Learning Objective:
How to use GIS Software (ArcGIS) and its basic tools to perform the basic GIS functions and
generate a desired output.
Application of GIS on DRM
Data Source:
Administrative boundaries : Admin.shp
Building footprint layer : Building.shp
Police force layer : Poloce_station.shp
River layer : River.shp
Road layer : Road.shp
There are 4796 buildings in the Smart City classify into 3 categories based on the size of the
building as define as:
There was a big flood event in year 2015 and the lots of damage were occurred. Finally, the
government came up with the flood inundation risk zone. It divided into two risk zones (high and
low zone) ‐ High risk zone of the flood inundated 150 meter from the center line of the river ‐
Low risk zone of the flood inundated 300 meter from the center line of the river.
1. What is the total length of the road which exposed into the high flood inundation zone?
…………………………6228.505456m…………………………………………….
2. How many Building Density and population density in each admin boundary?
3. How many buildings exposed to the flood inundated in high zone and Admin 1?
………732 buildings……………………………………………………………….
4. How many buildings exposed to the flood inundated in low zone and Admin 3?
……………499 buildings………………………………………………………….
7. If the government needs to relocate all building in high risk of flood zone, how much the
government has to allocate budget (in USD) for relocate those building?
………………………9,655,000……………………………………………….
8. Please find the suitable area to construct the new government complex by using the follow
condition
‐ The complex must close to the main road (not more than 100 meter)
‐ The complex must close to the Police Station (not more than 150 meter)
‐ The complex must not locate in flood inundated area (10 m away from flood inundated
area)
9. Make a final layout for your answer.