-Permanent ventilation (pv) to be provided over all openings
except bathroom doors.
01 02 03 04 05 06 07 08 -all manhole covers in the drive and parking to be provided with
heavy duty and air tight covers.
43,550 -all drain pipes under building,parking and driveway to be encased
5,100 6,500 7,400 6,700 14,450 3,400 into 150mm thick concrete.
200 43,950 200 -all rc works to structural engineer's detail.
-Electrical works to be done by a qualified technician and
200 5,500 200 6,300 200 5,150 8,000 5,700 7,300 5,600 200 to be done in accordance with KPLCo. regulations
A A -Mechanical work to MoH and Local Authority's regulations
200
200
200
200
and specifications.
10.00 % 10.00 % 10.00 % Ramp 10.00 % 10.00 % -Water meter to be 300mm minimum above ground level.
3,200
3,200
-Provide DPC under all walls at ground floor level.
3,000
-Provide 1000 gauge polythene DPM under ground floor
10.00 % 10.00 % 10.00 % 10.00 % 10.00 % conc floor slab
B B
200
1,800 200
FIRE NOTES ( Applicable in office,ware houses and godowns)
200
400 200 150 600 200 150 150 600
3,400
3,400
200 900 900 150 2,800 200 2,600 200 3,500 200 2,100 200 2,100 200 1,800 200 1,200 1,450 150 2,800 200
1] Provide 4,500 Litres of water with booster pump.
2] Provide 30metres long horse reel on each floor
200
Cyclotron
4,325
machine 3] Provide 1x9 Litres water CO2 Fire Extinguisher at
200
200
400
Room
200
20
19
18
17
16
15
14
13
12
200
900
175
Power Supply 5] Provide emergency lighting with independent power systems
3,549
6,000
150
Cyclotron
200
Ladies Room/Data center
400
Room
200
11
1,700 150 600 150 1,700
Cleaners
21
10
AREAS
1,000
22
store
4,600
4,400
4,600
9
5,950
23
200
8
24
Cyclotron
3,275
Lift
300
GENTS
7
Control
25
26 6
5
Room
1,600
27
1,450
400 4
600 200 500 500
1,200
28
200 200 3,600 150 1,150 200 2,725 200 1,900 200 3,575
3
200 2,700 200 2,000 200 2,800 150 150 2,800 200 1,500 150 1,900 1,500 1,000 1,000 1,500 6,001 400 1,500 200
200
200
200
29
30 2
200
D D
31 1
150
200
200
150
1,375
1,400
1,400
1,450
fire hydrant 200 5,800 200 5,200 200 1,250 200 3,100 200
Gases Storage
Kitchenette
1,650 150
2,400
200
200
1,650
Gents airlock
3,900
200
200
description
900
prefix date
1,500
2,000 200
6,400
6,400
29,000
29,000
200
200
200
200
200
2
VIP/ QC Lab 31
29,925
4,450
3
Inpatient 4 30
31,025
29
Entry
5
1,300
3,475
3,475
6 28
27
200
7
600 200 26
4,850
9 25
24
02
10
Lead Containers
2,500
23
E E
11
6,000
22
washing room
2,025 200
12
04
200
200
200
Security 13 21
20
Gowning
14
19
200
15
Reception room200 18
200
16
2,875
17
3,000
Bed Lift
200
Production Finished
Office
200
2,650
Exit
Product
6,800
6,800
out
200
200
2,550
6,575
200
Monitoring
Waiting 200 Raw materials
Waiting Lounge PROJECT:
inspection &
3,500
3,400
200
quarantine
2,650
F F
1,900 200
200
200
200
200
10,325
Materials CLIENT:
Entry Porch
4,600
4,600
Entry
1,600
Hot Lab 03
4,825
NAIROBI
G G DRAWING TITLE:
100
ARCHITECT:
400
400
ARCH.M.MWANGI
200 2,590 600 16,900 2,700 200 600 4,300 200 2,400 200 3,237 3,513 2,000 400
KENYATTA UNIVERSITY
200 39,440 400 ARCHITECT
DRAWN: GATIMU K.
01 02 03 04 05 06 07 08
SCALE:
01
X
AS SHOWN
CHECKED:
FEB 2020
ARCH.M.MWANGI
KU/ARCH/V0L 1/