KEMENTERIAN AGAMA REPUBLIK INDONESIA
UNIVERSITAS ISLAM NEGERI
1024
BAHU LAJUR WALISONGO SEMARANG
Jalan Walisongo Nomor 3-5 Semarang 50185
1024
1000 400 640150 1000 Telepon (024) 7604554,7624334 Faksimil (024) 7601293
2500
www.walisongo.ac.id
Plester+Aci 2 cm
Hole Drain 4"
Beton Fc 20 Mpa (Wiremesh)
(Non Include)
AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
BAHU LAJUR STA 0+060
Timbunan Biasa dari Galian
PEKERJAAN
Aggregate Class B, t = 30 cm
(Dipadatkan Pakai Alat)
55.203
55.203 55.974 55.024
54.254 2% CL 400 1000 640150 1000
2500
Hole Drain 4" BAHU LAJUR
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
STA 0+080 Pembangunan Jalan dan Pengembangan
1849
(Non Include) Aggregate Class A, t = 20 cm
3027
50.003
50.721
2%
50.773
Galian Tanah
2500 Fasilitas Kampus 2 dan Kampus 3 UIN
600 1024
(Pakai Alat)
2000
Aggregate Class B, t = 30 cm
Plester+Aci 2 cm
MENGETAHUI
1024
49.148 49.148
48.918 48.968
Hole Drain 2" 48.198 2%
400 1000 640150 1000
2500
An. Kuasa Pengguna Anggaran PPK
600
Lantai Kerja 5 cm BAHU LAJUR
1000
UIN Walisongo Semarang
2000
Plester+Aci 2 cm Hole Drain 4"
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
(Non Include) Aggregate Class A, t = 20 cm
Timbunan Biasa dari Galian 400 1000 640150 1000
Aggregate Class B, t = 30 cm
(Dipadatkan Pakai Alat)
45.178 45.178
2500
44.949 44.999
44.229 2%
1849
Beton Fc 20 Mpa (Wiremesh) AC-BC, t = 6 cm
Lantai Kerja 5 cm
(Non Include) Aggregate Class A, t = 20 cm
Hole Drain 4"
600
Plester+Aci 2 cm Aggregate Class B, t = 30 cm
41.630 41.630
41.401 41.451
1000 40.681 2%
2000
600 1024
Lantai Kerja 5 cm
1000 Timbunan Biasa dari Galian
(Dipadatkan Pakai Alat)
2000
0+ 040
0+ 020
0+ 060
0+ 080
M. Sirojuddin Munir, S.Ag, M.M
0+000
KONSULTAN
150 400
2500 1000640
Sigit Wijanarko, ST
6401000 2500
2%
Team Leader
400 150
STA 0+000
2244
2312
Leader KSO
1024
Drafter
STA 0+080
3924
LAJUR BAHU
400
SHOP DRAWING
LAJUR BAHU LAJUR BAHU
1000 150640 400 1000
2500
Hole Plester+Aci 2 cm
1000 150640 1000 400 1000 150640 1000 400
Drain 4" Timbunan Biasa dari Galian
AC-BC, t = 6 cm 2500
Aggregate Class A, t = 20 cm (Dipadatkan Pakai Alat) 2500 Galian Tanah
Galian Tanah (Pakai Alat)
Aggregate Class B, t = 30 cm Hole Drain 4"
3300
(Pakai Alat)
55.024
CL 2%
55.974
54.254
55.203
55.203
AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
Aggregate Class B, t = 30 cm Plester+Aci 2 cm
LAJUR BAHU JUDUL GAMBAR :
Hole Drain 4"
50.952 50.952 AC-BC, t = 6 cm Plester+Aci 2 cm
50.773 50.721
CL Hole Drain 2" Aggregate Class A, t = 20 cm
2% 50.003
Aggregate Class B, t = 30 cm 1000 150640 1000 400
2312
Plester+Aci 2 cm
600 1024
Lantai Kerja 5 cm
1000
1000 Hole Drain 4"
DETAIL PATOK
2000
3918
STA 0+000 S/D 0+080
2000
45.178
44.999 44.949
CL 44.229 Plester+Aci 2 cm
2%
1000 150640 1000 400
2500 44.727
Galian Tanah
(Pakai Alat)
600
Lantai Kerja 5 cm Beton fc'20 MPa
Timbunan Biasa dari Galian 1000
(Dipadatkan Pakai Alat)
2000
AC-BC, t = 6 cm
Aggregate Class A, t = 20 cm
Hole Drain 4"
Hole Drain 2"
Catatan :
4121
Aggregate Class B, t = 30 cm
41.630
41.451 41.401
CL 2% 40.681
600
Lantai Kerja 5 cm
Timbunan Biasa dari Galian 1200
(Dipadatkan Pakai Alat)
2000
SKALA NO. GAMBAR KODE
: EXISTING TANAH
1 : 300 15 -
: RENCANA JALAN