Professional Documents
Culture Documents
1024
WALISONGO SEMARANG
400 Jalan Walisongo Nomor 3-5 Semarang 50185
Telepon (024) 7604554,7624334 Faksimil (024) 7601293
BAHU LAJUR STA 0+120 STA 0+140 STA 0+160 www.walisongo.ac.id
4259
400 1000 640150 1000
2500 PEKERJAAN
1600
Pembangunan Jalan dan Pengembangan
1024
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
(Non Include) Aggregate Class A, t = 20 cm
Plester+Aci 2 cm
41.630
Hole Drain 4"
41.630
41.451
Aggregate Class B, t = 30 cm
Fasilitas Kampus 2 dan Kampus 3 UIN
41.401
40.681 2% BAHU LAJUR Walisongo Semarang Tahun 2021
600 1024
1024
BAHU LAJUR
Lantai Kerja 5 cm
400 1000 640150 1000
Timbunan Biasa dari Galian
1000
(Dipadatkan Pakai Alat)
2500
BAHU LAJUR
MENGETAHUI
2000
Plester+Aci 2 cm
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
Aggregate Class B, t = 30 cm
Plester+Aci 2 cm
36.376 36.376
36.147 36.197
Aggregate Class B, t = 30 cm
400 1000 640150 1000
2500
Galian Tanah
(Pakai Alat) An. Kuasa Pengguna Anggaran PPK
39.003 Timbunan Biasa dari Galian Galian Tanah
39.003
38.054
38.774 38.824
(Dipadatkan Pakai Alat) 35.427 2% (Pakai Alat) 400 1000 640150 1000
2500 UIN Walisongo Semarang
1600
2%
Beton fc'20 MPa
600
(Dipadatkan Pakai Alat) Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
(Non Include) Aggregate Class A, t = 20 cm
Lantai Kerja 5 cm Hole Drain 4"
1000 Plester+Aci 2 cm Aggregate Class B, t = 30 cm
4259
34.655 34.655
2000
34.426 34.476
Hole Drain 2" 33.706 2%
600 1024
Hole Drain 4"
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
(Non Include) Aggregate Class A, t = 20 cm
Beton fc'20 MPa Plester+Aci 2 cm Aggregate Class B, t = 30 cm
Lantai Kerja 5 cm
600
32.051 32.051
1000 31.822 31.872
Hole Drain 2" 31.102 2%
1200
2000
600 1024
2000
Lantai Kerja 5 cm
1000
2000
M. Sirojuddin Munir, S.Ag, M.M
0+ 080
0+ 140
0+ 100
0+ 120
0+ 160
NIP. 19750801 200312 1 004
KONSULTAN
Sigit Wijanarko, ST
Team Leader
KONTRAKTOR PELAKSANA
Udith Udith Udith Udith
STA 0+080
400
3300
Plester+Aci 2 cm
1000 150640 1000 400 Drafter
2500 44.727
Galian Tanah
(Pakai Alat)
Beton fc'20 MPa
SHOP DRAWING
1900
Hole Drain 4"
AC-BC, t = 6 cm Hole Drain 2"
4800
Aggregate Class A, t = 20 cm
4121
Aggregate Class B, t = 30 cm
LAJUR BAHU
41.451 41.401
41.630 LAJUR BAHU
CL 40.681
JUDUL GAMBAR :
2%
Beton fc'20 MPa 1000 150640 1000 400 1000 LAJUR BAHU
1000 150640 1000 400 1000
2500
600
2500
Lantai Kerja 5 cm
Timbunan Biasa dari Galian 1200 Hole Drain 4"
(Dipadatkan Pakai Alat) AC-BC, t = 6 cm Hole Drain 4"
Aggregate Class A, t = 20 cm AC-BC, t = 6 cm 1000 150640 1000 400
2000
Aggregate Class B, t = 30 cm
39.003 Plester+Aci 2 cm Aggregate Class A, t = 20 cm
Plester+Aci 2 cm
2500
Aggregate Class B, t = 30 cm Galian Tanah
39.003
38.824 38.774 36.376 36.376 (Pakai Alat)
Timbunan Biasa dari Galian
CL 36.197 36.147
38.054
DETAIL PATOK
2% (Dipadatkan Pakai Alat)
Beton fc'20 MPa CL 2% 35.427
LAJUR BAHU
600 946
Galian Tanah
Timbunan Biasa dari Galian (Pakai Alat)
(Dipadatkan Pakai Alat)
Aggregate Class B, t = 30 cm
34.655 34.655
2000
34.476 34.426
CL Hole Drain 2"
2% 33.706
600 1024
Beton fc'20 MPa
Timbunan Biasa dari Galian
600
1200
1000
Catatan :
2000
Hole Drain 4"
2000
AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
Aggregate Class B, t = 30 cm Plester+Aci 2 cm
32.051 32.051
31.872 31.822
CL 31.102 Hole Drain 2"
2%
600 1024
Lantai Kerja 5 cm
1000
2000
SKALA NO. GAMBAR KODE
: EXISTING TANAH
1 : 300 16 -
: RENCANA JALAN