NON-SHRINKING CEMENT

589.750/541.220 (net) MW on Gas/Fuel Oil


PROJECT : Combined Cycle Power Plant;
Meghnaghat; Bangladesh

SUMMIT MEGHNAGHAT II POWER


OWNER : COMPANY LIMITED

OWNER'S
ENGINEER : TRACTEBEL ENGINEERING PVT LTD

Sent to Owner for

GE POWER
Gas Power Systems

AP Doc Code QME/00/S/145b---000/EI/006

Document ID HTCT601227

Revision B Revision Date 2010-12-02

MK
Equipment Tag Number(s):

Sheet 0 / 3 Information Class, if applicable, on pg. 1 et sqq


ALSTOM Power HTCT601227
Responsible department: Derived from: Replaces: File no.:

9560 - - PGD 82E-18-100


Prepared: Checked: Approved: Revision: Page:

2010-12-02 krachbr 2010-12-02 ejschwar 2010-12-02 hwetter B 1/3

Item Specification for non-shrinking Grouting Cement

Table of contents:

1 General .......................................................................................................................................... 2
1.1 Definitions............................................................................................................................. 2
1.2 Foreseen application and purpose ........................................................................................ 2
1.3 Categories and criticality....................................................................................................... 2
2 Material properties requirements.................................................................................................... 2
3 Form, fit and function requirements................................................................................................ 2
3.1 Design .................................................................................................................................. 2
4 Testing and verification requirements............................................................................................. 3
5 Process requirements .................................................................................................................... 3
2010-12-02 EN Approved
Lng. Status

6 Associated standards..................................................................................................................... 3
7 Transportation and logistic requirements........................................................................................ 3
Rev. Released

8 Notes ............................................................................................................................................. 3
8.1 Identification of changes ....................................................................................................... 3
B

9 Appendices .................................................................................................................................... 3
Type
DF
9560 HTCT601227
Dept. Document No.

The information contained herein is ALSTOM proprietary information and has been disclosed in confidence to the designated
party for specified purposes only. Any use, disclosure or reproduction contrary thereto is a violation of ALSTOM’s right.
©ALSTOM 2010. All rights reserved.

Released for Construction - set by J. LAFARGE on 13-août-20


Revision: Page:

B 2/3
HTCT601227

1 General

1.1 Definitions
1) Alstom: Employees of Alstom or its designated representative.
2) Manufacturer: Company or factory responsible for manufacturing of component / part.
3) May: This word is used to indicate a course of action permissible within the
limits of the standard.
4) Shall: This word is used to indicate mandatory requirements strictly to be
followed in order to conform to the standard and from which no deviation
is permitted.
5) Supplier: Company or factory to which inquiry or order is awarded.
6) Will: This word is used in statements of fact.

1.2 Foreseen application and purpose


2010-12-02 EN Approved

1) This specification describes the technical data of non-shrinking grouting cement.


Lng. Status

1.3 Categories and criticality


2) Suppliers need to obtain product qualification before any delivery. Supplier shall contact
Rev. Released

Alstom to receive instructions on product qualification requirements.


B

3) All requirements of this specification have to be fully complied with. Where permissible
Type
DF

deviations are given, suppliers shall ensure that any value is appropriate within the
permissible deviation given.
4) It is critical to Alstom, that all required records are sufficiently established and where
9560 HTCT601227
Dept. Document No.

defined submitted to Alstom. In case Alstom is not requesting transmittal of such records,
supplier shall ensure that such records are maintained in accordance with the terms and
conditions of the order placed and international legislation.

2 Material properties requirements


This section is not applicable to this specification.

3 Form, fit and function requirements

3.1 Design
3.1.1 Technical data
1) Grain grading: 0-4 mm
2) Spreading rate: > 25 cm
3) Volume increase: 0.5 vol. percent max.
4) Handling time: 50 to 75 minutes
5) Begin and end of solidification: approx. 120 and 250 minutes respectively
6) Addition of water: if required, see mixing instructions of suppliers

The information contained herein is ALSTOM proprietary information and has been disclosed in confidence to the designated
party for specified purposes only. Any use, disclosure or reproduction contrary thereto is a violation of ALSTOM’s right.
©ALSTOM 2010. All rights reserved.

Released for Construction - set by J. LAFARGE on 13-août-20


Revision: Page:

B 3/3
HTCT601227

Table 1: Flexural and compressive strength (mean values)

Flexural strength Compressive strength


Time
[N/mm2] [N/mm2]

24 hours 6 32

3 days 7 50

7 days 8 60

28 days 10 70

4 Testing and verification requirements


This section is not applicable to this specification.
2010-12-02 EN Approved

5 Process requirements
Lng. Status

This section is not applicable to this specification.


Rev. Released

6 Associated standards
This section is not applicable to this specification.
B
Type
DF

7 Transportation and logistic requirements


This section is not applicable to this specification.
9560 HTCT601227
Dept. Document No.

8 Notes

8.1 Identification of changes


Revision Date Changes made

B 2010-12-02 See change protocol in APC-RPDM.

9 Appendices
This section is not applicable to this specification.

The information contained herein is ALSTOM proprietary information and has been disclosed in confidence to the designated
party for specified purposes only. Any use, disclosure or reproduction contrary thereto is a violation of ALSTOM’s right.
©ALSTOM 2010. All rights reserved.

Released for Construction - set by J. LAFARGE on 13-août-20