Professional Documents
Culture Documents
TEKNIK INDUSTRI
INDUSTRIAL ENGINEERING
..is concerned with the design, improvement, and
installation of integrated systems of men,
materials, information, energy, and equipments. It
draws upon specialized knowledge and skill in the
mathematical, physical and social sciences together
with the principles and methods of engineering
analysis and design to specify, predict and evaluate
the result to be obtained from such systems
Knowledge & Skill
Physical Sciences
Mathematical
Industrial
Engineering
Engineering
Specify
Social Sciences
Predict
Evaluate
Optimal
Result
Design
Integrated
Systems
Improvement Installation
SYSTEM – SUBSYSTEM –
SUPERSYSTEM
Integrated
SYSTEM
Transportation Unnecessary
Inappropriate Motion
processing Waiting
Excess Over-
Inventory production
Defect
Layout
Distance Ergonomic
Time Method
Material handling Unbalance Movement
Stock level Setup
Lot size Forecasting Search
Replenishment Nonconforming Warming
Buffer size Cycle time Planning Inspection
Turnover Reject Downtime
Crashed Speed Scheduling Counting
Warehousing Rework Idle
Lead time Batch size
Storage space Downgrade Delay
Workload Shop floor control
Degradation Guarantee Waiting
Supervision Unsold
Inefficiency Mistake
Error
CHANGE & AGILE
CHANGE & AGILE
12
GREEN & SUSTAINABLE
DAYA DUKUNG
LINGKUNGAN
HIDUP
ENVIRONMENTAL
CARRYING CAPACITY
DAYA TAMPUNG
LINGKUNGAN
HIDUP
GREEN & SUSTAINABLE
Recovery
Recycling
Reuse Energy
Competitive Intracompany
Strategy Interfunctional
maximize company profit
Product Dev.
Strategy Intercompany Intracompany
Interfunctional Intrafunctional
maximize SC surplus minimize functional cost
Supply Chain
Strategy
Marketing Intracompany
Strategy Intraoperation
minimize local cost
KOLABORASI INDUSTRIAL
LINGKUNGAN PERUSAHAAN
LINGKUNGAN MIKRO DAN MAKRO
MICRO
Environment
MACRO
Environment
LINGKUP TEKNIK INDUSTRI BERDASARKAN
SKALA SISTEM
Island
Integrated
Point
Extended
LINGKUP TEKNIK INDUSTRI BERDASARKAN
SKALA SISTEM
Man- Strategic
Work Supply
Machine Business Enterprise
Center Chain
System Unit
LINGKUP TEKNIK INDUSTRI BERDASARKAN
BUSINESS PLAN
Work
Demand
Breakdown Ergonomic
Forecasting
System
Differentiation
Voice of Work Make or Division Capacity Organization
/ Product
Customer Studi Buy Analysis of Work Planning Development
Variants
ENTERPRISE
PRODUCT PROCESS FACILITY WORK STATION LAYOUT PRODUCTION
BUSINESS
DESIGN PLANNING PLANNING DESIGN DESIGN PLANNING
PLAN