You are on page 1of 1

STA 0+080

KEMENTERIAN AGAMA REPUBLIK INDONESIA


STA 0+100
UNIVERSITAS ISLAM NEGERI

1024
WALISONGO SEMARANG
400 Jalan Walisongo Nomor 3-5 Semarang 50185
Telepon (024) 7604554,7624334 Faksimil (024) 7601293
BAHU LAJUR STA 0+120 STA 0+140 STA 0+160 www.walisongo.ac.id

4259
400 1000 640150 1000
2500 PEKERJAAN

1600
Pembangunan Jalan dan Pengembangan

1024
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
(Non Include) Aggregate Class A, t = 20 cm
Plester+Aci 2 cm
41.630
Hole Drain 4"

41.630
41.451
Aggregate Class B, t = 30 cm
Fasilitas Kampus 2 dan Kampus 3 UIN
41.401
40.681 2% BAHU LAJUR Walisongo Semarang Tahun 2021
600 1024

1024
BAHU LAJUR
Lantai Kerja 5 cm
400 1000 640150 1000
Timbunan Biasa dari Galian
1000
(Dipadatkan Pakai Alat)
2500
BAHU LAJUR
MENGETAHUI
2000

1000 400 1000 640150 1000


Hole Drain 4"
2500 Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm BAHU LAJUR
(Non Include) Aggregate Class A, t = 20 cm
Hole Drain 4"

Plester+Aci 2 cm
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
Aggregate Class B, t = 30 cm
Plester+Aci 2 cm

36.376 36.376
36.147 36.197
Aggregate Class B, t = 30 cm
400 1000 640150 1000
2500
Galian Tanah
(Pakai Alat) An. Kuasa Pengguna Anggaran PPK
39.003 Timbunan Biasa dari Galian Galian Tanah
39.003

38.054
38.774 38.824
(Dipadatkan Pakai Alat) 35.427 2% (Pakai Alat) 400 1000 640150 1000
2500 UIN Walisongo Semarang

1600
2%
Beton fc'20 MPa

Timbunan Biasa dari Galian Lantai Kerja 5 cm

600
(Dipadatkan Pakai Alat) Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
(Non Include) Aggregate Class A, t = 20 cm
Lantai Kerja 5 cm Hole Drain 4"
1000 Plester+Aci 2 cm Aggregate Class B, t = 30 cm

4259
34.655 34.655

2000
34.426 34.476
Hole Drain 2" 33.706 2%

600 1024
Hole Drain 4"
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
(Non Include) Aggregate Class A, t = 20 cm
Beton fc'20 MPa Plester+Aci 2 cm Aggregate Class B, t = 30 cm
Lantai Kerja 5 cm

600
32.051 32.051
1000 31.822 31.872
Hole Drain 2" 31.102 2%
1200

2000

600 1024
2000
Lantai Kerja 5 cm
1000

2000
M. Sirojuddin Munir, S.Ag, M.M
0+ 080

0+ 140
0+ 100

0+ 120

0+ 160
NIP. 19750801 200312 1 004

KONSULTAN

Udith Udith Udith Udith

Sigit Wijanarko, ST
Team Leader

KONTRAKTOR PELAKSANA
Udith Udith Udith Udith

STA 0+080
400
3300

STA 0+100 STA 0+120


Ayub Wahyudi
Leader KSO
400 STA 0+160
Engineering
4750

LAJUR BAHU STA 0+140


4750

Plester+Aci 2 cm
1000 150640 1000 400 Drafter
2500 44.727
Galian Tanah
(Pakai Alat)
Beton fc'20 MPa

SHOP DRAWING

1900
Hole Drain 4"
AC-BC, t = 6 cm Hole Drain 2"

4800
Aggregate Class A, t = 20 cm
4121

Aggregate Class B, t = 30 cm
LAJUR BAHU
41.451 41.401
41.630 LAJUR BAHU
CL 40.681

JUDUL GAMBAR :
2%

Beton fc'20 MPa 1000 150640 1000 400 1000 LAJUR BAHU
1000 150640 1000 400 1000
2500
600

2500
Lantai Kerja 5 cm
Timbunan Biasa dari Galian 1200 Hole Drain 4"
(Dipadatkan Pakai Alat) AC-BC, t = 6 cm Hole Drain 4"
Aggregate Class A, t = 20 cm AC-BC, t = 6 cm 1000 150640 1000 400
2000

Aggregate Class B, t = 30 cm
39.003 Plester+Aci 2 cm Aggregate Class A, t = 20 cm
Plester+Aci 2 cm
2500
Aggregate Class B, t = 30 cm Galian Tanah
39.003
38.824 38.774 36.376 36.376 (Pakai Alat)
Timbunan Biasa dari Galian
CL 36.197 36.147
38.054

DETAIL PATOK
2% (Dipadatkan Pakai Alat)
Beton fc'20 MPa CL 2% 35.427
LAJUR BAHU
600 946

Galian Tanah
Timbunan Biasa dari Galian (Pakai Alat)
(Dipadatkan Pakai Alat)

STA 0+080 S/D 0+160


Lantai Kerja 5 cm AC-BC, t = 6 cm
Lantai Kerja 5 cm Aggregate Class A, t = 20 cm Hole Drain 4"
1000 150640 1000 400
1000 Plester+Aci 2 cm
2500
4424

Aggregate Class B, t = 30 cm
34.655 34.655
2000

34.476 34.426
CL Hole Drain 2"
2% 33.706

600 1024
Beton fc'20 MPa
Timbunan Biasa dari Galian
600

(Dipadatkan Pakai Alat) Lantai Kerja 5 cm

1200
1000
Catatan :

2000
Hole Drain 4"
2000

AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
Aggregate Class B, t = 30 cm Plester+Aci 2 cm
32.051 32.051
31.872 31.822
CL 31.102 Hole Drain 2"
2%

600 1024
Lantai Kerja 5 cm
1000

2000
SKALA NO. GAMBAR KODE
: EXISTING TANAH
1 : 300 16 -
: RENCANA JALAN