1A. Calculate the number of drill holes required for the following volume and drill
pattern:
Volume: 50,000 bcm
Pattern: Spacing S = 7.0 m
Burden B = 5.0 m
Bench height H = 10.0m
Sub drill SD = 1.5m
Page 1
/conversion/tmp/activity_task_scratch/564001578.doc
Top View
50 m
10 m
Left View
10 m
-------------------------------------------------------------------------------------------------------
5. How many operators you need to employ for each working day to operate a fleet
of 20 dump trucks on 3 shifts a day?
What is the total number of operators you need to employ if each operator can
only work 13 days for each fortnight (2 weeks) and has 2 weeks per year annual
leave?
------------------------------------------------------------------------------------------------------------
Page 2
/conversion/tmp/activity_task_scratch/564001578.doc
6. Two vehicles are 100 kilometers apart and start moving towards each other.
Vehicle number 1 is traveling at a speed of 100 km per hour, while vehicle
number 2 is traveling at a speed of 50 km per hour.
How long will it take for the two vehicles to meet and what distance would each
of them have covered?
------------------------------------------------------------------------------------------------------------
7. Mine Stripping Ratio
How would you position the mining limit for a situation shown o the attached
section? The value of coal is the selling price of the coal after all deductions, the
mining cost is the cost of removing all of the overburden to access and mine the
coal in the given strip.
Explain your selection. Calculate the profit for both cases.
Case - 1
STRIP- 1 2
3 4 5
Case - 2
Page 3
/conversion/tmp/activity_task_scratch/564001578.doc
STRIP- 1 2
3 4 5
Seam 1
Seam 2
1A
2A
3A
4A
5A
------------------------------------------------------------------------------------------------------------
8. How many accidents are you permitted to have on a mine site each week, each
month, and each year?
------------------------------------------------------------------------------------------------------------
9. Does a vehicle roll over without any casualties classify as accident?
------------------------------------------------------------------------------------------------------------
10. How many vehicles are you allowed to overtake at any one time, on a wide road
with a no overtaking sign?
------------------------------------------------------------------------------------------------------------