STEEL :
Section 1-1 Design according ( EC 3 (EN 1993-1-1:2005)) Code.
Before starting execution drawings should be compared
and any different should be checked direct with
consulting engineer.
All dimensions are in milimeters.
Materials list :
Basic Steel material: S235
Steel material for pipe RHS S235JR, for plate
S235JRG2.
Welding electrodes for connections two pipe
elements. Inside wall cover =2.5 cm
36.69
600.00 600.00 consulting engineer.
36.69
UPN140 UPN140 UPN140 UPN140
102.16
Foundation was designed to carry basement, ground
and first floor.
180.00
UPN200
180.00
Bearing capacity 250KN/m3
71.84
IPE 200
UPN140
UPN140 UPN140 UPN140 IPE 200 UPN140 UPN140
Materials list :
Steel strength should not be less than 3500 kg/cm²
HE340A
for diameters 12-14 mm.
560.00
HE340A
Steel strength should not be less than 2500 kg/cm²
180.00
180.00
180.00
IPE 200 for diameters 10 - 8 mm.
Steel strength should not be less than 1800 kg/cm²
UPN140 UPN140 UPN140 UPN140 UPN140 for diameters 6 mm.
Compressive strength for concrete should not be
less than 250 kg/cm² at 28 days .
150.00
150.00
Plain concrete strength should not be less than 200
150.00
Ground kg/cm² at 28 days .
0.00 UPN140 UPN140 UPN140 UPN140 UPN140 Concrete cover to main reinforcement :
B.O.J B.O.J
Foundation Concrete cover = 5 cm.
49.24
41.24
38.24
40.00
B.O.G 40.00
B.O.G
Ground Columns & beams concrete cover = 2.5 cm.
5.00 5.00
0.00 Slabs cover = 2.5 cm.
60.00 80.00
B.O.H B.O.H
60.00 80.00
80.00
Outside wall cover = 4 cm. next beam span.
108.00
-40.00 -40.00
143.00
For continuous beam steel should be bent at
60.00
B.O.F B.O.F span and continuo to
-140.00 -140.00
Upper reinforcement in cantilever rib or beam should
be extend one and half its length inside next span .
Distance between steel bars should not be less than 2.5
310.00 320.00 150.00 400.00 150.00 400.00 150.00 320.00 310.00
cm and in other cases steel bars should be in
two layers.
550.00 550.00 550.00 550.00 Connection between two bars should not be less
than 50 Ø.
A B C D 9
Owner:
Alwasead CO.
Project:
WOOD FACTORY
Section 2-2 MANIFACTURING LINE
183.00
183.09
183.09
183.00
183.00
Drawing name:
183.00
163.00
02 Second 163.00 02 Second
01 First 01 First
620.00
600.00
620.00
600.00 Section 1-1 & 2-2
36.69
36.69
Drawing NO.:
180.00
180.00
WD-018-00-00-AR-005-00
600.00
600.00
180.00
180.00
Drawing Type: Revision No:
Structuralctural Drawing 00
B.O.G
150.00
150.00
5.00 Date: Scale:
B.O.J B.O.J
08/02/2021 1:100
43.24
43.24
40.00
Ground 3 40.00
B.O.G
Ground
3.00
3.00
S.5 5.00
0.00 B.O.H 0.00
B.O.H
80.00
80.00
80.00
110.00
140.00
-40.00 -40.00
140.00
140.00
Revision
No Date Approval
60.00
60.00
60.00
40.00
B.O.F B.O.F
-140.00 60.00 60.00 -140.00
2200.00
A B C D 9
AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. BENGHAZI/LIBYA
PROJECT NO: NO.BN.FC.02 Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com