2.

MAINTENANCE STANDARDS TEST PROCEDURES

2.1 MAINTENANCE STANDARD


2.1.1 PIN, BUSHING, SPRING, LINING AND SHEAVE
1. Pin, Bushing

d d’
D D’

Pin Bushing

Unit : mm (inch)
Std. dimension Usable limit
Name Location Item Part number Remedy See figure
D d D' d'
44.0 43.82 Fig.2-1
Fr.& Re.Drum 1 JJ82W01013P1 Replace
(1.732) (1.725) (P.2-6)
50.8 50.60 Fig.2-3
Pawl Boom Drum 2 JD01W01019P1 Replace
(2.0) (1.992) (P.2-6)
Luffing Jib 45.0 44.84 Fig.2-5
3 GB82W01008P1 Replace
Drum (1.772) (1.765) (P.2-7)
Pin
165 164.36 Fig.2-7
Boom Foot 4 JD02A01004P1 Replace
(6.496) (6.471) (P.2-7)
110 109.47 Fig.2-11
Luffing Jib Foot 5 JJ13A01016P1 Replace
(4.330) (4.310) (P.2-8)
Strut Foot 80 79.77 Fig.2-11
6 JD12A01003P1 Replace
(Fr. & Re.) (3.150) (3.140) (P.2-8)
44.0 44.26 Fig.2-1
Fr. & Re. Drum 7 2405T1151
(1.732) (1.743) (P.2-6)
Replace
50.8 51.10 Fig.2-3
Pawl Boom Drum 8 JL01W01199P1
(2.0) (2.012) (P.2-6)
Luffing Jib 45.0 45.11 Fig.2-5
9 2405U101D4540 Replace
Bush- Drum (1.772) (1.776) (P.2-7)
ing 165 165.80 Fig.2-7
Boom Foot 10 JD03A01013P1 Replace
(6.500) (6.528) (P.2-7)
110 110.6 Fig.2-11
Luffing Jib Foot 11 JD04A01003P1 Replace
(4.330) (4.354) (P.2-8)
80 80.54 Fig.2-11
Strut Foot (Front) 12 JD04A01004P1 Replace
(3.150) (3.171) (P.2-8)

2-3 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

2. Spring

Free Length Free Length

Unit : mm (inch)
Usable limit of
Location Item Part number Std. Free length Remedy See figure
free length
72 (2.835) Fig.2-1
Fr.& Re.Drum pawl 20 HP26C15002G1 68.4 (2.693)
(Compression) (P.2-6)
42 (1.654) Fig.2-3
21a 2417T335 39.9 (1.571)
(Compression) (P.2-6)
Boom drum pawl Replace
75 (2.953) Fig.2-3
21b 2417T373 71.25 (2.805)
(Compression) (P.2-6)
72 (2.835) Fig.2-5
Jib drum pawl 22 GB82W01004P1 68.4 (2.693)
(Compression) (P.2-7)

CK2500-II, CKE2500-II 2-4


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

3.Sheave

Standard root diameter

40 to 45 deg.
Groove
Radius

Unit : mm (inch)
Std. root Groove
Equipment Item Part number Use limit Remedy See figure
diameter radius
494 ± 1.5 491 14.0 Fig.2-7
Boom point 30 JL06A01004P1
(19.45 ± 0.059) (19.33) (0.55) (P.2-7)
549 546 14.0 Fig.2-7
Idler 31 2407P812
(21.61) (21.50) (0.55) (P.2-7)
for Main 494 ± 1.5 491 14.0 Fig.2-9
32 JL06A01004P1
Auxiliary Boom (19.45 ± 0.059) (19.33) (0.55) (P.2-8)
sheave for Luffing Jib 494 ± 1.5 491 14.0 Fig.2-10
33 JL06A01004P1
or Long Boom (19.45 ± 0.059) (19.33) (0.55) (P.2-8)
428 425 14.5 Fig.2-12
Lower spreader 34 JD61F01028P1
(16.85) (16.73) (0.57) (P.2-9)
494 ± 1.5 491 14.0 Fig.2-13
Mast 35 JL06A01004P1
(19.45 ± 0.059) (19.33) (0.55) (P.2-9)
Luffing boom 494 ± 1.5 491 14.0
36 JL06A01004P1 Replace
point sheave (19.45 ± 0.059) (19.33) (0.55)
or
Luffing boom 494 ± 1.5 491 14.0
37 JL06A01004P1 Build-up
idler sheave (19.45 ± 0.059) (19.33) (0.55)
Taper boom 418 415 12.5
38 JJ06A01010P1
guide sheave (16.46) (16.34) (0.49)
Fr. & Re. strut 418 415 12.5 Fig.2-11
Luffing 39 JD63A01021P1
point sheave (16.46) (16.34) (0.49) (P.2-8)
Fr. strut 494 ± 1.5 491 14.0
40 JL06A01004P1
sheave (19.45 ± 0.059) (19.33) (0.55)
495.6 492.6 14.0
Jib point 41 GG63A01051P1
(19.51) (19.39) (0.55)
495.6 492.6 14.0
Jib idler 42 GG63A01051P1
(19.51) (19.39) (0.55)
494 ± 1.5 491 14.0 Fig.2-12
Gantry peak 43 JL06A01004P1
(19.45 ± 0.059) (19.33) (0.55) (P.2-9)
549 546 14.0 Fig.2-8
Fixed Jib point sheave 44 2407P812
(21.61) (21.50) (0.55) (P.2-7)
549 546 14.0 Fig.2-8
Fixed Jib strut sheave 45 2407P812
(21.61) (21.50) (0.55) (P.2-7)

2-5 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

7 119 m
m (4,6
85 inc
h)

Wear Limit : 3 mm
(0.118 inch)

20

Fig.2-1 Front and Rear Drum Lock Fig.2-2 Front and Rear Drum Lock

21a

21b

Fig.2-3 Boom Drum Lock

inch)
m (6,969
177m

Wear Limit : 3 mm
(0.118 inch)

Fig.2-4 Boom Drum Lock Pawl

CK2500-II, CKE2500-II 2-6


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

125 mm (4.921
inch)
9

Wear Limit : 3 mm
(0.118 inch)
3
Fig.2-6 Luffing Jib Drum Lock Pawl

22

Fig.2-5 Luffing Jib Drum Lock

4 31

10

30

Fig.2-7 Main Boom

44
45

Fig.2-8 Fixed Jib

2-7 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

33

32

Fig.2-10 Aux. Sheave (For Luffing or Long Boom)

Fig.2-9 Aux. Sheave (For Main Boom)

42

41

39
6, 12
40

39 6 5, 11

36

37

38

Fig.2-11 Luffing Boom and Jib

CK2500-II, CKE2500-II 2-8


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

43

34

Fig.2-12 Gantry

35

Fig.2-13 Mast

2-9 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

2.1.2 PROPEL DEVICE


1. Crawler shoe

88 (3.465)

72 (2.835)

(3.973)

(4.370)
111
100
P

R16
(R0.630)

D
16 4)
R2 8.50
(R
178 (7.008)

Wear limit : 2 mm (0.079 inch)


Remedy : Build-up or Replace

Unit : mm (inch)
Std. Dimension Usable limit Remedy
Pin hole (D) 45 (1.772) 47.0 (1.850)
Build-up
Pin 44.45 (1.75) 42.5 (1.673) or
279 Replace
Pitch (P) -
(10.984)

When 6 pcs. shoes are connected by shoe pin and


hanged vertically, distance between pins should be
1671 -6 mm (65.787 inch)

CK2500-II, CKE2500-II 2-10


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

2. Drive tumbler

476.6 (18.764)

472 R13
(18.583) (R0.512)
R51
(R2.009)

48
(1.890)

R13
(R0.512)

Wear limit : 2 mm (0.079 inch)


Remedy : Build-up or Replace

55 R16
(2.165) (R0.63)
86.5 (3.406)

R13
R6 (R0.512)
R16
(R0.63)
5 1)
R1 .59
0 R16 (R0.63)
(R
R476.6 (R18.764)

197 (7.756)

Unit : mm (inch)

2-11 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

3. Idler

A
B

R13
(R0.512)

R19
(R0.748)

110
(4.331) Wear limit : 2 mm (0.079 inch)
Remedy : Build-up or Replace
184
(7.244)

Unit : mm (inch)
Symbol Item Std. Dimension Usable limit Remedy
A Outer diameter 772 (30.394) 764 (30.079) Build-up or Replace
Std.
Tolerance Standard Allowable
Dimension
-0.043
-0.106
Shaft
Gap between of (-0.0017) Gap Replacement of
B 135
shaft and bushing (-0.0042) 0.273-0.386 Bushing
Gap 1.0 (0.0394)
( 5.315) +0.28 (0.0093-
+0.23 0.0152)
Hole
(+0.0110)
(+0.0090)

CK2500-II, CKE2500-II 2-12


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

4. Track roller

242 (9.528)

109 (4.291)

B
A

R15 (R0.591)
R10 (R0.394)

Unit : mm (inch)
Symbol Item Std. Dimension Usable limit Remedy
380
A Outer diameter 372 (14.646) Build-up or Replace
( 14.961)
Std.
Tolerance Standard Allowable Build-up or Replace
Dimension
-0.043
-0.106
Shaft
Gap between of (-0.0017) Gap
B
shaft and bushing 125 (-0.106) 0.273-0.336 Gap Replacement of
(4.921) +0.28 (0.0093- 1.0(0.0394) Bushing
+0.23 0.0152)
Hole
(+0.0110)
(+0.0090)

2-13 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

5. Guide roller

242 (9.528)

130 (5.118)
A

R10 (R0.394) R10 (R0.394)

Unit : mm (inch)
Symbol Item Std. Dimension Usable limit Remedy
265.4
A Outer diameter 257.3 (10.130)
( 10.445) Build-up or Replace
Std.
Tolerance Standard Allowable
Dimension
-0.030
-0.076
Shaft
Gap between of (-0.0012) Gap
B
shaft and bushing 65 (-0.0030) 0.26-0.36 Gap Replacement of
(2.559) +0.28 (0.0102- 0.8 (0.0315) Bushing
+0.23 0.0142)
Hole
(+0.0110)
(+0.0090)

CK2500-II, CKE2500-II 2-14


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

6. Guide bar

A
B
60 (2.362) 60 (2.362)

7 deg.
7 deg.
(5.315)

(3.819)
135

97
A B

Unit : mm (inch)
Symbol Item Std. Dimension Usable limit Remedy
A Height of Guide Bar 135 (5.315) 115 (4.528)
Build-up or Replace
B Height of Guide Bar 97 (3.819) 77 (3.032)

2-15 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

2.2 PERFORMANCE STANDARD AND TEST PROCEDURE


1. TERMINOLOGY
Standard value : Standard of assembling new machine.
When the value exceeds the standard, repair or replace the part as required to maintain ma-
chine performance and or safety.
Temperature of oil : It means temperature of hydraulic oil.
2. As to the items of which limit of use is not shown, referring to standard value as the guidance, repair or replace
the part as required.

2.2.1 OPERATING SPEED

No. Item Test Condision Test Procedure Standard Value


Boom • Engine min : High idling
-1
Measure the time taken to rotate drum 10
Hoisting • Temperature of Hyd. oil : times.
and 45 to 55°C (113 to 131°F) (Start measuring when the rotation of the
1 41 to 49 sec
Lowering • Boom Length : Std. Boom drum becomes stable)
wire rope • Speed adjusting knob :
Speed High Take average of 3 times measuring

• Engine min-1 : High idling Measure the time taken to rotate drum 10
times.
• Temperature of Hyd. oil : Low speed
Main and (Start measuring after the preparation ro-
45 to 55°C (113 to 131°F) 40 to 48 sec
2 Aux. hoisting tates of 10 seconds. Take average of 3 times
• Loading : No load High speed
wire rope measuring.)
• Speed adjusting knob : 9 to 12 sec
High Take average of 3 times measuring
• Engine min : High idling
-1

Measure the time taken to rotate machine


• Temperature of Hyd. oil :
one time.
Swing 45 to 55°C (113 to 131°F)
3 Measure the time for 2nd rotation after 1st 25 to 30 sec
Speed • Boom Length : Standard
preliminary rotation.
Boom
Take average of 3 times measuring.
• Loading : No load
• Engine min-1 : High idling Measure the time taken to propel machine
L=
• Temperature of Hyd. oil : the distance of 20 m (66 ft).
Propel 101 to 119 sec
4 45 to 55°C (113 to 131°F) Propel machine first preliminary more than 2
Speed H=
• Boom Length : m (6.6 ft) before starting the measuring.
60 to 71 sec
Standard Boom Take average of 3 times measuring.
• Engine min-1 : High idling Measure the discrepancy volume resulted
• Temperature of Hyd. oil : from propelling the distance of 20 m (66 ft).
45 to 55°C (113 to 131°F) Propel machine first preliminary more than 2
m (6.6 ft) before starting the measuring.
• Boom Length : Standard
Take average of 3 times measuring.
Boom
Discrepancy

Propelling Within 600 mm


5
Discrepancy (23.6 inch)
volume

20m (66ft)

CK2500-II, CKE2500-II 2-16


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

2.2.2 POINT AND METHOD OF MEASURING PRESSURE


Use a pressure gauge which has a surplus of more than 10 MPa (1450 psi) for pressures to be measured and which
has passed the inspection.
Prior to pressure measurement, clean the port for pressure measurement so as to be free from oil and dust.

Connector and hose for measuring pressure.


Connector : GB03H01085P1
Hose : GG03H01068D1 (KPM004000001-20)
No. Item Test Condition Test Procedure Standard Value
Main • Engine revolution (min-1) : 1. Lower the rear drum hook onto the
• Propel High idling ground.
Left • Temperature of oil : 2. Lock the rear winch drum with the drum
• Rear 45 to 55°C lock.
Drum (113 to 131°F) 3. Make the valve relieve by rear drum winch
lowering operation.

PRESSURE GAUGE RELIEF


PORT (PF 1/4) VALVE 31.9 MPa
1
(4626 psi)
PROPEL
LEFT SIDE
B1 A1

B2 A2
REAR
DRUM

2-17 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

Main • Engine revolution (min-1) : 1. Lower the front drum hook onto the
• Propel High idling ground.
Right • Temperature of oil : 2. Lock the front winch drum with the drum
• Front 45 to 55°C lock.
Drum (113 to 131°F) 3. Make the valve relieve by front drum
• Load safety device : winch lowering operation.
Setting of the crane con-
figuration
(Select of attachment :
Crane) PRESSURE GAUGE
PORT (PF 1/4) RELIEF
VALVE
31.9 MPa
2
PROPEL (4626 psi)
LEFT SIDE
B1 A1

B3

B4 A4
FRONT
DRUM

CK2500-II, CKE2500-II 2-18


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

No. Item Test Condition Test Procedure Standard Value


• Engine revolution (min ) : -1
1. Lower the boom onto the ground.
High idling
2. Lock the boom drum. 32.0 MPa
• Temperature of Hydraulic
3. Make the valve relieve by boom lowering (4640 psi)
oil : 45 to 55°C
operation.
(113 to 131°F)

PRESSURE GAUGE PORT


(PF1/4)

3 Boom

RELIEF VALVE

• Engine revolution (min-1) :


High idling 1. Lock the upper not to turn with the swing
• Temperature of Hydraulic lock pin and parking brake. 27.5 MPa
oil : 45 to 55°C 2. Make the valve relieve by swing opera- (3988 psi)
(113 to 131°F) tion.
• Swing mode : Free high

RELIEF VALVE

4 Swing

PRESSURE
GAUGE PORT (PF 1/4)

2-19 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

No. Item Test Condition Test Procedure Standard Value


Relief Valve
6.6 MPa
(957 psi)
• Temperature of Hydraulic [Low idling]
Remove the cap of plug installed in valve
oil : 45 to 55°C Pressure Reducing
block and install the pressure gauge.
(113 to 131°F) Valve
5.4 MPa
(783 psi)
[Low idling]

Control Circuit
5 (Primary
pressure)

PRESSURE RELIEF VALVE


REDUCING

PRESSURE REDUCING VALVE RELIEF VALVE PRESSURE


PRESSURE GAUGE PORT GAUGE PORT

1. Operate the control lever for the sec-


tion to be measured.
(Operate the speed adjusting knod to
the Max. position)
Take pressure out from the quick cou-
pler of the control valve spool end.

• Engine revolution (min-1) :


Control
Low idling Standard value
Circuit
6 • Temperature of Hydraulic 2.65 to 2.94 MPa
(Secondary Front & Rear Drum
(363 to 405 psi)
oil : 45 to 55°C
pressure)
(113 to 131°F) Propel 1.42 to 1.62 MPa
(206 to 235 psi)

Swing 1.62 to 1.81 MPa


(235 to 262 psi)

Third (Jib) [Option] 2.75 to 3.24 MPa


(384 to 426 psi)

Boom 2.50 to 2.79 MPa


(399 to 470 psi)

CK2500-II, CKE2500-II 2-20


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

No. Item Test Condition Test Procedure Standard Value


Raise :
20.6 MPa
• Engine revolution (min-1) : (2987 psi)
1. Relief by raising the mast cylinder.
High idling Lower :
2. Relief by lowering the gantry cylinder.
• Temperature of Hydraulic 4.9 MPa
3. Relief by operating crawler fixing pin (711 psi)
oil : 45 to 55°C
cylinder.
(113 to 131°F) Lower Circuit :
20.6 MPa
(2987 psi)

• Mast raising/
7 lowering
• Lower circuit

GAUGE
PORT (PF 1/4) PORT RELIEF VALVE
(MAST RAISING)
20.6 MPa (2987 psi)

PORT RELIEF VALVE


(MAST LOWERING)
4.9 MPa (711 psi)

MAIN RELIEF VALVE


(MAST RAISING & LOWER CIRCUIT)
20.6MPa (2987 psi)

2-21 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

No. Item Test Condition Test Procedure Standard Value


• Engine revolution (min ) : -1

High idling
1. Relief by raising the counterweight re- 21.0 MPa
• Temperature of Hydraulic
moval / installation cylinder. (3045 psi)
oil : 45 to 55°C
(113 to 131°F)

Counterweight
and
8
Gantry raising/
lowering

PRESSURE GAUGE
PORT (PF 1/4)

RELIEF VALVE

CK2500-II, CKE2500-II 2-22


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

2.2.3 SLEWING RING

WITHIN
100 mm (3.94 inch)
REVOLVING FRAME

DIAL
GAUGE

LOWER FRAME

COUNTERWEIGHT : Upper : 8 pcs. (97 t), Lower : 2 pcs. (20 t), 117 t in total
Condition of measurement Amount of play
Boom length (Standard boom) : 18.4 m (60.4 ft)
Radius : 10.0 m (32.9 ft) Less than 3 mm (0.118 inch)
Load : 116.3 t

2-23 CK2500-II, CKE2500-II


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.
2. MAINTENANCE STANDARDS TEST PROCEDURES

2.2 PERFORMANCE STANDARD AND TEST PROCEDURE


1. TERMINOLOGY
Standard value : Standard of assembling new machine.
When the value exceeds the standard, repair or replace the part as required to maintain ma-
chine performance and or safety.
Temperature of oil : It means temperature of hydraulic oil.
2. As to the items of which limit of use is not shown, referring to standard value as the guidance, repair or replace
the part as required.

2.2.1 OPERATING SPEED

No. Item Test Condision Test Procedure Standard Value


Boom • Engine min : High idling
-1
Measure the time taken to rotate drum 10
Hoisting • Temperature of Hyd. oil : times.
and 45 to 55°C (113 to 131°F) (Start measuring when the rotation of the
1 41 to 49 sec
Lowering • Boom Length : Std. Boom drum becomes stable)
wire rope • Speed adjusting knob :
Speed High Take average of 3 times measuring

• Engine min-1 : High idling Measure the time taken to rotate drum 10
times.
• Temperature of Hyd. oil : Low speed
Main and (Start measuring after the preparation ro-
45 to 55°C (113 to 131°F) 40 to 48 sec
2 Aux. hoisting tates of 10 seconds. Take average of 3 times
• Loading : No load High speed
wire rope measuring.)
• Speed adjusting knob : 9 to 12 sec
High Take average of 3 times measuring
• Engine min : High idling
-1

Measure the time taken to rotate machine


• Temperature of Hyd. oil :
one time.
Swing 45 to 55°C (113 to 131°F)
3 Measure the time for 2nd rotation after 1st 25 to 30 sec
Speed • Boom Length : Standard
preliminary rotation.
Boom
Take average of 3 times measuring.
• Loading : No load
• Engine min-1 : High idling Measure the time taken to propel machine
L=
• Temperature of Hyd. oil : the distance of 20 m (66 ft).
Propel 101 to 119 sec
4 45 to 55°C (113 to 131°F) Propel machine first preliminary more than 2
Speed H=
• Boom Length : m (6.6 ft) before starting the measuring.
60 to 71 sec
Standard Boom Take average of 3 times measuring.
• Engine min-1 : High idling Measure the discrepancy volume resulted
• Temperature of Hyd. oil : from propelling the distance of 20 m (66 ft).
45 to 55°C (113 to 131°F) Propel machine first preliminary more than 2
m (6.6 ft) before starting the measuring.
• Boom Length : Standard
Take average of 3 times measuring.
Boom
Discrepancy

Propelling Within 600 mm


5
Discrepancy (23.6 inch)
volume

20m (66ft)

CK2500-II, CKE2500-II 2-16


Copyright © 2018 Kobelco Construction Machinery Co.,Ltd. All right reserved.