PROJECT:EXPANSION FOR EXHIBITION CENTRE

DESIGN REPORT –MECHANICAL WORKS

THE EXPANSION PROJECT FOR EXHIBITION CENTRE

DESIGN REPORT ON MECHANICAL WORKS


(ACMV)

Page 1
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

TABLE OF CONTENTS

1.0 INTRODUCTION ................................................................................................................................................ 3


1.1 PROJECT DESCRIPTION ............................................................................................................................. 3
1.2 SCOPE ........................................................................................................................................................... 3

2.0 SITE PLAN ......................................................................................................................................................... 4

3.0 AIR CONDITIONING AND MECHANICAL VENTILATION SYSTEM ............................................................ 4


3.1.0 INTRODUCTION ........................................................................................ Error! Bookmark not defined.
3.2.0 ACMV WORKS ............................................................................................................................................ 4
3.2.1 BASIS OF DESIGN ................................................................................................................................. 4
3.2.2 OUTDOOR CONDITIONS....................................................................................................................... 4
3.2.3 INDOOR DESIGN CONDITIONS ............................................................................................................ 4
3.2.4 NOISE LEVEL DESIGN CRITERIA ........................................................................................................ 4
3.2.5 AC MAKE UP AIR & FILTRATION .......................................................................................................... 5
3.3.0 VENTILATION STANDARDS ...................................................................................................................... 6
3.3.1TOILET EXHASUT SYSTEM ................................................................................................................... 6
3.3.2 KITCHEN EXHAUST SYSTEM ............................................................................................................... 6
3.3.3 PRESSURISATION SYSTEM ................................................................................................................. 6
3.4.0 DESIGN PARAMETERS ............................................................................................................................. 6
3.4.1 AIR COOLED CHILLER MACHINE ....................................................................................................... 6
3.4.2 AIR HANDLING UNIT MACHINE: ........................................................................................................... 6
3.4.3 VENTILATION FAN ................................................................................................................................. 7
3.4.4 PIPES ...................................................................................................................................................... 7
3.4.5 DUCTING ................................................................................................................................................ 7
3.4.6 “U” VALUE CONSIDERATIONS ............................................................................................................. 7
3.5.0 CODES & STANDARDS ............................................................................................................................. 8
3.5.1 AIR CONDITIONING EQUIPEMENT ...................................................................................................... 8
3.5.2 NOISE & VIBRATION.............................................................................................................................. 8
3.5.3 PIPE & FITTINGS .................................................................................................................................... 9
3.5.4 REFREGERANT GAS & LUBRICANTS ................................................................................................. 9
3.5.5 SHEET METAL WORKS ......................................................................................................................... 9
3.5.6 THERMAL INSULATION ....................................................................................................................... 10
3.5.7 INTERNATIONAL STANDARDS .......................................................................................................... 10
3.6.0 HEAT LOAD SUMMARY ........................................................................................................................... 11
3.7.0 PROPOSED AIR CONDITION CONFIGURATION .................................................................................. 11

Page 2
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

1.0 INTRODUCTION

EXPANSION PROJECT EXHIBITION CENTRE

1.1 PROJECT DESCRIPTION


EXHIBITION CENTRE is having a GF & Terrace Floor with one mezzanine floor between
ground & Terrace floor.

Multilevel car park having GF + 7F & Terrace Floor, structure and other ancillary units with
necessary infrastructures.

1.2 SCOPE
The scope of this report covers the following aspects:

 Air Condition and Mechanical Ventilation System

Page 3
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

2.0 SITE PLAN

3.0 AIR CONDITIONING AND MECHANICAL VENTILATION SYSTEM


3.1.0 INTRODUCTION
The proposed building, main entrance face towards North.

3.2.0 ACMV WORKS


3.2.1 BASIS OF DESIGN
Site Location : Chennai

Geographic Location : 13.04 Deg Latitude

Altitude : 16 Mtrs

3.2.2 OUTDOOR CONDITIONS


The outdoor design conditions for various season have been considered as follows:

Summer : 104 F DB 82 F WB 40%RH

Monsoon : 83 F DB 80 F WB 88%RH

Winter : 65 F DB 57 F WB 60%RH

3.2.3 INDOOR DESIGN CONDITIONS


Indoor design conditions for Air-Conditioning shall be as follows:

DB: 23 ± 1.1°C (73.4 ± 2 °F)

RH: Not exceeding 60%

Indoor air temperature and humidity listed in the design basis will confirm to ASHRAE comfort
recommendations in 2007 ASHRAE Hand book – Fundamentals and ASHRAE Standard 55.

3.2.4 NOISE LEVEL DESIGN CRITERIA


Sound and vibration control is required for both equipment and duct system, as well as in the
selection of diffusers and grilles. The design of the air conditioning system shall be as under
as per recommendation in 1997 ISHRAE Hand book – Section 8 - Noise & vibration Table 8:-

Page 4
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

Exhibition Halls : NC 35 to 40

Public Circulation Corridors : NC 40 to 45

Meeting Rooms & Business centre : NC 25 to 30

3.2.5 AC MAKE UP AIR & FILTRATION


The fresh air quantity considered for various air conditioned areas is as under:-

The world focus has shifted from the Environment to Invironment. This is new terminology,
being used increasingly to focus on the Indoor Air Quality. The indoor air quality goes top list of
concerns. The indoor environment is receiving increased attention, as more information has become
available on the presence and effect of indoor contaminants.

All other areas - As per ASHRAE 62.1- 2010, Table 6-1

Exhibition Halls - 0.06 Cfm / Sqft + 7.5 Cfm / Person

Restaurant - 0.18 Cfm / Sqft + 7.5 Cfm / Person

Office Area - 0.06 Cfm / Sqft + 5 Cfm / Person

Pre function - 0.06 Cfm / Sqft + 7.5 Cfm / Person

AHU FILTER TABLE:

SYSTEM
SI NO AREAS PRE FILTERS BAG FILTERS
DESIGNATOR

EXHIBITION
1
HALLS 75% to 85% 80% to 85%
arrestance 25% dust spot, bag
COMMON to 40% dust cartridge or
2 C1
CORRIDORS spot. Extended electronic
3 LIFT LOBBYS surface cartridge (semi automatic
or bag cleaning)
4 FOOD COURT

Minimum Efficient reporting Value – MERV 13, European Version EU7.

Page 5
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

3.3.0 VENTILATION STANDARDS


3.3.1TOILET EXHASUT SYSTEM
At every floor level air will be exhausted. Air Qty is based on volume with 20 air changes /
hour.

Even though NBC Table 5 Recommended Rate of Air Circulation For Different Areas –
Clause 6.5.1 Toilets 6-10 ACPH, with our past experience we recommend 20 ACPH for Toilet
exhaust system, since the building is densely occupied.

3.3.2 KITCHEN EXHAUST SYSTEM


we have considered 45 ACPH for kitchen ventilation, planned separate fresh air and exhaust
air ventilation, this will be inline & match the requirement for the effective Kitchen ventilation
system.

3.3.3 PRESSURISATION SYSTEM


Pressurization method has been adopted to protect the escape routes (Staircases & lift
shafts) from the ingress of smoke.

Single stage pressurization is proposed for this project which will operate in case of
emergency only.

3.4.0 DESIGN PARAMETERS


3.4.1 AIR COOLED CHILLER MACHINE
Performance rating of the chilling machine shall be based on the following design parameters:

Temperature of chilled entering chiller Direct Mode : (+6 deg C)


Temperature of chilled leaving chiller Direct Mode : (+13 deg C)
Fouling factor for chiller in FPS unit : 0.0001
Refrigerant : R134a
KW/TR (Air Cooled Chiller ) : 1.25KW/TR
3.4.2 AIR HANDLING UNIT MACHINE:
Design parameter for selection of Air Handling Unit and its components shall be:

Maximum face velocity across pre-filters : 350 FPM

Page 6
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

Maximum face velocity across cooling coils : 500 FPM

Maximum fan speed for Centrifugal Fan : 1000 RPM

3.4.3 VENTILATION FAN


For Axial fan above 300mm dia : 900 FPM

For Axial fan up to and including 300mm dia : 1440 FPM

For Centrifugal fan above 300mm dia : 900 FPM

For Centrifugal fan up to and including 300mm dia : 1440 FPM

3.4.4 PIPES
Piping shall be sized for the following design parameters:

Maximum velocity for NB 50 & above : 7 FPS

Maximum velocity for NB < 50 : 3.95 FPS

Maximum friction : 3FT of Water

PER 100FT

3.4.5 DUCTING
Design parameter for duct design shall be:

Maximum flow velocity for Supply Air : 1500 FPM

Maximum flow velocity for Return Air : 800 FPM

Maximum friction for Supply Air : 0.1 Inch of water

Per 100 ft of duct

Maximum friction for Return Air : 0.08 Inch of water

Per 100 ft of duct

Maximum velocity at supply air outlet : 500 FPM

3.4.6 “U” VALUE CONSIDERATIONS


a. Double Pane glass with coating : 0.41 BTU / Hr.sqft.deg.F.

b. Occupancy : 12 Sqft / Person - Halls

Page 7
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

c. Lighting

Lighting : 2.5 W / Sqft for halls

d. Wall ‘U’ value – External : 0.36 BTU / Hr.sqft.deg.F.

e. Wall ‘U’ value – Partition : 0.30 BTU / Hr.sqft.deg.F.

f. Roof ‘U’ value .with insulation : 0.53 BTU / Hr.sqft.deg.F.

g. Floor ‘U’ value : 0.26 BTU / Hr.sqft.deg.F

h. Ceiling ‘U’ value : 0.26 BTU / Hr.sqft.deg.F

3.5.0 CODES & STANDARDS


3.5.1 AIR CONDITIONING EQUIPEMENT
IS 659 Safety Code for air conditioning.

IS 660 Safety Code for mechanical refrigeration.

IS 3615 Glossary of terms used in refrigeration & air conditioning.

IS 5111 Testing of refrigeration compressors.

IS 7896 Data for outside design conditions for air conditioning.

IS 10617 Hermetic Compressors (Part-I, II & III).

IS 11338 Thermostats for use in refrigeration, air conditioners etc.,

SP 7 National Building Code (Group 4).

IS 3615 Glossary of terms used in refrigeration and air conditioning.

IS 7896 Data for outside design conditions for air conditioning for

Summer months.

3.5.2 NOISE & VIBRATION


IS 2264 Preferred frequencies for acoustical measurements.

IS 3483 Code of practice for noise reduction.

IS 3932 Sound level meter for general purpose use.

Page 8
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

IS 9736 Glossary of terms applicable to acoustics in buildings.

IS 9901 Measurement of sound insulation in buildings &

Building elements.

IS 9876 Guide to the measurement of air borne acoustical noise &


evaluation of its effects on man.

IS 10423 Personal sound exposure meter.

IS 11446 Measurement of air borne noise emitted by compressors units


intended for outdoor use.

IS 12710 Glossary of terms used in acoustic emission testing

IS 4758 Methods of measurement of noise emitted by machines

IS 14280 Mechanical vibration – balancing – shaft and fitment key


convention.

IS 12065 Permissible limits of noise level for rotating electrical machines.

3.5.3 PIPE & FITTINGS


IS 778 Copper alloy gate, globe & check valves for water works
purposes.

IS 4854 Glossary of terms for valves and their parts.

IS 5312 Swing check type non return valves.

IS 8092 Code for inspection of surface quality of steel castings for valves,
fittings & other piping components.

IS 12969 Method of test for quality characteristic of valves.

IS 13095 Butterfly valves for general purposes.

3.5.4 REFREGERANT GAS & LUBRICANTS


IS 1447 Method of sampling and test for lubricants.

IS 4578 Lubricating oils for refrigeration machinery.

IS 10609 Refrigerants – Number – Designation.

3.5.5 SHEET METAL WORKS


IS 277 Galvanized Steel sheet.

Page 9
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

IS 513 Cold rolled low carbon steel sheets.

3.5.6 THERMAL INSULATION


IS 334 Glossary of terms relating to bitumen & tar.

IS 3069 Glossary of terms, symbols & units relating to thermal

insulation materials.

IS 3144 Mineral wool thermal insulation – Methods of tests.

IS 3346 Method of determination of thermal conductivity of thermal


insulation materials.

IS 4671 Expanded polystyrene for thermal insulation purposes.

3.5.7 INTERNATIONAL STANDARDS


SMACNA HVAC Systems – Duct Design.

SMACNA HVAC Air duct leakage test manual.

SMACNA HVAC duct construction standards – Metal & flexible.

SMACNA Rectangular duct construction.

SMACNA Round duct construction.

SMACNA Energy conservation guidelines.

SMACNA Energy recovery equipment and systems, air to air.

ANSI-UL-555-1985 Fire dampers.

ANSI Scheme for identification of piping system.

SMACNA HVAC Systems – Testing, adjusting & balancing.

CTI Acceptance test code for water cooling towers, mechanical draft,
natural draft, fan assistant type evaluation of results and thermal
testing of wet and dry cooling towers as per CTI-ATC-105-1990

CTI Code of measurement of sound from cooling towers as per


CTI-ATC-128

ANSI / AMCA Laboratory methods for testing fans for rating as


per ANSI / AMCA 210

UL Fire dampers as per ANSI-UL-555

Page 10
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

ASME Scheme for identification of piping system as per

ANSI / ASME A-13.1

ASHRAE Methods of testing liquid chilling packages.

SMACNA Energy conservation guidelines.

SMACNA Energy recovery equipment and systems, air to air.

ASHRAE Practices for measurement, testing & balancing of building,


heating, ventilation & air conditioning system.

ASHRAE Commissioning of HVAC Systems.

ASHRAE Methods of testing liquid chilling packages as per ASHRAE 30


Latest Standard.

ARI Rotary Screw Chilling Package ARI 560 Latest.

ASHRAE 62.1 2010 Fresh Air Requirements.

3.6.0 HEAT LOAD SUMMARY


Refer Annexure - 1 Heat load summary

3.7.0 PROPOSED AIR CONDITION CONFIGURATION


Based on the above design parameters & heat load details, peak load is 2727 TR applying
diversity factor 75% the peak load will be 2045 TR.

Page 11
PROJECT:EXPANSION FOR EXHIBITION CENTRE
DESIGN REPORT –MECHANICAL WORKS

341 TR AIR COOLED CHIILERS x 6 NOS = 2045 TR

Air Cooled Chillers will be ideal solution for the project.

The following key points are self explicatory for the above selection.

 Less Maintenance compare to other two options.

 Foot print area is less.

 Necessity of water is avoided.

Page 12