You are on page 1of 1

5 4 3 2 1

TOP OF ROOF BEAM

328
S.F. CEILING ELEV. +9.65m

3072
3RD F.L. ELEV. +6.75m

300
2ND CEILING ELEV.

1" PIPE ROD

10650
3100
1 21" ROD RAILINGS
2ND F.L. ELEV. +3.65m
F.F CEILING ELEV.

3850
F.F.L. ELEV. +0.450m
N.G.L. ELEV. +0.000m

1 RIGHT ELEVATION VIEW

1 2 3 4 5
KEYSTONE PRECAST CONCRETE
HANDRAIL

KEYSTONE PRECAST CONCRETE


BALUSTERS

300 1803 545


TOP OF ROOF BEAM
S.F. CEILING ELEV. +9.65m

3100
3RD F.L. ELEV. +6.75m

300
2ND CEILING ELEV.

12998
3100
2ND F.L. ELEV. +3.65m

300
F.F CEILING ELEV.

2750
800
LONG VEHICLE LONG VEHICLE

N.G.L. ELEV. +0.000m

1 LEFT ELEVATION VIEW

Prepared By: PROJECT & LOCATION : RECOMMENDING APPROVAL: CONFORME: SHEET CONTENTS: SHEET NO.

A PROPOSED RIGHT ELEVATION VIEW


EARL VERGILLE P. REVELO 3-STOREY RESIDENTIAL/COMMERCIAL BUILDING ENGR. JOEL G. OPON EDGAR S. REVELO LEFT ELEVATION VIEW A-4
EVR
CONSTRUCTION AND SUPPLIES
CIVIL ENGINEER LOCATION: ALANO ST.,SAN JOSE, PAGADIAN CITY OWNER 4 75

You might also like