You are on page 1of 12

Page 1 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _1-9-2021_______________ Sheet No.65

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
1 H 136 9/1/2021 Embankment Embankment 2nd Layer Of L/S 22+340 22+500

2 H 137 9/1/2021 Embankment Embankment 2nd Layer Of L/S 22+640 22+800

3 H 138 9/1/2021 Subgrade Top Subgeade Top Layer F/W 28+400 28+600

4 H 139 9/1/2021 Subgrade 1st Subgeade 1st Layer F/W 28+600 28+700

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 1-Sep-21 Date 1-Sep-21


Page 2 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _1-9-2021_______________ Sheet No.65

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
S 9/1/2021 Not Activity

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 1-Sep-21 Date 1-Sep-21


Page 3 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _2-9-2021_______________ Sheet No.66

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
1 H 140 9/2/2021 Embankment Embankment 3rd Layer Of L/S 22+340 22+500

2 H 141 9/2/2021 Embankment Embankment 3rd Layer Of R/S 21+720 21+760

3 H 142 9/2/2021 Subgrade Top Subgeade Top Layer F/W 28+600 28+700

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 2-Sep-21 Date 2-Sep-21


Page 4 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _2-9-2021_______________ Sheet No.66

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
S 9/2/2021 Not Activity

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 2-Sep-21 Date 2-Sep-21


Page 5 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _4-9-2021_______________ Sheet No.67

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
1 H 143 9/4/2021 Embankment Embankment 3rd Layer Of L/S 22+640 22+800

2 H 144 9/4/2021 Embankment Embankment 3rd Layer Of R/S 22+340 22+500

3 H 145 9/4/2021 Preparation Subgrade Preparation Of Subgeade Top F/W 21+960 22+030

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 4-Sep-21 Date 4-Sep-21


Page 6 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _4-9-2021_______________ Sheet No.67

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
S 9/4/2021 Not Activity

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 4-Sep-21 Date 4-Sep-21


Page 7 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _5-9-2021_______________ Sheet No.68

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
1 H 146 9/5/2021 Embankment Embankment 4th Layer Of R/S 22+340 22+500

2 H 147 9/5/2021 Embankment Embankment 4th Layer Of L/S 22+640 22+800

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 5-Sep-21 Date 5-Sep-21


Page 8 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _5-9-2021_______________ Sheet No.68

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
S 9/5/2021 Not Activity

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 5-Sep-21 Date 5-Sep-21


Page 9 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _7-9-2021_______________ Sheet No.69

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
1 H 148 9/7/2021 Embankment Embankment 4th Layer Of L/S 22+340 22+500

2 H 149 9/7/2021 Embankment Embankment 2nd Layer Of L/S 21+900 21+960

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 7-Sep-21 Date 7-Sep-21


Page 10 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _7-9-2021_______________ Sheet No.69

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
S 9/7/2021 Not Activity

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 7-Sep-21 Date 7-Sep-21


Page 11 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _15-9-2021_______________ Sheet No.70

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
1 H 150 9/15/2021 Subbase Top Subbse Top Layer F/W 27+700 27+860

2 H 151 9/15/2021 Subbase Top Subbse Top Layer F/W 27+860 27+960

3 H 152 9/15/2021 Diversion Preparation Of Diversion 27+960 28+040

FWO 763 CTE . PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 15-Sep-21 Date 15-Sep-21


Page 12 of 12

763 CTE
THAL TO MIRALI ROAD (SECTION-3)
CONSULTANT
Daily Work Programe on ________ _15-9-2021_______________ Sheet No.70

Chainage Insp Sur Lab


Proposed
S.No Req No. CR Date Main Activity Description Remarks
From To Insp. Time ok/Not ok ok/Not ok/Not
ok ok
21+370 To 29+000
1 S 14 9/15/2021 Pipeculvert Layout&Excavation+FDT Of Pipeculvert F/W 27+980

FWO 763 CTE PAVRON


Submitted by Received by

Signature Signature

Name / Design Iftikhar Ali Name / Design Shahid Iqbal

Date 15-Sep-21 Date 15-Sep-21