Professional Documents
Culture Documents
Context Technical
The primary tools used for the project include selecting a contracting method based on project
3.3.1 Information
The Doyle Drive project, also known as Presidio Parkway, is a unique project that is one
gateway to the Golden Gate Bridge in San Francisco, California. The Doyle Drive corridor, 1.5
miles in length, was originally built in 1936 to usher traffic through the Presidio military base to
connect San Francisco and the Golden Gate Bridge. Doyle Drive is located in a high seismic
hazard zone, and the original structure was not built to withstand projected earthquakes. Seismic
retrofit was completed in 1995, which was intended to last for 10 years. The project is actually
24
PixelPlanet PdfPrinter Demoversion - https://www.pixelplanet.de/pdfprinter-info.html
eight different contracts that will result in a new roadway, new structures that include bridges
3.3.2 Complexity
Contributing to the complexity of this project is the number of different finance sources being
used for this project (see Figure 3.3). In addition, one of the contracts still in the planning phase
is expected to be PPP.
Context Technical
The primary tools for this project include multiple contracts, various project delivery methods,
25
PixelPlanet PdfPrinter Demoversion - https://www.pixelplanet.de/pdfprinter-info.html