HABIB CONSTRUCTION SERVICES


CONSTRUCTION OF SIGNAL FREE JUNCTION
AT NEW AZADI CHOWK
STR. TYPE: Foundation BAR BENDING SCHEDULE: Pier #25A
CLEAR CONC. COVER: 75 mm PILE LENGTH 38.000m
REF. DWG NO: PILE DIA: 1.200 m

C/C Length Each Bend Cut Length


Dia Of Bar Unit wt Total Weight
Spacing Total No. of Bar Deduction Each Bar Total Payable
Description No. of Items Bar Shape
Bars Length(m)
(#) (mm) (M) (mm) (M) (Kg/m) (Kg)

550 1000
PCOL
1st Cage
#11 - 20 01 12.000 110 11.890 237.800 7.907 1880.285
(Section A-A) 10450

LAP =2160

2nd Cage 9840


#8 - 20 01 12.000 00 12.000 240.000 3.973 953.520
(Section B-B)

LAP =1570

3rd Cage 10430


#6 - 20 01 12.000 00 12.000 240.000 2.235 536.400
(Section C-C)

LAP =945

4th Cage 7.205


#6 - 20 01 08.550 50 8.500 170.000 2.235 379.950
(Section C-C)
400

ᴫ*(1.05+.013) *)1+1+3./10.95(=
+(8*.013)
Spiral (L=10.950m)
#4 100 31.595 01 12.000 00 12.000 379.139 0.994 376.864
(Section A-A)

100

Over Laps #4 - 31 01 00.630 00 0.630 19.530 0.994 19.413

____________________SUBMITTED BY ____________________CHECKED BY ____________________APPROVED BY


Page 2 of 19

HABIB CONSTRUCTION SERVICES


CONSTRUCTION OF SIGNAL FREE JUNCTION
AT NEW AZADI CHOWK
STR. TYPE: Foundation BAR BENDING SCHEDULE: Pier #25A
CLEAR CONC. COVER: 75 mm PILE LENGTH 38.000m
REF. DWG NO: PILE DIA: 1.200 m

C/C Length Each Bend Cut Length


Dia Of Bar Unit wt Total Weight
Spacing Total No. of Bar Deduction Each Bar Total Payable
Description No. of Items Bar Shape
Bars Length(m)
(#) (mm) (M) (mm) (M) (Kg/m) (Kg)

ᴫ*(1.05+.010) *)1+3./9.84(=
+(8*.010)
Spiral (L=9.840m)
#3 100 28.146 01 12.000 00 12.000 337.751 0.560 189.141
(Section B-B)

100

Over Laps #3 - 28 01 00.475 00 0.475 13.300 0.560 7.448

ᴫ*(1.05+.010) *)2+1+3./17.635(=
+(8*.010)
Spiral (L=17.635m)
#3 200 25.586 01 12.000 00 12.000 307.031 0.560 171.937
(Section C-C)

200

Over Laps #3 - 25 01 00.475 00 0.475 11.875 0.560 6.650

____________________SUBMITTED BY ____________________CHECKED BY ____________________APPROVED BY


Page 3 of 19

HABIB CONSTRUCTION SERVICES


CONSTRUCTION OF SIGNAL FREE JUNCTION
AT NEW AZADI CHOWK
STR. TYPE: Foundation BAR BENDING SCHEDULE: Pier #25A
CLEAR CONC. COVER: 75 mm PILE LENGTH 38.000m
REF. DWG NO: PILE DIA: 1.200 m

C/C Length Each Bend Cut Length


Dia Of Bar Unit wt Total Weight
Spacing Total No. of Bar Deduction Each Bar Total Payable
Description No. of Items Bar Shape
Bars Length(m)
(#) (mm) (M) (mm) (M) (Kg/m) (Kg)

100
Stifner/
Inner Holding Ring #6 4000 03 01 03.091 00 3.091 9.272 2.235 20.724 Dia= 952
Uper Spiral

100
Stifner/
Inner Holding Ring #6 4000 03 01 03.116 00 3.116 9.348 2.235 20.892 Dia= 960
Middle Spiral

100
Stifner/
Inner Holding Ring #6 4000 05 01 03.179 00 3.179 15.894 2.235 35.523 Dia= 980
Lower Cage

DIA OF BAR # #3 #4 #5 #6 #7 #8 #11 TOTAL Tons


4598.746
WEIGHT (Kgs) 375.176 396.277 0.000 993.489 0.000 953.520 1880.285 4598.746 4.599

____________________SUBMITTED BY ____________________CHECKED BY ____________________APPROVED BY


Page 4 of 19

MANCAVE

Name of Client: SUNSET GROUP


STR. TYPE: GROUND SLAB BAR BENDING SCHEDULE: SLAB

REF. DWG NO: 1 CLEAR CONC. COVER: 3/4"

Bar Total Cut Unit


Dia of Nos of Bars Total Nos Cut Length Bend Ded. Total Length Total Weight
Position Description Length Weight Bar Shape Remarks
Bars (1 x 1 x 1) of Bars (ft) (in) (ft) (KG)
No. (ft) (kg/ft)

REINFORCEMENT SLAB

01 BARS #3@8" C/C #3 28 X 1 X 1 28 20' - 0'' 0.00'' 20.00' 560.00' 0.171 95.76

02 BARS #3@8" C/C #3 18 X 1 X 1 18 19' - 0'' 0.00'' 19.00' 342.00' 0.171 58.48

03 BARS #3@7" C/C #3 26 X 1 X 1 26 18' - 8'' 0.00'' 18.67' 485.33' 0.171 82.99

04 BARS #3@6" C/C #3 20 X 1 X 1 20 19' - 2'' 0.00'' 19.17' 383.33' 0.171 65.55

05 BARS #3@6" C/C #3 26 X 1 X 1 26 19' - 0'' 0.00'' 19.00' 494.00' 0.171 84.47

06 BARS #3@7" C/C #3 34 X 1 X 1 34 18' - 0'' 0.00'' 18.00' 612.00' 0.171 104.65

07 BARS #3@7" C/C #3 20 X 1 X 2 40 10' - 4'' 0.00'' 10.33' 413.33' 0.171 70.68

08 BARS #3@6" C/C #3 14 X 1 X 2 28 12' - 0'' 0.00'' 12.00' 336.00' 0.171 57.46

09 BARS #3@9" C/C #3 22 X 1 X 1 22 15' - 3'' 0.00'' 15.25' 335.50' 0.171 57.37

10 BARS #3@9" C/C #3 9 X 1 X 1 9 5' - 11'' 0.00'' 5.92' 53.25' 0.171 9.11

11 BARS #3@9" C/C #3 40 X 1 X 2 80 27' - 0'' 0.00'' 27.00' 2160.00' 0.171 369.36

TOTAL WEIGHT IN= 1,055.88 KG

Dia of Bar #3 #4 #5 #6 #8 #10 1.0559 TON


Weight (KG) 1055.882 0.000 0.000 0.000 0.000 0.000

Submitted By:-_____________________________ Checked By:-_____________________________


Page 5 of 19

MANCAVE

Name of Client: SUNSET GROUP


STR. TYPE: GROUND BEAM BAR BENDING SCHEDULE: BEAM

REF. DWG NO: 1 CLEAR CONC. COVER: 1"

Bar Dia of Bend Total Cut Unit


Nos of Bars Total Nos of Cut Length Total Length Total Weight
Position Description Bars Ded. Length Weight Bar Shape Remarks
(1 x 1 x 1) Bars (ft) (ft) (KG)
No. (in) (ft) (kg/ft)

GB-12X15

01 BARS 4#6 #6 6 X 1 X 1 6 70' - 0'' 0.00'' 70.00' 420.00' 0.681 286.02

02 BARS 4#6 #6 4 X 1 X 1 4 24' - 0'' 0.00'' 24.00' 96.00' 0.681 65.38

03 BARS 4#8 #8 4 X 1 X 1 4 39' - 0'' 0.00'' 39.00' 156.00' 1.211 188.92

04 BARS 4#6 #6 4 X 1 X 1 4 115' - 0'' 0.00'' 115.00' 460.00' 0.681 313.26

LINTELS 4#4 #4 4 X 1 X 1 4 42' - 0'' 0.00'' 42.00' 168.00' 0.303 50.90

05 BARS #3@7" C/C #3 290 X 1 X 1 290 4' - 5'' 0.00'' 4.42' 1280.83' 0.171 219.02

TOTAL WEIGHT IN= 1,123.50 KG

Dia of Bar #3 #4 #6 #8 #10


1.123 TON
Weight (KG) 219.023 50.904 664.656 188.916

Submitted By:-_____________________________ Checked By:-_____________________________


Page 6 of 19

MANCAVE

Name of Client: SUNSET GROUP


STR. TYPE: GROUND BEAM BAR BENDING SCHEDULE: BEAM

REF. DWG NO: 1 CLEAR CONC. COVER: 1"

Bar Dia of Bend Total Cut Unit


Nos of Bars Total Nos of Cut Length Total Length Total Weight
Position Description Bars Ded. Length Weight Bar Shape Remarks
(1 x 1 x 1) Bars (ft) (ft) (KG)
No. (in) (ft) (kg/ft)

GB-12X15

01 BARS 4#6 #6 6 X 1 X 1 6 70' - 0'' 0.00'' 70.00' 420.00' 0.681 286.02

02 BARS 4#6 #6 4 X 1 X 1 4 24' - 0'' 0.00'' 24.00' 96.00' 0.681 65.38

03 BARS 4#8 #8 4 X 1 X 1 4 55' - 0'' 0.00'' 55.00' 220.00' 1.211 266.42

04 BARS 4#6 #6 4 X 1 X 1 4 119' - 0'' 0.00'' 119.00' 476.00' 0.681 324.16

05 BARS #3@7" C/C #3 290 X 1 X 1 290 4' - 5'' 0.00'' 4.42' 1280.83' 0.171 219.02

TOTAL WEIGHT IN= 1,160.99 KG

Dia of Bar #3 #4 #6 #8 #10


1.161 TON
Weight (KG) 219.023 0.000 675.552 266.420

Submitted By:-_____________________________ Checked By:-_____________________________


MANCAVE STEEL SUMMARY (ALL FLOORS)

Location Item # 3 Bar Weight # 4 Bar Weight # 6 Bar Weight # 8 Bar Weight Total Weight Unit

GROUND SLABS+
FLOOR BEAMS
1275 51 665 189 2179 Kg

TOP BEAMS BEAMS 219 0 676 266 1161 Kg

Total Weight (KG)


1613 55 1447 492 3608 Kg
Incl. Wastage

TOTAL 3.61 Ton


Page 8 of 19

SHERATON GOLF RESORT HOTEL ISLAMABAD


BAHRIA TOWN (GOLF CITY), ISLAMABAD
Name of Contractor: HABIB CONSTRUCTION SERVICES (PVT) LTD
STR. TYPE: B-4 Raft BAR BENDING SCHEDULE: R-2,B-4

REF. DWG NO: S-09, S-10, S-11A, S-11B CLEAR CONC. COVER: 2"

C/C Length Each Bend


Dia of Bar Cut Length Unit wt Total Weight
Spacing Total No. of Bar Deduction Total Payable
Description No. of Items
Bars Length(ft)
(#) (mm) (ft) (ft) (ft) (Kg/ft) (Kg)

Main Bars Top & Bottom

#10@6" c/c 26'-1" ~ 31'-0" (avg. 28'-6").#10 6" 8 02 32.920 0.208 32.712 523.387 1.950 1020.604

#10@6" c/c 31'-8" ~ 50'-0" (avg. 40'-8").#10 6" 28 02 50.330 0.208 50.122 2806.813 1.950 5473.286

#10
#10@ 6" c/c 34'-3" ~ 49'-10" (avg. 42'-0"). 6" 187 02 51.580 0.208 51.372 19213.003 1.950 37465.357

Distibution Bars Top & Bottom

#10@ 6" c/c 11'-4" ~ 16'-0" (avg. 13'-8")#10 6" 4 02 18.000 0.208 17.792 142.333 1.950 277.550

#10@ 6" c/c 22'-7" ~ 30'-3" (avg. 26'-5")#10 6" 7 02 30.750 0.208 30.542 427.583 1.950 833.788

#10
#10@ 6" c/c 31'-6" ~ 68'-11"(avg. 50'-3") 6" 21 02 59.750 0.208 59.542 2500.750 1.950 4876.463

#10
#10@ 6" c/c 73'-3" ~ 103'-6"(avg. 88'-4.5") 6" 8 02 103.125 0.208 102.917 1646.667 1.950 3211.000

4'-4"
#10
#10@ 6" c/c 107'-11" ~ 112'-3"(avg. 110'-1") 6" 2 02 129.920 0.208 129.712 518.847 1.950 1011.751

Submitted By:-_____________________________ Checked By:-_____________________________


Page 9 of 19

SHERATON GOLF RESORT HOTEL ISLAMABAD


BAHRIA TOWN (GOLF CITY), ISLAMABAD
Name of Contractor: HABIB CONSTRUCTION SERVICES (PVT) LTD
STR. TYPE: B-4 Raft BAR BENDING SCHEDULE: R-2,B-4

REF. DWG NO: S-09, S-10, S-11A, S-11B CLEAR CONC. COVER: 2"

C/C Length Each Bend


Dia of Bar Cut Length Unit wt Total Weight
Spacing Total No. of Bar Deduction Total Payable
Description No. of Items
Bars Length(ft)
(#) (mm) (ft) (ft) (ft) (Kg/ft) (Kg)

4'-4"
#10
#10@ 6" c/c 106'-4" ~ 116'-4"(avg. 111'-4") 6" 36 02 131.250 0.208 131.042 9435.000 1.950 18398.250

#10
#10@ 6" c/c 99'-10" ~ 105'-11"(avg. 102'-10.5") 6" 22 02 117.605 0.208 117.397 5165.453 1.950 10072.634

Chairs 6'-0" Edge to Edge

Chairs #8 6 59 01 14.000 0.833 13.167 776.833 1.210 939.968

Additional Bars with Chairs

#8 - 1 01 25.500 0.000 25.500 25.500 1.210 30.855

Lap-1 #8 - 1 01 73.280 0.000 73.280 73.280 1.210 88.669

Lap-2 #8 - 1 01 120.000 0.000 120.000 120.000 1.210 145.200

Lap-2 #8 - 1 01 120.000 0.000 120.000 120.000 1.210 145.200

Lap-2 #8 - 1 01 118.160 0.000 118.160 118.160 1.210 142.974

Submitted By:-_____________________________ Checked By:-_____________________________


Page 10 of 19

SHERATON GOLF RESORT HOTEL ISLAMABAD


BAHRIA TOWN (GOLF CITY), ISLAMABAD
Name of Contractor: HABIB CONSTRUCTION SERVICES (PVT) LTD
STR. TYPE: B-4 Raft BAR BENDING SCHEDULE: R-2,B-4

REF. DWG NO: S-09, S-10, S-11A, S-11B CLEAR CONC. COVER: 2"

C/C Length Each Bend


Dia of Bar Cut Length Unit wt Total Weight
Spacing Total No. of Bar Deduction Total Payable
Description No. of Items
Bars Length(ft)
(#) (mm) (ft) (ft) (ft) (Kg/ft) (Kg)

Lap-2 #8 - 1 01 112.420 0.000 112.420 112.420 1.210 136.028

Submitted By:-_____________________________ Checked By:-_____________________________


Page 11 of 19

SHERATON GOLF RESORT HOTEL ISLAMABAD


BAHRIA TOWN (GOLF CITY), ISLAMABAD
Name of Contractor: HABIB CONSTRUCTION SERVICES (PVT) LTD
STR. TYPE: B-4 Raft BAR BENDING SCHEDULE: R-2,B-4

REF. DWG NO: S-09, S-10, S-11A, S-11B CLEAR CONC. COVER: 2"

C/C Length Each Bend


Dia of Bar Cut Length Unit wt Total Weight
Spacing Total No. of Bar Deduction Total Payable
Description No. of Items
Bars Length(ft)
(#) (mm) (ft) (ft) (ft) (Kg/ft) (Kg)

Construction Joint Portion With Mesh (Shop Drawing S-02)

Bars Embedded with Next


Pour
#6 12" 144 02 07.150 0.000 07.150 2059.200 0.680 1400.256

Bars Embedded with Next


Pour
#6 12" 144 01 07.150 0.000 07.150 1029.600 0.680 700.128

Long Bars #6 18" 5 01 29.000 0.000 29.000 145.000 0.680 98.600

Long Bars #6 18" 5 01 72.125 0.000 72.125 360.625 0.680 245.225

Long Bars #6 18" 5 01 48.750 0.000 48.750 243.750 0.680 165.750

Retaining Wall Dowel (Outer Walls 4'Wide)

Outer Side
Grid: AB-AE
#8 4" 380 01 18.250 0.208 18.042 6855.833 1.210 8295.558

Outer Side
Grid: A14-A16
#8 4" 105 01 18.250 0.208 18.042 1894.375 1.210 2292.194

Inner Side
Grid: AB-AE
#8 4" 269 01 18.250 0.208 18.042 4853.208 1.210 5872.382

Inner Side
Grid: A14-A16
#8 4" 119 01 18.250 0.208 18.042 2146.958 1.210 2597.820

Submitted By:-_____________________________ Checked By:-_____________________________


Page 12 of 19

SHERATON GOLF RESORT HOTEL ISLAMABAD


BAHRIA TOWN (GOLF CITY), ISLAMABAD
Name of Contractor: HABIB CONSTRUCTION SERVICES (PVT) LTD
STR. TYPE: B-4 Raft BAR BENDING SCHEDULE: R-2,B-4

REF. DWG NO: S-09, S-10, S-11A, S-11B CLEAR CONC. COVER: 2"

C/C Length Each Bend


Dia of Bar Cut Length Unit wt Total Weight
Spacing Total No. of Bar Deduction Total Payable
Description No. of Items
Bars Length(ft)
(#) (mm) (ft) (ft) (ft) (Kg/ft) (Kg)

Retaining Wall Dowel (Lift & Stair Walls)

65+58
Outer Bars (Long Side) #8 6" 01 18.250 0.208 18.042 2219.125 1.210 2685.141
123
24+17
Outer Bars (Short Side) #8 6" 01 18.250 0.208 18.042 685.583 1.210 829.556
38
60+53
Inner Bars (Long Side #8 6" 01 18.250 0.208 18.042 2038.708 1.210 2466.837
113
18+11
Inner Bars (Short Side) #8 6" 01 18.250 0.208 18.042 685.583 1.210 829.556
38
Outer & Inner Bars (Middle
Wall)
#8 6" 18 02 18.250 0.208 18.042 649.500 1.210 785.895

Outer Bars of Stair


Pressurization Shaft Wall
#4 6" 34 01 18.250 0.208 18.042 613.417 0.303 185.865

Outer Bars of Stair


Pressurization Shaft Wall
#4 6" 29 01 18.250 0.208 18.042 523.208 0.303 158.532

Stair Dowels

Outer Side #4 4" 12 01 09.670 0.417 09.253 111.040 0.303 33.645

Submitted By:-_____________________________ Checked By:-_____________________________


Page 13 of 19

SHERATON GOLF RESORT HOTEL ISLAMABAD


BAHRIA TOWN (GOLF CITY), ISLAMABAD
Name of Contractor: HABIB CONSTRUCTION SERVICES (PVT) LTD
STR. TYPE: B-4 Raft BAR BENDING SCHEDULE: R-2,B-4

REF. DWG NO: S-09, S-10, S-11A, S-11B CLEAR CONC. COVER: 2"

C/C Length Each Bend


Dia of Bar Cut Length Unit wt Total Weight
Spacing Total No. of Bar Deduction Total Payable
Description No. of Items
Bars Length(ft)
(#) (mm) (ft) (ft) (ft) (Kg/ft) (Kg)

Inner Side #4 4" 12 01 08.420 0.417 08.003 96.040 0.303 29.100

Slab Bottom Bars #4 4" 12 01 14.090 0.417 13.673 164.080 0.303 49.716

Column Dowel

C-3 #8 - 32 01 13.330 0.208 13.122 419.893 1.210 508.071

C-3A #8 - 24 01 13.330 0.208 13.122 314.920 1.210 381.053

C-5 #8 - 24 01 13.330 0.208 13.122 314.920 1.210 381.053

C-12 #8 - 38 01 13.330 0.208 13.122 498.623 1.210 603.334

DIA OF BAR # #3 #4 #6 #8 #10 TOTAL


115864.844
WEIGHT (Kgs) 0.000 456.859 2609.959 30157.344 82640.682 115864.844

Submitted By:-_____________________________ Checked By:-_____________________________


Page 14 of 19

RESORT HOTEL ISLAMABAD


N (GOLF CITY), ISLAMABAD

Bar Shape

4'-4"
28'-7"

4'-4" 10'-4"
35'-8"

4'-4" 11'-7"
35'-8"

4'-4"
13'-8"

4'-4"
26'-5"

4'-4" 19'-9"
35'-8"

4'-4" 40'-0"
35'-8" 23'-1.5"

4'-4" 40'-0" 9'-11"


35'-8" 40'-0"

Submitted By:-_____________________________ Checked By:-_____________________________


Page 15 of 19

RESORT HOTEL ISLAMABAD


N (GOLF CITY), ISLAMABAD

Bar Shape

4'-4" 40'-0" 11'-3"


35'-8" 40'-0"

4'-4" 40'-0"
35'-8" 37'-7"

2'-6"

4'-3"
4'-3"

1'-6" 1'-6"

25'-6"

40'-0" 33'-3"

40'-0" 40'-0" 40'-0"

40'-0" 40'-0" 40'-0"

40'-0" 40'-0" 38'-2"

Submitted By:-_____________________________ Checked By:-_____________________________


Page 16 of 19

RESORT HOTEL ISLAMABAD


N (GOLF CITY), ISLAMABAD

Bar Shape

40'-0" 40'-0" 32'-5"

Submitted By:-_____________________________ Checked By:-_____________________________


Page 17 of 19

RESORT HOTEL ISLAMABAD


N (GOLF CITY), ISLAMABAD

Bar Shape

1'-0"
5'-2"

1'-0"

1'-0"
5'-2"

1'-0"

29'-0"

40'-0" 32'-1.5"

40'-0" 8'-9"

5'-0"
13'-3"

5'-0"
13'-3"

5'-0"
13'-3"

5'-0"
13'-3"

Submitted By:-_____________________________ Checked By:-_____________________________


Page 18 of 19

RESORT HOTEL ISLAMABAD


N (GOLF CITY), ISLAMABAD

Bar Shape

5'-0"
13'-3"

5'-0"
13'-3"

5'-0"
13'-3"

5'-0"
13'-3"

5'-0"
13'-3"

5'-0"
13'-3"

5'-0"
13'-3"

2'-6"

4'-9"

2'-3"

Submitted By:-_____________________________ Checked By:-_____________________________


Page 19 of 19

RESORT HOTEL ISLAMABAD


N (GOLF CITY), ISLAMABAD

Bar Shape

9"

5'-5"

2'-3"

8"
12'-5"

1'-0"

1'-4"
12'-0"

1'-11 1/2"
3"
1'-4"
12'-0"

1'-11 1/2"
3"
1'-4"
12'-0"

1'-4"
12'-0"

Tons
115.865

Submitted By:-_____________________________ Checked By:-_____________________________