You are on page 1of 2

Volume XI, Issue 25

June 25, 2021

STANDARDS ACTIONS
PUBLIC REVIEW—CALL FOR COMMENTS ERRATA
Constructive comments are invited for the following Public A new errata sheet for the following standards are now
Review Drafts, which can be accessed on ASHRAE’s web- available on the ASHRAE website at
site at https://osr.ashrae.org. To obtain a paper copy of any http://www.ashrae.org/standards-errata.
Public Review Draft contact ASHRAE, Inc. Attn: Stand-
ards Public Review, 180 Technology Parkway, Peachtree  ANSI/ASHRAE Standard 135-2020, A Data Com-
Corners, GA 30092, or via email at: munication Protocol for Building Automation and
standards.section@ashrae.org. Paper copies are Control Networks, dated June 18, 2021. This replaces
$35.00/copy if 100 pages or less and $45.00 if over 100 the version dated April 23, 2021.
pages.
 ANSI/ASHRAE Standard 135.1-2019, A Data Com-
30-day Public Review from munication Protocol for Building Automation and
June 25, 2021 to July 25, 2021 Control Networks dated June 18, 2021. This replaces
the version dated February 1, 2020.
 2nd ISC Public Review of BSR/ASHRAE Standard
41.6-2014R, Standard Methods for Humidity Meas- INTERPRETATIONS
urements
This revision of ANSI/ASHRAE Standard 41.6-2014 pre- New official interpretations to the following standard
scribes methods for measuring the humidity of moist air ISnow available on the ASHRAE website at:
with instruments. http://www.ashrae.org/standards-interpretations
 ANSI/ASHRAE/IES STANDARD 90.1-2019, Ener-
gy Standard for Buildings Except Low-Rise Residen-
PUBLICATION NOTICE tial Buildings, approved by SSPC 90.1 on June 9,
2021. Refers to the requirements presented in AN-
The standard document listed below is now available for SI/ASHRAE/IES Standard 90.1-2019, Section 6.5.2,
purchase on the ASHRAE website at: regarding the application of Section 6.5.2 to hospital
http://www.ashrae.org/published-standards, or by contact- zones.
ing the Sales Department at: ASHRAE, 180 Technology
Parkway, Peachtree Corners, GA 30092. Email: or-
ders@ashrae.org. Fax: 404-321-5479. Telephone: INTERIM MEETINGS
404.636.8400 (worldwide) or toll free at 1.800.527.4723
for orders in the U.S. and Canada. A complete listing of project committee interim meetings
is provided on ASHRAE’s website at: https://
www.ashrae.org/technical-resources/standards-and-
 ANSI/ASHRAE/ASHE Standard 189.3-2021, De- guidelines/project-committee-interim-meetings.
sign, Construction, and Operation of Sustainable
High-Performance Health Care Facilities. ANSI/  SSPC 15, Safety Standard for Refrigeration Systems,
ASHRAE/ASHE Standard 189.3-2021 incorporates will hold webinars on the following dates:
Addenda a, b, and c to ANSI/ASHRAE/ASHE Stand- July 16th, 2021, from 10:00 am to 1:00 PM Eastern
ard 189.3-2017. August 13t 2021, 10:00 am to 1:00 PM Eastern
September 17, 2021, 10:00 am to 1:00 PM Eastern
October 15, 2021, 10:00 am to 1:00 PM Eastern
November 12, 2021, 10:00 am to 1:00 PM Eastern
December 10, 2021, 10:00 am to 1:00 PM Eastern
For additional information, please contact Ryan Shanley,
Staff Liaison to SSPC 15 (rshanley@ashrae.org).

1
Volume XI, Issue 25

June 25, 2021

STANDARDS ACTIONS
INTERIM MEETINGS JOIN A LISTSERVE

 SSPC 185, Methods of Test to Inactivate Microorgan- Click on the following link to learn more about ASHRAE
isms in HVAC Systems with UV-C lights. SSPC 185.2 Standards Activities https://www.ashrae.org/listserves.
subcommittee, Method of Testing Ultraviolet Lamps
for Use in HVAC&R Units or Air Ducts to Inactivate SSPC 41 — Standard Methods for Measurement
Microorganisms on Irradiated Surfaces will hold con-
ference calls from 10:30 am to 12:30 pm (Eastern) on SSPC 62.1 — Ventilation for Acceptable Indoor Air
the following dates: Quality
July 21, 2021
August 11, 2021 SSPC 62.2 — Ventilation and Acceptable Indoor Air
September 1, 2021 Quality in Low-Rise Residential Buildings
September 22, 2021
October 13, 2021 SSPC 90.1 — Energy Standard for Buildings Except
November 3, 2021 Low-Rise Residential Buildings
November 24, 2021
SSPC 90.2 — Energy Efficient Design of Low-Rise Res-
 Standard 185.3 Subcommittee, Method of Testing In- idential Buildings
Room Devices and Systems for Microorganism Re-
moval or Inactivation in a Chamber, will hold confer- SPC 90.4 — Energy Standard for Data Centers and
ence calls from 10:30 am to 12:30 pm (Eastern) on the Telecommunications Buildings
following dates:
July 14, 2021 SSPC 161 — Air Quality within Commercial AirCraft
August 4, 2021
August 25, 2021 SSPC 188 — Legionellosis: Risk Management for
September 15, 2021 Building Water Systems
October 6, 2021
October 27, 2021 SSPC 189.1 — Standard for the Design of High-
November 17, 2021 Performance Green Buildings Except Low-Rise Resi-
For additional information contact Stephen Martin, Chair of dential Buildings
SSPC 185 (smartin1@cdc.gov).
Code Interaction Subcommittee (CIS) Listserve
 SPC 220P, Method of Testing for Rating Small Com-
mercial Blast Chillers, Chiller-Freezers, and Freezers,
will hold a conference call on July 14, 2021May 26,
2021 from 1:00 pm to 3:00 pm (Eastern). For additional
information contact Oliver Ta, Chair of SPC 220
(oliver.ta@sce.com).

 SPC 514P, Risk Management for Building Water Sys-


tems: Physical, Chemical, and Microbial Hazards,
will hold a conference call on Monday, August 2nd,
2021, from 10:00 am to 12:00 pm (Eastern). For addi-
tional information, please contact Ryan Shanley, Staff
Liaison to SPC 514P (rshanley@ashrae.org).

You might also like