UPPERSTRUCTURE / Pump Device

23. Install gears (27) and (29) onto shafts (13) and 26. Apply THREEBOND #1215 to the mounting sur-
(19), aligning the matching marks made when face of pilot pump (39), install the pilot pump to
disassembling, and install retaining rings (26) (2 gear casing (47) with socket bolts (36), spring
used). washers (37), washers (38) (2 for each).
When replacing the shafts and gears, install the : 8 mm
gear according to the following procedure. : 49 N⋅m (5 kgf⋅m, 36 Ibf⋅ft)
• Secure the special tool (ST 7934) to the mounting
surface of shafts (13) and (19) for plunger (17) . 27. Install gasket (32), pipe (34) to gear casing (47).
Tighten them with socket bolts (33) (2 used).
19 : 6 mm
: 19.5 N⋅m (2 kgf⋅m, 14 Ibf⋅ft)
ST 7934 13
28. Install levers (60), pins (78), retaining rings (58) (4
for each) to links (79) (2 used).

IMPORTANT: If link (79) is distorted, the pump


performance will be changed. Do not
M8, Pitch 1.25 W137-02-04-029 apply unreasonable loads.

• Turn shafts (13) and (19) clockwise, viewed from 29. Install the link (79) assemblies (2 used), aligning
the mounting side of gears (27) and (29), until it the groove for pin (57) in pump casing (51). At this
comes into contact with the special tool. (To re- time, lever (60) faces selector head (66).
move the play in periphery direction)
• Install gear (27) and retaining ring (26) to the NOTE: Both surfaces of pin (57) are parallel to
spline of shaft (13). each other. Insert the pin aligning the par-
• Install gear (29) onto the spline of shaft (19), with allel face with the groove.
engaging to gear (27). If it does not engage, turn
57
shaft (19) in the play range of special tool to find 79
the engaging position. 51
• Install retaining ring (26) to the spline of shaft
(19).
• Remove the special tool.

24. Tap spring pins (48) (2 used) into gear casing (47), Parallel Face Parallel Face W176-02-04-016
and install gasket (28).
30. Apply hydraulic oil to the plunger (17) mounting
CAUTION: Pump casing weight: 70 kg (154 lb) surface of shafts (13) and (19).

25. Install eye bolts (M12, Pitch 1.75) (2 used) to the 31. Insert plungers (17) (7 for each) into shafts (13)
threaded hole for socket bolt (71) in pump casing and (19).
(51), lift it up by crane.
Engaging gear (43) and gear (29), install the 32. Apply a film of grease to pins (14) (2 used), and
gears into gear casing (47). Install the gear casing then install them to center shafts (15) (2 used).
to the pump casing with bolts (53), spring wash-
ers (52) (6 for each). 33. Apply a film of grease to the spherical surface of
: 24 mm center shafts (15) (2 used), and then install them
: 147 N⋅m (15 kgf⋅m, 108 Ibf⋅ft) to shafts (13) and (19).

W2-4-17