Professional Documents
Culture Documents
Steam conditions
Fuel Conditions
Tube materials
Page 2
Hemweg
Page 3
Hemweg
Holland
650MW
Page 4
Meri Pori
Meri-Pori
Finland
G
+70.750
SEPERATOR
VESSEL
560 MW
G
+59.500
OUTLET REHEATER
FINAL SUPERHEATER
Commissioned 1993
Load following yes OVER AIR
PORTS
FU
07.3 IDT
208 CE W
RN
A
H
LOW NOX
COAL BURNERS
ASH
CONVEYOR GAS RECIRCULATION
DUCT
Page 6
Changshu
China
Page 7
Changshu
China
+72425
+70695
PENTHOUSE ROOF
3 x 600 MWe
+69815
+69415
+68815
SEPERATOR
VESSEL
+66345
+63844
ROOF TUBES +63975
REHEATER
REHEATER
5300
+43859 +43720
ECONOMISER
+38280
AFTER AIR
+35750
ECONOMISER
+34560
+33388
+26037
+18351
AIRHEATER
LOW NOX
COAL BURNER
+13500
+9400
+5200
+0.0m (GRADE)
-1000
Page 8
Wangqu
China
Page 9
Wangqu Boiler For Low Volatile Coal
SEPARATOR
VESSEL
Once Through Supercritical Boiler.
(Operation 2006)
REHEATER
REHEATER
PLATEN
SUPERHEATER
Moisture % 7.96
Ash % 22.3
HOPPER KNUCKLE
% dmmf 12.15
Sulphur % 0.35
W ATER
IMPOUNDED
HOPPER
Nitrogen % daf 0.93
HHV kJ/kg 24600
Page 10
Wangqu Boiler -- A comparison of relative heights
+79280
240 ft
+67000
+65000
+52800
Page 11
Spiral Furnace Arrangement
Page 12
Doosan Babcock Supercritical Boilers
Evaporation complete
Vertical tubes where in furnace tubes
heat flux is lower
Welded strap to
support tubes
Transition mixing
header
Pressure balancing
ring
Spiral furnace tubes
Zone of highest
Burner region heat flux
Individual Connections
to each spiral tube
Page 15
Doosan Babcock Supercritical Boilers
Buckstay
and Link
System
Inclined blocks attached
to the tube membrane
provide attachment
points and a thermal
path between fluid and
each pair of straps
ensuring acceptable
temperature differentials
Page 16
Horizontal Wall Firing
COMBUSTION AIR
Burnout
Zone
Furnace Configuration
Page 17
Spiral or Vertical Furnace ?
Property Spiral Furnace Design Universal Pressure Japanese Style High True low Mass Flux
High Mass Flux Design Mass Flux Design Design
Page 18
Features of Doosan Babcock Spiral Furnace Boilers
Page 19
Doosan Babcock Supercritical Boilers
Supercritical Fabrication
Page 21
Once Through Boiler Technology
Furnace Primar
Upper furnace
Reheate
Separator **
Roof and rear cage Reheate
Reheate
Horizontal S/H
Eco
Platen S/H
Final S/H
**Optimum position in
circuit varies
Page 22
Recirculation Start-Up System
recirculation is required Re he a te
Page 23
Recirculation Start-Up System
economizer Re he a te
Re he a te
• Above Benson load the recirculating pump is Re he a te
dry
Page 24
Typical Circulation Pump
• Type of high pressure low head pump needed for spiral furnace
Section of circulating pump circulation.
• Pump is suspended directly from the suction piping.
• The pump requires cooling water supply to protect the motor
windings.
Page 25
Typical Separator Vessel
Page 26
Comparison of Damper Positions
Vertical
Spindle
Horizontal
Spindle
Other OEM
Page 27
Damper Arrangement View
HOPPER
SECTION 'A-A'
SECTION 'A-A'
DIVISION PLATE
B
ECONOMISER
CASING
SUPERHEATER PASS
A A REHEATER PASS
REHEATER
OUTLET
BIASING SUPERHEATER
DAMPER OUTLET
REHEATER
OUTLET
ISOMETRIC VIEW
HOPPERS SUPERHEATER
B OUTLET
PLAN
REHEATER
OUTLET
Page 28
Typical Arrangement of Stub Pipes & Headers
Steam Manifolds
Plan
Stub Headers
Heating Surface
Page 29
Followed Arrangement of Stub Pipes & Headers
DB Other
Manufacturer
Page 31
Spiral Furnace Construction
Page 32
Spiral transition to vertical
Page 33
Control Aspects
Page 34
Typical Modified Sliding Pressure Line
3500
3000
2500
Press psig
2000
1500
1000
500
0
0 10 20 30 40 50 60 70 80 90 100
Load %
Page 35
Control and Steam Temperature Matching:
• Position of separator
in system is selected
to bring enthalpy at
minimum Benson
load close to
saturation.
• This enables a close
match of
superheater steam
temperature to
turbine parts for
starting and on shut
down.
• For cold starting
cooler warming
steam is available.
Page 36
Start-up System Description
To Superheaters
Storage vessel
Economizer
To drains vessel
Circulation pump
Feed Pump
Page 37
Start-up System Instrumentation
PT
LT
FT
7610
Large overflow
Small 7160 6960 valve
overflow valve
6285
6000
Circulation valve
control range
2350 2500
Pump permissive
Page 39
Typical Spiral Furnace OTSC Boiler Design
Page 40
Boiler Design Solution -1
MAIN STEAM REHEATER
MANIFOLD MANIFOLD
FINAL
18'-10 3/8" 21'-10 5/8"
REHEATER
• Ease of construction
SUPERHEATER
PRIMARY
SUPERHEATER
PLATEN
SUPERHEATER
• Minimize interfaces to provide manageable
schedule
THERMO-PROBE
ECONOMIZER
• Intergraph Drawing system to aid Designer,
Constructor, and Operator
ECONOMIZER
• Engineering phase includes electronic
transfer of drawings / documents
E W IDT H
" FU RN AC
86'-4 1/2
27'-4 1/4"
S.C.C.
Page 41
Boiler Design Solution -2
MAIN STEAM REHEATER
MANIFOLD MANIFOLD
REHEATER
OUTLET LOOP
FINAL
SUPERHEATER
18'-10 3/8" 21'-10 5/8"
PLATEN
SUPERHEATER
control
THERMO-PROBE
S.C.C.
Page 42
Boiler Design Solution - 3
+277'-6" TOS
SEPERATOR
VESSEL
+230'-0" RO OF TUBES
AM M ONIA Nox REDUCTION
INJECTION G RID (SCR UNIT)
M OBILE TRIPPER
LO CATION
PA FAN
SUCTION
DUCT
RAW COAL
SILO
RO TARY
TRI-SECTOR
G AS AIRHEATER
CO AL FEEDER
+55'-0" TOF
ACCESS AND
HANDLING ZONE
FO R CO AL MILLS
HO T PRIM ARY
AIR DUCTIM G FO RCE D DRAUGHT
TO CO AL M ILLS FAN (FD)
Page 43
Boiler Design Solution - 4
STAIR &
HOIST WELL
12'
33'-4"
32'
46'
33'-4"
PA FAN
DISCHARGE
DUCT
60'
TEMPERING AIR
CROSS-OVER
DUCT
33'-4"
8'
200'
C.L. BOILER
8'
FD FAN
COAL MILL
CROSS-OVER
(6 OFF)
DUCT
33'-4"
PRIMARY AIR
FAN (PA)
TEMPERING AIR
DUCTING TO STEAM
COAL MILLS AIRHEATER
60'
C.L. FURNACE
33'-4"
GAS AIRHEATER
OUTLET DUCT
46'
33'-4"
32'
SCC OUTLET
CHUTE TO
CRUSHER
12'
STAIR &
FREIGHT
ELEVATOR
321'
Page 44
Boiler Design Solution - 5
HOT SECONDARY AIR HOT PRIMARY HOT SECONDARY
AIR DUCTING FD FAN
DUCTING CONNECTIONS AIR DUCTING SUCTION DUCT
TO BURNER W INDBOXES TO COAL MILLS
STAIR &
HOIST W ELL
12'
33'-4"
32'
46'
BURNER
W INDBOX
(6 OFF)
ROTARY
TRI-SECTOR
GAS AIRHEATER
33'-4"
60'
33'-4"
RAW COAL
C.L. FURNACE
FEEDERS
(6 OFF)
8'
C.L. BOILER
200'
8'
33'-4"
PA FAN
16'-0 1/4" SUCTION DUCT
60'
CRO SS-OVER DUCT
33'-4"
G AS AIRHEATER
INLET DUCT
46'
33'-4"
32'
12'
STAIR &
FREIGHT
ELEVATOR
24' 12'
321'
Page 45
Development of Thermal Efficiency in
Coal Fired Power Plants
55
Cycle Thermal Efficiency (%NCV)
40
RECENT
CASTLE PEAK
DRAX CHINESE PLANTS
35 RATCLIFFE
FERRYBRIDGE
30
1960 1970 1980 1990 2000 2010 2020
Year
Natural Circulation
Supercritical
0%
Traditional Natural
% Reduction in CO2 emissions
Circulation Boiler
-10%
HEMWEG
Advanced
MBEL Supercritical
BAT
-20% Boilers
COST
522
TARGET
-30%
THERMIE 700
TARGET
Page 47
Doosan Babcock
Advanced Supercritical Benefits
Efficiency
% LHV, net
45 • Best available supercritical technology is 300 bar,
600/620oC (4350psi,1110oF,1150 oF)
44
• Comparing new plant efficiencies (with FGD)
43 • 10% fuel saving
– 10% emissions saving
42
• Vertical Tube Furnace offers optimum solution
41
40
39
38
Sub-crit 600 C
Single reheat Supercrit
Inland site
Bituminous coal Page 48
Tube materials
FINAL SUPERHEATER
OUTLET MANIFOLD
REHEATER OUTLET
MANIFOLD
Final RH outlet Leg & Stub
+76325 TOS
Header Austenitic
Final RH Centre Loop T91
+72015 PENTHOUSE ROOF
FINAL SUPERHEATER
Primary SH Outlet Leg & Manifold T91
REHEATER
+34200 TOS
Economiser A210C
Ribbed Tubes T23 +25855 BURNERS
+15350 TOS
extensive references at similar
temperatures and conditions
Plain Tubes T12 +5457
SCRAPER CHAIN
CONVEYOR (SCC)
Page 49
Furnace Cleanliness
Page 50