You are on page 1of 1

NOtes:

For the execution:

-Of worksAll positions must be performed in


E-20
accordance with technical rules

S-27
S-24

2
ac_bottomlevel
-Gutter outlet should be placed completely
in certain positions
-water must be collected at the intended
%
location
3%
9.6 9.63

7.
22
%

2%
5.2
R4.000

R2.000

Owner:

Alwasead CO.

Project:
R11.000

1215 (47)
R4.200

8.000
Site: Project No.:

R12.000
R4.000

Drawing name:

Drawing NO.:

Drawing Type: Revision No.:

00

Date: Scale:

Revision No Date Approval


R6.000
R6.000

2.000
19.000

AL WASEAD AL AQARIYA
ALNAJMA BUILDING - AIRPORT ST. 1215/LIBYA
14.300

Mob: +218 91 640 64 64 EMAIL: Info @alwasead.com


8.000
2.000

2.000

00
00

You might also like