You are on page 1of 1

NOtes:

For the execution:

-Of worksAll positions must be performed in


accordance with technical rules
-Gutter outlet should be placed completely in
certain positions
-water must be collected at the intended location
-Before starting the works, the levels should be verified

Gutter

Owner:

Project:

Gutter

Site: Project No.:

Drawing name:

Drawing NO.:

Drawing Type: Revision No.:

00

Date: Scale:

Revision No Date Approval

Gutter

AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. 1215/LIBYA
Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com

You might also like