - Proj.msg
LINK 240 shoeba@tragsengineering.com_01.27.2021_BUDGET COMPARISON SHEET FOR ACOUSTIC LINEAR INSUL
LINK 241 siva.chandran@act-grp.com_02.04.2021_RE 2011 - Fabrication Drawings for approval.msg
LINK 242 siva.chandran@act-grp.com_02.13.2021_4519 - Precast MEP Incorporations .msg
LINK 243 siva.chandran@act-grp.com_02.13.2021_4520-21 Block wall MEP openings .msg
LINK 244 suraj.noronha@medgulfconstruction.com_11.30.2020_RE Requirement of PCs for AutoCAD Operator.m
LINK 245 suraj.noronha@medgulfconstruction.com_12.02.2020_RE Dukhan Facilities- IT Request..msg
LINK 246 syeda@tragsengineering.com_02.14.2021_Request for update on Our Order # PL 21010233.msg
LINK 247 syeda@tragsengineering.com_02.15.2021_Material Submittal for Bodet Clock System Style 10.msg
LINK 248 talib@catalmalki.com_12.02.2020_RE O&M Manual Comments on Solar Hot Water System .msg
LINK 249 teodolfo.tano@albalagh.com_11.28.2020_Re QAE- TRAGS letter ref# 775TC0707VP20 (Paym.msg
LINK 250 tragspayroll@tragsengineering.com_12.01.2020_Labor Time Sheets For The Month of Nov-2020.msg
LINK 251 traininganddevelopment@tragsengineering.com_11.29.2020_Quote of the week from HR team.msg
LINK 252 transport@tragsengineering.com_11.29.2020_RE QAE Site Driver 7 seat Van Under Repairing. .msg
LINK 253 transport@tragsengineering.com_11.29.2020_RE QAE Site Driver 7 seat Van Under Repairing. _001.msg
LINK 254 ukcredit.control.vwrs@gmail.com_12.02.2020_Fw Unpaid Invoices.msg
LINK 255 vegender@tragsengineering.com_01.24.2021_FW Delay of Staff Time Sheet Submission for the m.msg
LINK 256 vegender@tragsengineering.com_01.25.2021_QCDD inspection- Auditorium.msg
LINK 257 vegender@tragsengineering.com_01.25.2021_RE Payment update.msg
LINK 258 vegender@tragsengineering.com_01.25.2021_RE Qatar Academy - Cycle track and Shade .msg
LINK 259 vegender@tragsengineering.com_11.26.2020_.msg
LINK 260 vegender@tragsengineering.com_11.26.2020_FW Revised Budget sheet -PVC conduit & GI Conduit.msg
LINK 261 vegender@tragsengineering.com_11.28.2020_FW MATERIAL SUBMITTAL.msg
LINK 262 vegender@tragsengineering.com_11.28.2020_FW QUOTATION RFQ # MR-783-AP.msg
LINK 263 vegender@tragsengineering.com_11.29.2020_FW (C-108-01) Approved Material Submittals (MAR- .msg
LINK 264 vegender@tragsengineering.com_11.29.2020_FW (C-108-01) Approved Material Submittals (MAR- _001
LINK 265 vegender@tragsengineering.com_11.29.2020_FW Dukhan Facilities 201120252250 (Safety Induc.msg
LINK 266 vegender@tragsengineering.com_12.01.2020_FW MR - Printer For Mosque @ Pearl.msg
LINK 267 vegender@tragsengineering.com_12.01.2020_FW Stationary Request - Pearl Qatar.msg
LINK 268 vegender@tragsengineering.com_12.01.2020_RE Allocation - 782 - Mosque at Pearl Qatar.msg
LINK 269 vegender@tragsengineering.com_12.02.2020_quote-storm water.msg
LINK 270 vegender@tragsengineering.com_12.02.2020_RE Allocation - 782 - Mosque at Pearl Qatar.msg
LINK 271 vegender@tragsengineering.com_12.02.2020_RE IP module for CBS -Easi chek.msg
LINK 272 vijaykumar@tragsengineering.com_01.24.2021_Budget For CCTV +TelData Structured Cabling Syste.msg
LINK 273 vijaykumar@tragsengineering.com_01.26.2021_FW dhaneesh8483@gmail.com sent you files via WeTr.m
N-04-0005 ,NN-04-000.msg
l RFIT-04.msg
BY GENERATOR SET.msg
o. 27 - TRAGS.msg
ARE PART REV C.msg
ce of emp#25776.msg
e deployment..msg
e deployment._001.msg
erformance.msg
erformance_001.msg
erformance_002.msg
erformance_003.msg
erformance_004.msg
rture Details.msg
rture Details.msg
ts - Mechanical.msg
ER DRAFTMAN Md.Sh.msg
ment._001.msg
earl Qatar.msg
System .msg
bmission.msg
ent Schedule.msg
ng System - QAE.msg
Fan Non Performance.msg
Fan Non Performance_001.msg
Fan Non Performance_002.msg
Fan Non Performance_003.msg
ent Schedule .msg
- Mechanical.msg
on Solar Hot Water System.msg
in 1 No FCU.msg
Comments.msg
age Area.msg
C of Water tank .msg
Financial Audit.msg
Financial Audit_001.msg
Diagram .msg
of Plumbing Valves -.msg
-SF-Z3 for Review & Submis.msg
-SF-Z1 for Review & Submis.msg
ument Schedule.msg
ument Schedule.msg
Fire Valves and .msg
ompletion (Coe) - Auditorium Building ).msg
2-2021.msg
lectrical CH.msg
lectrical CH_001.msg
ed 15th Feb 2021.msg
T-13-0108..msg
d 15th Feb 2021.msg
BUILT submittal.msg
BUILT submittal_001.msg
NTRACTORS-CONSULTA.msg
-05-0107 B2.msg
l required upda.msg
e QFND300-ALB-SD-.msg
ed update QFND3.msg
quired update Q.msg
L submittal.msg
Project - Storm.msg
ar Academy Expansion.msg
ademy Expasion - Main Works.msg
atar Academy Expansion.msg
AutoCAD Operator.msg
Followup.msg
Followup_001.msg
Project C-1.msg
ING _ QCDD INSPECTION 27 J.msg
21-0098,SI21-0113 for .msg
est for JOB 784 – Urgent.msg
y of Plumbing Valves -.msg
Plumbing Valves - Pro.msg
Plumbing Valves - Pro_001.msg
Plumbing Valves - Pro_002.msg
Plumbing Valves - Pro_003.msg
783-AP.msg
aterial Submittals (MAR- .msg
aterial Submittals (MAR- _001.msg
0252250 (Safety Induc.msg
e @ Pearl.msg
arl Qatar.msg
ue at Pearl Qatar.msg
ue at Pearl Qatar.msg
a Structured Cabling Syste.msg
l.com sent you files via WeTr.msg
D:\DC775\Emails\ QAE- Daily Progress Report.msg
D:\DC775\Emails\ QAE- RFI no QFND300LB-RFI-04-0070 and QFND300LB-RFI-04-0071.msg
D:\DC775\Emails\ QAE- TRAGS letter ref# 775 TC 0732 VP 21 (Certificate of Completion for P
D:\DC775\Emails\ QAE-ASTAD Comments Approval on Pre As built drawing and Built Draw
D:\DC775\Emails\ QAE- ASTAD Comments Approval on O& M Manual Submittals .msg
D:\DC775\Emails\ QAE- ASTAD Comments Approval on O& M Manual Submittals130221 .ms
D:\DC775\Emails\ QAE- ASTAD Comments Approval on Pre As Built and As Built Drawing sub
D:\DC775\Emails\ QAE- Daily Progress Report.msg
D:\DC775\Emails\ QAE- TRAGS letter ref# 775 TC 0733 VP 21 (Certificate of Completion for Au
D:\DC775\Emails\ QAE-ASTAD Comments Approval on DIR.msg
D:\DC775\Emails\ QAE-TRAGS letter ref# 775 TC 0730 VP 20 (Payment Application No 29 Rev
D:\DC775\Emails\ QAE- ASTAD Comments Approval on O&M Manual Submittals.msg
D:\DC775\Emails\ QAE- Daily Progress Report.msg
D:\DC775\Emails\ QAE-ASTAD Comments Approval on Pre As built drawing and Built Drawin
D:\DC775\Emails\1)775_email link.xlsx
D:\DC775\Emails\775_email link.xlsm
D:\DC775\Emails\775dc@tragsengineering.com_11.26.2020_Spare Part List NN-06-0004 , NN
D:\DC775\Emails\775dc@tragsengineering.com_11.28.2020_Main Power List.msg
D:\DC775\Emails\775dc@tragsengineering.com_11.29.2020_775 Manpower List.msg
D:\DC775\Emails\775dc@tragsengineering.com_11.29.2020_Mechanical RFIT-08 & Electrical
D:\DC775\Emails\775dc@tragsengineering.com_11.30.2020_Electrical RFIT-04 & 09.msg
D:\DC775\Emails\775dc@tragsengineering.com_11.30.2020_SPARE PARTS LIST FOR STAND B
D:\DC775\Emails\775dc@tragsengineering.com_12.01.2020_, BMSSCADA-13.msg
D:\DC775\Emails\775dc@tragsengineering.com_12.01.2020_Electrical RFIT-04.msg
D:\DC775\Emails\775dc@tragsengineering.com_12.01.2020_RE Electrical RFIT-04.msg
D:\DC775\Emails\775dc@tragsengineering.com_12.01.2020_SPARE PARTS LIST UPS System,
D:\DC775\Emails\775dc@tragsengineering.com_12.02.2020_Operation & Maintenance Manu
D:\DC775\Emails\775timekeeper@tragsengineering.com_11.26.2020_all.msg
D:\DC775\Emails\775timekeeper@tragsengineering.com_11.26.2020_Daily Report .msg
D:\DC775\Emails\775timekeeper@tragsengineering.com_11.26.2020_FW Delay in labor time
D:\DC775\Emails\775timekeeper@tragsengineering.com_11.29.2020_All.msg
D:\DC775\Emails\775timekeeper@tragsengineering.com_12.01.2020_RE Delete the entry .m
D:\DC775\Emails\abhivriddhi.hegde@dutcotennant.com_12.01.2020_RE Our Order # 201102
D:\DC775\Emails\agnel@pacificocean.com.qa_01.25.2021_RE Payment update.msg
D:\DC775\Emails\alam@tragsengineering.com_01.24.2021_Re 3-Ton Pickup with longer carri
D:\DC775\Emails\alim.mohd@outlook.com_01.25.2021_Re Recommendation of Payment No
D:\DC775\Emails\antony.puthur91@gmail.com_12.03.2020_ACCESS CONTROL SYSTEM _ SPA
D:\DC775\Emails\ashok@cubelight.net_01.26.2021_RE Qatar Academy - Cycle track and Shad
D:\DC775\Emails\ASTAD letter - Working Hours - FIFA Club World Cup - Contractors Consult
D:\DC775\Emails\AUD Buiding T&C RFIT- Followup.msg
D:\DC775\Emails\azeem@gazzaoui.com.qa_12.01.2020_RE Req. Quotation for supply of Plum
D:\DC775\Emails\b.balaji@scaqatar.com_11.28.2020_RE FW REMINDER Pre As-built submitta
D:\DC775\Emails\b.balaji@scaqatar.com_11.30.2020_OCS response sheet.msg
D:\DC775\Emails\barwacamp@tragsengineering.com_01.25.2021_RE QAE-Final Exit Clearanc
D:\DC775\Emails\biju.daniel@tragsengineering.com_11.30.2020_RE Auto Cad Operators - Re
D:\DC775\Emails\biju.daniel@tragsengineering.com_11.30.2020_RE Auto Cad Operators - Re
D:\DC775\Emails\biru@tragsengineering.com_11.26.2020_RE QAE- MR 97485 AND MR 9748
D:\DC775\Emails\Chandramohan.V@astad.qa_11.30.2020_RE PHE Report Draft Copy.msg
D:\DC775\Emails\dc782@tragsengineering.com_01.26.2021_MR- 98568 & Budget Sheet for G
D:\DC775\Emails\dc782@tragsengineering.com_01.27.2021_MR -98672.msg
D:\DC775\Emails\dc784@tragsengineering.com_02.13.2021_783 SD LOG.msg
D:\DC775\Emails\debug.log
D:\DC775\Emails\Doha Bank Document.msg
D:\DC775\Emails\e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Per
D:\DC775\Emails\e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Per
D:\DC775\Emails\e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Per
D:\DC775\Emails\e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Per
D:\DC775\Emails\e.tabaa@qifem.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fan Non Per
D:\DC775\Emails\electrical@darwish-tdg.qa_02.15.2021_RE Our Order # PL 21020068.msg
D:\DC775\Emails\employeerelations2@tragsengineering.com_01.24.2021_Employee's Depar
D:\DC775\Emails\employeerelations2@tragsengineering.com_01.25.2021_Employee's Depar
D:\DC775\Emails\Employee's Departure Details.msg
D:\DC775\Emails\FW Allocation - 782 Mosque at Pearl Qatar.msg
D:\DC775\Emails\FW Allocation - 782 Mosque at Pearl Qatar040221.msg
D:\DC775\Emails\FW PUE- De-snagging.msg
D:\DC775\Emails\FW QAE Auditorium Trainings and Snag Works.msg
D:\DC775\Emails\FW QAE-ASTAD Comments on Discrimination Study Report for LV Panel .ms
D:\DC775\Emails\FW QATAR ACADEMY EXPANSION (3).msg
D:\DC775\Emails\FW QATAR ACADEMY EXPANSION (66).msg
D:\DC775\Emails\Gerardo.Patawaran@astad.qa_11.29.2020_RE Reg O&M Manual Comment
D:\DC775\Emails\hr@tragsengineering.com_01.27.2021_RE Updated Time Sheet For SUPPLIE
D:\DC775\Emails\hr@tragsengineering.com_11.28.2020_Allocation - 783 Dukhan Facilities.m
D:\DC775\Emails\hr@tragsengineering.com_11.30.2020_RE Auto Cad Operators - Re deploym
D:\DC775\Emails\hr@tragsengineering.com_11.30.2020_RE Auto Cad Operators - Re deploym
D:\DC775\Emails\hr@tragsengineering.com_11.30.2020_RE Autocad - Operator - NAJCO .msg
D:\DC775\Emails\hr@tragsengineering.com_12.01.2020_Allocation - 782 - Mosque at Pearl Q
D:\DC775\Emails\hr@tragsengineering.com_12.02.2020_Allocation - 782 - Mosque at Pearl Q
D:\DC775\Emails\hr@tragsengineering.com_12.02.2020_RE Allocation - 782 - Mosque at Pea
D:\DC775\Emails\hse@tragsengineering.com_11.29.2020_Weekly Safety Tips.msg
D:\DC775\Emails\ilham@tragsengineering.com_12.01.2020_Our Order # PL 20110229.msg
D:\DC775\Emails\Irfan@kafood.com.qa_11.28.2020_RE Our Order # PL 20110184.msg
D:\DC775\Emails\jayakanthanr@albalagh.com_11.30.2020_FW OCS - PROJECT EQUIPMENT L
D:\DC775\Emails\jharish@tragsengineering.com_01.25.2021_Reg QCDD Inspection.msg
D:\DC775\Emails\jharish@tragsengineering.com_01.27.2021_RE Accounts Receivable Confirm
D:\DC775\Emails\jharish@tragsengineering.com_01.27.2021_RE Accounts Receivable Confirm
D:\DC775\Emails\jharish@tragsengineering.com_01.27.2021_RE QAE- SIBS REPORT.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.26.2020_MT-07-0005A - VOID.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.26.2020_MT07-0025 - VOID.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.26.2020_QFND300-DPML-0023.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.26.2020_RE OCS05-0072.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.26.2020_RE Spare Parts List Pre-Action S
D:\DC775\Emails\jharish@tragsengineering.com_11.26.2020_Reg MT & DPML.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.26.2020_Reg MT .msg
D:\DC775\Emails\jharish@tragsengineering.com_11.28.2020_HVAC AS Built Drawings for Sub
D:\DC775\Emails\jharish@tragsengineering.com_11.28.2020_Reg MS1 & 2 Pending Docume
D:\DC775\Emails\jharish@tragsengineering.com_11.28.2020_Reg As Built Submission.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.28.2020_Reg HVAC As Built.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.29.2020_O&M Manual - Chemical Dosin
D:\DC775\Emails\jharish@tragsengineering.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fa
D:\DC775\Emails\jharish@tragsengineering.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fa
D:\DC775\Emails\jharish@tragsengineering.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fa
D:\DC775\Emails\jharish@tragsengineering.com_11.29.2020_RE Reg EF-ERU-PDC-02 - QAE Fa
D:\DC775\Emails\jharish@tragsengineering.com_11.29.2020_Reg MS1 & 2 Pending Documen
D:\DC775\Emails\jharish@tragsengineering.com_11.29.2020_Reg O&M Manual Comments -
D:\DC775\Emails\jharish@tragsengineering.com_11.29.2020_Reg O&M Manual Comments o
D:\DC775\Emails\jharish@tragsengineering.com_11.30.2020_need details.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.30.2020_QFND300-ALB-SC-05-0001 - VO
D:\DC775\Emails\jharish@tragsengineering.com_11.30.2020_RE QAE - FCU PCB Board Issue i
D:\DC775\Emails\jharish@tragsengineering.com_11.30.2020_Reg Draft Letter.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.30.2020_Reg Less Flow SF-AUD-02.msg
D:\DC775\Emails\jharish@tragsengineering.com_11.30.2020_Reg QAE - Material Submittal C
D:\DC775\Emails\jharish@tragsengineering.com_11.30.2020_Reg QFND300-ALB-PR-05-0001
D:\DC775\Emails\jharish@tragsengineering.com_11.30.2020_Reg Report.msg
D:\DC775\Emails\jharish@tragsengineering.com_12.02.2020_RE OCS for SD-05-0403.msg
D:\DC775\Emails\jharish@tragsengineering.com_12.02.2020_Reg Movable Scaffolding in Sta
D:\DC775\Emails\jilan.s@blueway-qatar.com_02.15.2021_RE Req. Quotation for supply , T&C
D:\DC775\Emails\joby.s@fjtco.com_11.29.2020_RE Pressurizatio unit Vessel Factory Test Cer
D:\DC775\Emails\jonaliza@samadhin.com_01.27.2021_Accounts Receivable Confirmation - F
D:\DC775\Emails\jonaliza@samadhin.com_01.27.2021_Accounts Receivable Confirmation - F
D:\DC775\Emails\Labeeb.Gondekar@astad.qa_11.30.2020_RE QAE- CCTV System Schematic
D:\DC775\Emails\mathewsales@salcoqatar.com_11.28.2020_Re Req. Quotation for supply o
D:\DC775\Emails\mayazuddin@tragsengineering.com_01.24.2021_Precast Pannels for 2011-
D:\DC775\Emails\mayazuddin@tragsengineering.com_01.25.2021_Precast Pannels for 2011-
D:\DC775\Emails\mayazuddin@tragsengineering.com_01.25.2021_PRINT- A0(2-COPIES).msg
D:\DC775\Emails\mayazuddin@tragsengineering.com_01.31.2021_RE Precast Pannels for 20
D:\DC775\Emails\mayazuddin@tragsengineering.com_02.14.2021_Requesting commented s
D:\DC775\Emails\mehtab@tragsengineering.com_02.15.2021_RE MR # 98852 Rubber Insulati
D:\DC775\Emails\misbauddin.mohammed@se.com_01.31.2021_RE AE50IA0024 OUTGOING
D:\DC775\Emails\misbauddin.mohammed@se.com_01.31.2021_RE AE50IA0024 OUTGOING
D:\DC775\Emails\misbauddin.mohammed@se.com_11.26.2020_AE50IA0024 OUTGOING TR
D:\DC775\Emails\misbauddin.mohammed@se.com_12.01.2020_AE50IA0024 OUTGOING TR
D:\DC775\Emails\misbauddin.mohammed@se.com_12.01.2020_AE50IA0024 OUTGOING TR
D:\DC775\Emails\mohammed.m@albalagh.com_12.02.2020_Fw Access Permit for Fire Fault
D:\DC775\Emails\MR Code # 98908.msg
D:\DC775\Emails\nihal@tragsengineering.com_01.26.2021_RE QAE- MR 98606.msg
D:\DC775\Emails\nihal@tragsengineering.com_02.01.2021_PL 21010080.msg
D:\DC775\Emails\nihal@tragsengineering.com_11.26.2020_FW QAE- MR 97485 AND MR 974
D:\DC775\Emails\nihal@tragsengineering.com_11.26.2020_RE QAE- MR 97485 AND MR 9748
D:\DC775\Emails\nihal@tragsengineering.com_11.29.2020_RE Our Order # PL 20110184.msg
D:\DC775\Emails\nihal@tragsengineering.com_12.02.2020_Our Order # PL 20110215.msg
D:\DC775\Emails\Our Order # PL 21020006.msg
D:\DC775\Emails\PDC MEP KEYS.msg
D:\DC775\Emails\praveen.mohan@albalagh.com_11.29.2020_RE Reg MS1 & 2 Pending Docu
D:\DC775\Emails\praveen.mohan@albalagh.com_12.01.2020_RE Reg MS1 & 2 Pending Docu
D:\DC775\Emails\praveen.vm@rhc-qatar.com_11.28.2020_RE Req. Quotation for supply of F
D:\DC775\Emails\procurement1@tragsengineering.com_02.02.2021_MR Code # 97826.msg
D:\DC775\Emails\procurement1@tragsengineering.com_11.29.2020_MR Code # 97523.msg
D:\DC775\Emails\procurement1@tragsengineering.com_12.01.2020_MR Code # 97567.msg
D:\DC775\Emails\procurement1@tragsengineering.com_12.01.2020_MR Code # 97570.msg
D:\DC775\Emails\procurement1@tragsengineering.com_12.01.2020_MR Code # 97572.msg
D:\DC775\Emails\QAE- AL Balagh Letter ref# QFND300-ALB-TRAGS-LR-0323 (Certificate of Com
D:\DC775\Emails\QAE- ASTAD Comments Approval on Pre As built and As built drawing subm
D:\DC775\Emails\QAE- Daily Progress Report (1).msg
D:\DC775\Emails\QAE- Daily Progress Report.msg
D:\DC775\Emails\QAE- Leave application of emp#966 Ashi Vattoli Parambil.msg
D:\DC775\Emails\QAE- MR 98606.msg
D:\DC775\Emails\QAE- MR 98726.msg
D:\DC775\Emails\QAE- MR 98908.msg
D:\DC775\Emails\QAE- PLC SCADA & BMS LOG.msg
D:\DC775\Emails\QAE- SIBS REPORT.msg
D:\DC775\Emails\qae@tragsengineering.com_02.02.2021_QAE- Daily Progress Report.msg
D:\DC775\Emails\qae@tragsengineering.com_02.08.2021_ QAE- Daily Progress Report.msg
D:\DC775\Emails\qae@tragsengineering.com_02.08.2021_RE QAE- MR 98606.msg
D:\DC775\Emails\qae@tragsengineering.com_02.10.2021_ QAE- Daily Progress Report.msg
D:\DC775\Emails\qae@tragsengineering.com_02.11.2021_ QAE- Daily Progress Report.msg
D:\DC775\Emails\qae@tragsengineering.com_02.13.2021_QAE- Daily Progress Report.msg
D:\DC775\Emails\qae@tragsengineering.com_02.14.2021_ Mosque at Pearl Qatar - MR 9896
D:\DC775\Emails\qae@tragsengineering.com_02.14.2021_ QAE- Daily Progress Report-13-02
D:\DC775\Emails\qae@tragsengineering.com_02.14.2021_FW KIfyath Ullah (ID No;25386),Ele
D:\DC775\Emails\qae@tragsengineering.com_02.14.2021_FW KIfyath Ullah (ID No;25386),Ele
D:\DC775\Emails\qae@tragsengineering.com_02.14.2021_FW RFIT AUD DDC-0001 T&C Date
D:\DC775\Emails\qae@tragsengineering.com_02.14.2021_QAE- MR 98998.msg
D:\DC775\Emails\qae@tragsengineering.com_02.14.2021_QAE- RFIT no. QFND300-ALB-RFIT-
D:\DC775\Emails\qae@tragsengineering.com_02.14.2021_RE RFIT AUD DDC-0001 T&C Dated
D:\DC775\Emails\qae@tragsengineering.com_02.15.2021_QAE- Daily Progress Report-14-02-
D:\DC775\Emails\qae@tragsengineering.com_11.30.2020_RE QAE-ASTAD Comments Approv
D:\DC775\Emails\qae@tragsengineering.com_11.30.2020_RE QAE-ASTAD Comments Approv
D:\DC775\Emails\QAE-ASTAD Comments Approval on Pre As Built and As Built drawing subm
D:\DC775\Emails\QAE-ASTAD Comments Approval on RFITs .msg
D:\DC775\Emails\QAE-ASTAD Comments on Discrimination Study Report for LV Panel .msg
D:\DC775\Emails\qaproject@albalagh.com_01.24.2021_QFND300-ALB-SD-05-0101-B1 Missin
D:\DC775\Emails\qaproject@albalagh.com_01.24.2021_RE QFND300-ALB-SD-05-0101-B1 Mi
D:\DC775\Emails\qaproject@albalagh.com_01.25.2021_OCS TRAGS Submittal.msg
D:\DC775\Emails\qaproject@albalagh.com_01.25.2021_Request for update in EDRMS - AS-BU
D:\DC775\Emails\qaproject@albalagh.com_01.25.2021_Request for update in EDRMS - AS-BU
D:\DC775\Emails\qaproject@albalagh.com_01.25.2021_Return RLM submittal.msg
D:\DC775\Emails\qaproject@albalagh.com_01.27.2021_ASTAD letter - ASTAD-APM-PM- CON
D:\DC775\Emails\qaproject@albalagh.com_01.27.2021_Missing submittal QFND300-ALB-SD-
D:\DC775\Emails\qaproject@albalagh.com_01.27.2021_OCS TRAGS Submittal.msg
D:\DC775\Emails\qaproject@albalagh.com_01.27.2021_OCS TRAGS Submittal_001.msg
D:\DC775\Emails\qaproject@albalagh.com_02.02.2021_OCS TRAGS Submittal.msg
D:\DC775\Emails\qaproject@albalagh.com_11.26.2020_RFIT-08-0072.msg
D:\DC775\Emails\qaproject@albalagh.com_11.27.2020_OCS response for clarification.msg
D:\DC775\Emails\qaproject@albalagh.com_11.28.2020_RE REMINDER Pre As-built submittal
D:\DC775\Emails\qaproject@albalagh.com_11.28.2020_REMINDER As-built required update
D:\DC775\Emails\qaproject@albalagh.com_11.28.2020_REMINDER As-built submittal require
D:\DC775\Emails\qaproject@albalagh.com_11.28.2020_REMINDER Pre As-built submittal req
D:\DC775\Emails\qaproject@albalagh.com_11.29.2020_OCS.msg
D:\DC775\Emails\qaproject@albalagh.com_11.30.2020_NCR-0059.msg
D:\DC775\Emails\qaproject@albalagh.com_11.30.2020_OCS TRAGS Submittal.msg
D:\DC775\Emails\qaproject@albalagh.com_11.30.2020_OCS TRAGS Submittal_001.msg
D:\DC775\Emails\qaproject@albalagh.com_11.30.2020_Request for update in EDRMS - RSPL
D:\DC775\Emails\qaproject@albalagh.com_12.01.2020_Incomplete submittal missing CCS.m
D:\DC775\Emails\qaproject@albalagh.com_12.01.2020_OCS.msg
D:\DC775\Emails\qaproject@albalagh.com_12.01.2020_Payment Recommendation No. 24.m
D:\DC775\Emails\qaproject@albalagh.com_12.01.2020_RFIT Replied 30-Nov-20 .msg
D:\DC775\Emails\qaproject@albalagh.com_12.02.2020_DIR & RFIT Replied 02-Dec-20 .msg
D:\DC775\Emails\qaproject@albalagh.com_12.02.2020_OCS TRAGS Submittal.msg
D:\DC775\Emails\qaproject@albalagh.com_12.02.2020_RE OCS TRAGS Submittal.msg
D:\DC775\Emails\qayoom@tragsengineering.com_01.25.2021_Gulf Lights Electrical Engineer
D:\DC775\Emails\qs@tragsengineering.com_02.14.2021_RE Dukhan Facilities- EX-01-Rev-00
D:\DC775\Emails\Quote of the week from HR team.msg
D:\DC775\Emails\rajeshv@albalagh.com_11.28.2020_Al Balagh, Qatar Academy Expansion Pr
D:\DC775\Emails\Re QAE- Transportation for Over Time workers .msg
D:\DC775\Emails\RE Accounts Receivable Confirmation - Financial Audit 2020.msg
D:\DC775\Emails\RE Firestop Insulation Technologies WLL Invoice Nos 20106 20107 for Qata
D:\DC775\Emails\RE Gulf Lights Electrical Engineering WLL LC Invoice No 34319 for Qatar Aca
D:\DC775\Emails\RE Honeywell Technoloy Solutions Qatar Invoice No I-25122020-805 for Qa
D:\DC775\Emails\RE MN submittal required update QFND300-ALB-MN-13-0004.msg
D:\DC775\Emails\RE MOM for CCTV-PA-QSoftofferELV system.msg
D:\DC775\Emails\RE MS1- De-snagging.msg
D:\DC775\Emails\RE MS1 Warranty Register and Spare Parts Datasheets.msg
D:\DC775\Emails\RE Our Order # 20110229.msg
D:\DC775\Emails\RE QAE - Offer.msg
D:\DC775\Emails\RE QAE-ASTAD Comments Approval on method statement pre as built dra
D:\DC775\Emails\RE Susin Qatar Trading & Contracting WLL Invoice No 0035A 19 for Qatar A
D:\DC775\Emails\reception@tragsengineering.com_11.29.2020_Signed Budget and MR .ms
D:\DC775\Emails\reception@tragsengineering.com_11.30.2020_QAE Project - Staff and Wor
D:\DC775\Emails\reception@tragsengineering.com_11.30.2020_Signed Budget and MR .ms
D:\DC775\Emails\reception@tragsengineering.com_11.30.2020_Signed Budget and MR _00
D:\DC775\Emails\reception@tragsengineering.com_12.01.2020_Signed Budget and MR .ms
D:\DC775\Emails\recruitment2@tragsengineering.com_11.30.2020_Requirement of PCs for A
D:\DC775\Emails\Reg QAE - PDC QCDD Inspection.msg
D:\DC775\Emails\rikas9389@gmail.com_12.01.2020_Vo's.msg
D:\DC775\Emails\sachin.shinde@tragsengineering.com_02.03.2021_AUD Buiding T&C RFIT- F
D:\DC775\Emails\sachin.shinde@tragsengineering.com_02.03.2021_AUD Buiding T&C RFIT- F
D:\DC775\Emails\sachin.shinde@tragsengineering.com_02.03.2021_FW PUE- De-snagging.m
D:\DC775\Emails\sachin.shinde@tragsengineering.com_02.03.2021_RE MS1- De-snagging.ms
D:\DC775\Emails\sachin.shinde@tragsengineering.com_02.03.2021_RE MS1- De-snagging_00
D:\DC775\Emails\sales@spectrawll.com_11.26.2020_Offer from Diamond Dukhan Facilities P
D:\DC775\Emails\senthilk@tragsengineering.com_01.25.2021_FW QAE AUDITORIUM BUILDI
D:\DC775\Emails\senthilk@tragsengineering.com_01.31.2021_FW FTC Qatar Invoice Nos.SI21
D:\DC775\Emails\senthilk@tragsengineering.com_02.04.2021_Mechanical draftsman Reque
D:\DC775\Emails\senthilk@tragsengineering.com_11.26.2020_FW Req. Quotation for supply
D:\DC775\Emails\senthilk@tragsengineering.com_11.26.2020_Req. Quotation for supply of P
D:\DC775\Emails\senthilk@tragsengineering.com_11.26.2020_Req. Quotation for supply of P
D:\DC775\Emails\senthilk@tragsengineering.com_11.26.2020_Req. Quotation for supply of P
D:\DC775\Emails\senthilk@tragsengineering.com_11.26.2020_Req. Quotation for supply of P
D:\DC775\Emails\senthilk@tragsengineering.com_11.28.2020_RE QAE- MR 97485 AND MR 9
D:\DC775\Emails\senthilk@tragsengineering.com_11.28.2020_RE Req. Quotation for supply
D:\DC775\Emails\senthilk@tragsengineering.com_11.28.2020_Req. Quotation for supply of F
D:\DC775\Emails\senthilk@tragsengineering.com_11.30.2020_RE QAE- MR 97485 AND MR 9
D:\DC775\Emails\senthilk@tragsengineering.com_11.30.2020_Req. Quotation for supply of F
D:\DC775\Emails\shoeba@tragsengineering.com_01.27.2021_BUDGET COMPARISON SHEET
D:\DC775\Emails\siva.chandran@act-grp.com_02.04.2021_RE 2011 - Fabrication Drawings fo
D:\DC775\Emails\siva.chandran@act-grp.com_02.13.2021_4519 - Precast MEP Incorporation
D:\DC775\Emails\siva.chandran@act-grp.com_02.13.2021_4520-21 Block wall MEP openings
D:\DC775\Emails\suraj.noronha@medgulfconstruction.com_11.30.2020_RE Requirement of P
D:\DC775\Emails\suraj.noronha@medgulfconstruction.com_12.02.2020_RE Dukhan Facilities
D:\DC775\Emails\syeda@tragsengineering.com_02.14.2021_Request for update on Our Ord
D:\DC775\Emails\syeda@tragsengineering.com_02.15.2021_Material Submittal for Bodet Clo
D:\DC775\Emails\talib@catalmalki.com_12.02.2020_RE O&M Manual Comments on Solar Ho
D:\DC775\Emails\teodolfo.tano@albalagh.com_11.28.2020_Re QAE- TRAGS letter ref# 775TC
D:\DC775\Emails\tragspayroll@tragsengineering.com_12.01.2020_Labor Time Sheets For The
D:\DC775\Emails\traininganddevelopment@tragsengineering.com_11.29.2020_Quote of the
D:\DC775\Emails\transport@tragsengineering.com_11.29.2020_RE QAE Site Driver 7 seat Va
D:\DC775\Emails\transport@tragsengineering.com_11.29.2020_RE QAE Site Driver 7 seat Va
D:\DC775\Emails\ukcredit.control.vwrs@gmail.com_12.02.2020_Fw Unpaid Invoices.msg
D:\DC775\Emails\vegender@tragsengineering.com_01.24.2021_FW Delay of Staff Time Shee
D:\DC775\Emails\vegender@tragsengineering.com_01.25.2021_QCDD inspection- Auditorium
D:\DC775\Emails\vegender@tragsengineering.com_01.25.2021_RE Payment update.msg
D:\DC775\Emails\vegender@tragsengineering.com_01.25.2021_RE Qatar Academy - Cycle tra
D:\DC775\Emails\vegender@tragsengineering.com_11.26.2020_.msg
D:\DC775\Emails\vegender@tragsengineering.com_11.26.2020_FW Revised Budget sheet -PV
D:\DC775\Emails\vegender@tragsengineering.com_11.28.2020_FW MATERIAL SUBMITTAL.m
D:\DC775\Emails\vegender@tragsengineering.com_11.28.2020_FW QUOTATION RFQ # MR-7
D:\DC775\Emails\vegender@tragsengineering.com_11.29.2020_FW (C-108-01) Approved Ma
D:\DC775\Emails\vegender@tragsengineering.com_11.29.2020_FW (C-108-01) Approved Ma
D:\DC775\Emails\vegender@tragsengineering.com_11.29.2020_FW Dukhan Facilities 201120
D:\DC775\Emails\vegender@tragsengineering.com_12.01.2020_FW MR - Printer For Mosque
D:\DC775\Emails\vegender@tragsengineering.com_12.01.2020_FW Stationary Request - Pea
D:\DC775\Emails\vegender@tragsengineering.com_12.01.2020_RE Allocation - 782 - Mosqu
D:\DC775\Emails\vegender@tragsengineering.com_12.02.2020_quote-storm water.msg
D:\DC775\Emails\vegender@tragsengineering.com_12.02.2020_RE Allocation - 782 - Mosqu
D:\DC775\Emails\vegender@tragsengineering.com_12.02.2020_RE IP module for CBS -Easi ch
D:\DC775\Emails\vijaykumar@tragsengineering.com_01.24.2021_Budget For CCTV +TelData
D:\DC775\Emails\vijaykumar@tragsengineering.com_01.26.2021_FW dhaneesh8483@gmail.
QFND300LB-RFI-04-0071.msg
Certificate of Completion for PDC Building) .msg
s built drawing and Built Drawing .msg
Manual Submittals .msg
Manual Submittals130221 .msg
Built and As Built Drawing submittals .msg
QAE- MR 98606.msg
21010080.msg
QAE- MR 97485 AND MR 97487 .msg
QAE- MR 97485 AND MR 97487 .msg
Our Order # PL 20110184.msg
r Order # PL 20110215.msg
oli Parambil.msg
RAGS Submittal.msg
RAGS Submittal_001.msg
st for update in EDRMS - RSPL submittal.msg
plete submittal missing CCS.msg
atasheets.msg
hod statement pre as built drawing and remark up drawing submittals .msg
voice No 0035A 19 for Qatar Academy Expansion.msg
0_Signed Budget and MR .msg
0_QAE Project - Staff and Workers .msg
0_Signed Budget and MR .msg
0_Signed Budget and MR _001.msg
0_Signed Budget and MR .msg
020_Requirement of PCs for AutoCAD Operator.msg