REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGION IV-A
BATANGAS I DISTRICT ENGINEERING OFFICE
KUMINTANG ILAYA, BATANGAS CITY

C.Y. 2020 PROJECT


PLAN FOR
CONSTRUCTION OF MULTI-PURPOSE BUILDING,
{BARANGAY HALL},
BRGY. MALALAY, BALAYAN,BATANGAS

SUBMITTED: RECOMMENDED: APPROVED:

FLORENCIA G. CORDOVA BENCIO A. AGUZAR JOEL F. LIMPENGCO


CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE: DATE: OATE:
TABLE OF CONTENTS

M A R K DESCRIPTION

G - 1 PERSPECTIVE SITE DEVELOPMENT PLAN,


LOCATION MAP, TABLE OF CONTENTS

G-2
R
A - 1

A - 2 SUMMARY OF QUANTITIES, FRONT


ELEVATION, RIGHT SIDE ELEVATION,
REAR ELEVATION, LEFT SIDE ELEVATION
A-3 REFLECTED CEILING PLAN (SECOND FLOOR)
DETAIL OF CEILING

A-4 LONGITUDINAL SECTION THRU A - A, CROSS


SECTION THRU B - B, TOILET DETAIL, SCHEDULE
OF DOORS AND WINDOWS

A-5 STAIR PLAN, SECTION, DETAIL OF RAILINGS

S - 1 FOUNDATION PLAN, DETAIL OF Wl, Fl, DETAIL OF


W2, F2, STAIR DETAIL - 1, STAIR DETAIL - 2,
DETAIL OF TIE BEAM

S-2 DETAIL OF Cl, F2, DETAIL OF Cl,Fl, DETAIL OF


Cl,C3,F3, DETAIL OF C2,Fl

S-3 SECOND FLOOR FRAMING PLAN, DETAIL OF


CONCRETE SLAB, SCHEDULE OF BEAMS, ELEVATION
OF BEAM

S-4 ROOF FRAMING PLAN, DETAIL OF RAFTER, ROOF,


BEAM DETAIL, DETAIL OF EAVES, DETAILED
CONNECTION OF PARAPHET, DETAIL OF CEILING

E - 1 GENERAL NOTES (ELECTRICAL), LEGEND, RISER


DIAGRAM, LOAD SCHEDULE AND COMPUTATION,
LOCATION MAP, GROUND FLOOR LIGHTING
LAYOUT, SECOND FLOOR LIGHTING LAYOUT,
GROUND FLOOR POWER LAYOUT, SECOND FLOOR
,. POWER LAYOUT

:z p - 1 GROUND FLOOR WATER LAYOUT, SECOND FLOOR


WATER LAYOUT
" P - 2 GENERAL NOTES, LEGEND, DETAIL OF SEPTIC
VAULT, ISOMETRIC VIEW, LOCATION MAP

TO CALATAGAN, ~~~
LIAN, NASUGBU ~\S
SITE DEVELOPMENT PLAN LOCATION MAP
NDT TO SCALE TO SCALE

PROJECT NAME AND LOCATION: SHEET CONTENT: ITTO: SUBMITTED BY: RECOMMEHOUIG APPROVAL APPROVEDBY: SET NO. SHEET NO

DEPARTMENT ~;--~::L;:;:~;;;AND HIGHWAYS


CONSTRUCTION OF
PERSPECTIVE
OFFICE OF THE DISTRICTENGINEER SITE DEVELOPMENT PLAN
BATANGASI DISTRICTENGINEERINGOFFlCE MULTI-PURPOSE BUILDING, LOCATIONMAP
PREPARE0:
8Af.t.NGASCHY (BARANGAY HALL), VICINITY MAP
• BRGY. MALALAY, BALAYAN,BATANGAS TABLE OF CONTENTS VINC
DIMENSIONS :
ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE
INDICATED.

CONSTRUCTION OF (Name of Projectand Location)


CONTRACTOR
DATE STARTED
CONTRACT COMPLETION DATE
CONTRACT COST
IMPLEMENTING OFFICE

.r EDGE OF ROAD

GROUND LEVEL

«--------~, TRAFFIC DIRECTION

TRAINllllt
~ OADTOPROIRESS ROAD
1000

80'-~=20,___,__ 2~0<l0"'--------------------'
ORIENTATION
TYPICAL FRAME ELEVATION

DPWH STANDARD PROJECT BILLBOARD


I
CONSTRUCTION OF (Name of Project and Location)
CCWTR-'CIQ!
DAJESTARIB)
camtACT <Xll'lfllQj DATE
:
:
:
I DISPL AREA
camtACT COST :
CXWSTRUCTnlOONSU.TNfl : 50 x 75 HORIZONTAL
lll'WEM11«;(Jla
SClR:ESIJ'RNl
:
: 9 COCO LUMBER 00 x 2400 x 5
NOTES:
~~==~=
YWOOD)
• DEPARTllOOOf
AS PER DEPARTMENTORDER NO. 141 SERIES OF 2016
1. THE NEW BILLBOARD DESIGN LAYOUT AND DIMENSION ( SEE DRAWING )SHALL BE INSTALLED ON A --- IMJNI!! I I
STANDARD BILLBOARD MEASURING 1200mm. x 2400mm. (4ft. x 8ft.) USING 12mm. (1/2 inch) THICK MARINE I

PLYWOODOR TARPAULIN POSTED ON 5mm. (3/16 inch) MARINE PLYWOOD.


50 x 75 VERTICAL
2. FOR EACH BUILDING PROJECT, THE BILLBOARD SHALL BE INSTALLED IN FRONT OF THE PROJECT SITE. coco LUMBER~

• x 75 VERTICAL
SOCOCO •
LUMBER,,_.,,,_,_ , ___,.
3. FOR EACH ROAD/BRIDGE/FLOOD CONTROLPROJECT, TWO BILLBOARDS SHALL BE INSTALLED, I.E., ONE [
AT THE BEGINNING AND ONE AT THE END OF THE PROJECT.
4. FOR ROAD PROJECTS WITH LENGTH OF 10 KILOMETERS OR MORE, BILLBOARD(S) SHALL ALSO BE
INSTALLED AT EVERY5 KILOMETERS INTERVAL. 50x 50WOOD EN STAKE~ - SOx SO WOODEN STAKE l,....-;™+-------1:1-f---------t:1
GROUND LEVEL

~· '
GROUND LEVEL
5. NAME(S) AND/OR PICTURE(S) OF ANY PERSONAGES SHOULD NOT APPEAR IN THE BILLBOARD.
6. NO POLITICAL BILLBOARDS SHALL BE ALLOWED TO BE INSTALLED 100 METERS BEFORE AND 100 METERS *~»~ ~~~~~ D-~~~~~~
Y«'v«'v«~~~
AFTER ALL DPWH PROJECTS AND IN BETWEEN THE PROJECT LIMITS OR WITHIN THE ROAD ~~~~~~~ v~)»)»)»)»)» N §ll
RIGHT-OF-WAY.
i
7. DPWH CONTRACTORS SHALL NOT BE ALLOWED TO PLACE NAMES OF POLITICIANS ON THEIR EQUIPMENT
OR CARRY POLITICAL BILLBOARD ON THEIR EQUIPMENT.
2400

FRONT ELEVATION REAR ELEVATION

PROJECTUAME AtlO LOCATION: SHEET CONT£NT: SUBMITTED BY: RECOMMEflOING APPROVAL: APPROVED BY: Sf:T NO. SHEET NO.


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DPWH STANDARD PROJECT BILLBOARD
REGION IV·A CONSTRUCTION OF
BATANGASI DISTRICT ENGINEERING OfFlCE MULTI-PURPOSE BUILDING,
KUHUITAJIGILAYA.. a.t.TAJIGASOTY (BARANGAY HALL), FLORENCIA G. CORDOVA BENCIO A. AGUZAR JOEL F. LIMPENGCO
BRGY. MALALAY,BALAYAN,BATANGAS CHIEF, PLANNING &. OESJGtl SECTION ASSJSTAUT DISTRICT ENGltlEER DISTRICT EHGJNEER
l---~2...,000..,_ ,_, _....,,..__ ~------ 3500
.-------"'500 -------.--------"-'""---------
1025 1025 4200 ~ 1()0()

- -,-~~::r,)?m···gfj·
2i1fill··'»¢::·-B4·
. ... ,.,EJ,.·
""¥i:%E\l-·
·,23],.,. r-~14i_
~~~~·-1El$@~''."\~~(.gfj.\.::;;,ll~,. ~~T~:
I'
. ~:~~---~W#.~~:~r·m1-iJ _
: :
;-i.Eli=fE.·sfilJJ··, ·:.
t---+--+--lt--+--t---t-t--t---t--t--+--t---t-+t-..-ON t·····} .

,~;~~~~~~~~~-, ·:·:- -·

i J ..l. t ; i. . .•
1
i i !. t ; 1.J:l
1


1,(d
:::l ! i ' i i : EL=+3200mm. . ! ; ' ! : :

@--- " 11 :I·. L' .... !· ·•r+;T~i:


I I j j1 i: I I
. I t • f ROOF
,------------··r··-----------------------------------------------------------------------------------------,-----------------------r·--900
LINE ,
1

I I I

, I L.~ I I L.~ I

'-'----·L
1 i ·------------ ! JPROPERTYUNE l __ _j_J SECOND
SCALE
FLOOR
1 :40
PLAN
M.

Lvw____ SCHEDULE OF FLOOR FINISHES:


GROUND FLOOR PLAN
SCALE 1:40 M.
NAME/LOCATION DESCRIPTION

FF-1 400mm. X 400mm. CERAMIC UNGLAZED TILES

FF-2 300mm. X 300mm. CERAMIC UNGLAZED TILES

PROJECT NAMEANO LOCATION: SHEET CONTENT: mo· SUBMITTED BY RECOMMEflDIUG APPROVAL APPROVEDBY: SET NO. SHEET NO.
RfP,,.lK:Of llEPl"-'PPOh(S
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS GROUND FLOOR PLAN RHOMARB.MACAUNDONG

@ 6B
OFFICE OF THE DISTRICT ENGINEER CONSTRUCTION OF SECOND FLOOR Pl.AN ARCHITECTII
BATANGASI DISTRICT ENGINEERlNGOFFICE MULTI-PURPOSE BUILDING, SCHEDULE OF FLOOR FINISHES
PREPARED:
BATANOAS CHY (BARANGAY HALL}, FLORENCIA G. CORDOVA BENCIO A. AGUZAR JOEL F. LIMPENGCO

BRGY. MALALAY, BALAYAN, BATANGAS VINCE ENGIHEER II
....
CHIEF, PLArlflTNG & DESIGN SECTION ASSISTAUT DISTRICT EHGltlEER DISTRICT ENGINEER